Case study:Restoration of Kocksbybäcken brook: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 80: Line 80:
        
        
}}
}}
{{Project_background
{{Project background
|Reach length directly affected=
|Total cost category=1 - 10 k€
   
|Total1 cost=4 k€
   
     
|Project started=
     
|Works started=
     
|Works completed=
     
|Project completed=
     
|Total cost category=
      Less than 10 k€
|Total1 cost=
      4 k€
|Funding sources=
     
|Investigation and design cost category=
     
|Invst and design cost=
     
|Investigation and design Lead organisation=
     
|Investigation and design Other contact forename=
     
|Investigation and design Other contact surname=
     
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
     
|Stakeholder engagement Other contact forename=
     
|Stakeholder engagement Other contact surname=
     
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
     
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Motivations

Revision as of 08:32, 11 September 2012

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 60° 4' 43.22" N, 24° 13' 31.82" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity
Country Finland
Main contact forename Liisa
Main contact surname Laitinen
Main contact user ID
Contact organisation SYKE
Contact organisation web site http://www.environment.fi
Partner organisations
Parent multi-site project

Case_study:Restoration of Ingarsilanjoki River

This is a parent project
encompassing the following
projects
No
Kocksby brook after restauration (photo:Liisa Laitinen)

Project summary

Edit project overview to modify the project summary.


The Kocksbybäcken brook is tributary of the Ingarskilanjoki River. Koscksbybäcken was restored as the aim of enhancing the habitat diversity of the brook for migratory trout by creating breeding habitat by adding stones and gravel in to the brook.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district Ingarsilanjoki River Basin
River basin

Subcatchment

River name Kocksbybäcken Brook
Area category 10 - 100 km²
Area (km2) 11 km²1,100 ha <br />
Maximum altitude category
Maximum altitude (m)
Dominant geology Organic (i.e. Peat)
Ecoregion Fenno-Scandian Shield
Dominant land cover Intensive agriculture (arable)
Waterbody ID



Site

Edit site
Name Catchment of Kocksbybäcken Brook
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology over-widened, overdeepened, Sinuous
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology Ephemeral
Dominant substrate
River corridor land use Intensive agriculture (arable)
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category 1 - 10 k€
Total cost (k€) 4 k€4,000 € <br />
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology Width & depth variation, Continuity for organisms
Biology Fish: Disturbance-sensitive species, Fish: Abundance
Physico-chemical Nutrient concentrations
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications Adding sinuosity, Re-introducing stones, Introducing gravel
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish: Abundance Improvement

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery


Kocsby brook before restauration (photo: Liisa Laitinen)
Kocksby restaurations (photo: Liisa Laitinen)


Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information