Case study:Restoration of Longinoja brook: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 357: | Line 357: | ||
|File name=Stream restauration by voluntary work(31).png | |File name=Stream restauration by voluntary work(31).png | ||
|Caption=Stream restoration by voluntary work_Longinoja Brook_May 2012 (photo: Auri Sarvilinna; www.environment.fi/default.asp) | |Caption=Stream restoration by voluntary work_Longinoja Brook_May 2012 (photo: Auri Sarvilinna; www.environment.fi/default.asp) | ||
}} | |||
{{Case study image | |||
|File name=After restauration.png | |||
|Caption=After restauration (photo:Liisa Laitinen, SYKE; www.itamerihaaste.net) | |||
}} | |||
{{Case study image | |||
|File name=Before restauration.png | |||
|Caption=Before restauration (photo:Harri Aulaskari; www.itamerihaaste.net) | |||
}} | }} | ||
{{Image_gallery_end}} | {{Image_gallery_end}} |
Revision as of 14:00, 27 August 2012
This case study is pending approval by a RiverWiki administrator.
Location: 60° 14' 54.16" N, 25° 1' 36.90" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Finland |
Main contact forename | Virho |
Main contact surname | Webb |
Main contact user ID | |
Contact organisation | Finnish Environment Institute |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Southern Finland |
---|---|
River basin | Vantaanjoki River |
Subcatchment
River name | Longinoja brook |
---|---|
Area category | 10 - 100 km² |
Area (km2) | 12 km²1,200 ha <br /> |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | |
Ecoregion | Fenno-Scandian Shield |
Dominant land cover | Urban |
Waterbody ID |
Site
Name | Cathment of Longinoja brook |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Straight |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | true |
National/international site designation | |
Local/regional site designations | multiple designations across the site |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Ephemeral |
Dominant substrate | |
River corridor land use | Urban |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2006/01/01 |
Works started | |
Works completed | 2011/01/01 |
Project completed | |
Total cost category | 10 - 50 k€ |
Total cost (k€) | 10000 k€10,000,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Finnish Environment Institute |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring | Finnish Environment Institute |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Building fishways, Building of submerged weirs and pits, Adding sinuosity, Introducing gravel |
Floodplain / River corridor | |
Planform / Channel pattern | Introducing sinuosity, Introducting large woody debris |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other | Information provision, Participation in works, Participation in monitoring |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Continuity for organisms | Awaiting results | |||||
Continuity of sediment transport | Awaiting results |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish: Abundance | Awaiting results | |||||
Fish: Disturbance-sensitive species | Awaiting results | |||||
Fish: Age structure | Awaiting results | |||||
Invertebrates: Abundance | Awaiting results |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Landscape enchansement | Yes | Awaiting results |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|