Case study:Restoration of Juottimenoja Brook: Difference between revisions
No edit summary |
No edit summary |
||
Line 192: | Line 192: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{ | {{Image gallery}} | ||
{{Case study image | |||
|File name=Juottimenoja restoration (photo: Liisa Laitinen).jpg | |||
|Caption=Juottimenoja restoration (photo: Liisa Laitinen).jpg | |||
}} | |||
{{Case study image | |||
|File name=Juottimenoja before restoration(2-stage drainage channel)photoAuri Sarvilinna.jpg | |||
|Caption=Juottimenoja before restoration (2-stage drainage channel) (photo: Auri Sarvilinna).jpg | |||
}} | |||
{{Image_gallery_end}} | {{Image_gallery_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} |
Revision as of 11:59, 27 August 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management |
Country | Finland |
Main contact forename | Jukka |
Main contact surname | Jormola |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Juottimenoja brook is a small tributary of the Kiskonjoki-Perniönjoki River located in south-west Finland. The surrounding of Juottimenoja is intensively cultivated and the latest dredging was in 1970. The brook suffered severe erosion and siltation problems due to erosion-prone soil, intensive farming, and previous straightening. Juottimenoja brook was restored because fields were inundating during high flows. The objective of the restoration was to decrease water levels, and thus field flooding, and control the in-channel erosion during high flows and siltation during low flows as the aim to maintain the brook morphological and ecological diversity and self-purification capacity while meeting the drainage needs of the farmland. In the latest drainage project in 2007 flood terrace were excavated and nature-like submerged weirs were constructed to stop erosion. Besides drainage the environmentally sound measures could help to maintain the original sea trout population in the brook.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Kiskonjoki-Perniönjoki River Basin |
---|---|
River basin |
Subcatchment
River name | Juottimenoja Brook |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | Organic (i.e. Peat) |
Ecoregion | Fenno-Scandian Shield |
Dominant land cover | Intensive agriculture (arable) |
Waterbody ID |
Site
Name | Juottimenoja Brook Catchment |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | eroded channel |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Ephemeral, Quick run-off |
Dominant substrate | |
River corridor land use | Intensive agriculture (arable) |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2007/01/01 |
Works started | |
Works completed | 2007/01/01 |
Project completed | |
Total cost category | 50 - 100 k€ |
Total cost (k€) | 63 k€63,000 € <br /> |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|