Case study:Restoration of Naarkoski Torrent: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 10: | Line 10: | ||
|Location=60.64194086953129, 25.58832302562564 | |Location=60.64194086953129, 25.58832302562564 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Themes=Habitat and biodiversity | |||
|Country=Finland | |||
|Main contact forename=Kari | |||
|Main contact surname=Rantakokko | |||
|Contact organisation=SYKE | |||
|Themes= | |Name of parent multi-site project=Case_study:Restoration of Porvoonjoki River | ||
|Multi-site=No | |||
|Country= | |Project picture=Restoration of Naarkoski Torrent bypass.jpg | ||
|Picture description=Naarkoski Torrent after restoration (photo: ) | |||
|Main contact forename= | |||
|Main contact surname= | |||
|Contact organisation= | |||
|Name of parent multi-site project= | |||
|Project picture= | |||
|Picture description= | |||
}} | }} | ||
{{Case_study_subcatchment | {{Case_study_subcatchment |
Revision as of 07:15, 21 September 2012
This case study is pending approval by a RiverWiki administrator.
Location: 60° 38' 30.99" N, 25° 35' 17.96" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity |
Country | Finland |
Main contact forename | Kari |
Main contact surname | Rantakokko |
Main contact user ID | |
Contact organisation | SYKE |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Porvoonjoki River Basin |
---|---|
River basin |
Subcatchment
River name | Naarkoski Torrent |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | |
Ecoregion | Fenno-Scandian Shield |
Dominant land cover | Intensive agriculture (arable) |
Waterbody ID |
Site
Name | Naarkoski Torrent-fishway |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Ponded |
Reference morphology | Step-pool |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Ephemeral |
Dominant substrate | |
River corridor land use | Intensive agriculture (arable) |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2002/01/01 |
Works started | |
Works completed | 2003/01/01 |
Project completed | |
Total cost category | 100 - 500 k€ |
Total cost (k€) | 160 k€160,000 € <br /> |
Benefit to cost ratio | |
Funding sources | SYKE, European Regional Development Fund (ERDF), Municipality of Pukkila, Regional ELY-centre, Uusimaa Regional Council |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | Fish |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Building fishway, Introducing gravel, Building of submerged weirs and pits, Introducing stones |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|