Case study:Restoration of Kocksbybäcken brook: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 18: | Line 18: | ||
|Contact organisation=SYKE | |Contact organisation=SYKE | ||
|Contact organisation url=www.environment.fi | |Contact organisation url=www.environment.fi | ||
|Name of parent multi-site project= | |Name of parent multi-site project=Case study: Restoration of Ingarsilanjoki River | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Kocksby after restauration(Liisa Laitinen).jpg | |Project picture=Kocksby after restauration(Liisa Laitinen).jpg |
Revision as of 08:34, 11 September 2012
This case study is pending approval by a RiverWiki administrator.
Location: 60° 4' 43.22" N, 24° 13' 31.82" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity |
Country | Finland |
Main contact forename | Liisa |
Main contact surname | Laitinen |
Main contact user ID | |
Contact organisation | SYKE |
Contact organisation web site | http://www.environment.fi |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
The Kocksbybäcken brook is tributary of the Ingarskilanjoki River. Koscksbybäcken was restored as the aim of enhancing the habitat diversity of the brook for migratory trout by creating breeding habitat by adding stones and gravel in to the brook.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Ingarsilanjoki River Basin |
---|---|
River basin |
Subcatchment
River name | Kocksbybäcken Brook |
---|---|
Area category | 10 - 100 km² |
Area (km2) | 11 km²1,100 ha <br /> |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | Organic (i.e. Peat) |
Ecoregion | Fenno-Scandian Shield |
Dominant land cover | Intensive agriculture (arable) |
Waterbody ID |
Site
Name | Catchment of Kocksbybäcken Brook |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | over-widened, overdeepened, Sinuous |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Ephemeral |
Dominant substrate | |
River corridor land use | Intensive agriculture (arable) |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | 1 - 10 k€ |
Total cost (k€) | 4 k€4,000 € <br /> |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Adding sinuosity, Re-introducing stones, Introducing gravel |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish: Abundance | Improvement |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|