Case study:Doñana 2005: Difference between revisions
No edit summary |
Anna.polazzo (talk | contribs) No edit summary |
||
Line 18: | Line 18: | ||
|Name of parent multi-site project=Case_study:Recovery "CañoTravieso | |Name of parent multi-site project=Case_study:Recovery "CañoTravieso | ||
|Multi-site=Yes | |Multi-site=Yes | ||
|Project summary=The project "Doñana 2005" aims to restore and rehabilitate the complex hydraulics of the marsh, allowing the system to evolve with the highest degree of naturalness and freedom possible within the constraints of the environment of social, economic, administrative, technical, cultural, etc. There are some actuations included in this project: Route water: environmental restoration project for tourist use; Restoration of the marsh "Gallega"; Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros; Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes; Restoration of the stream of the Partido; Recovery of the functionality of Brazo de la Torre; and Recovery Caño Travieso. | |||
The main objectives are: | |||
Restore water inputs to the marsh, in quantity and quality needed to restore the water dynamics of the marsh itself Doñana. | |||
To maintain, without interruption, the permeability between the marsh of Doñana and the Guadalquivir River estuary ensuring the incorporation of flows. | |||
Establish a system for evaluation and monitoring to enable a critical assessment of compliance with the plan and promote a research agenda and a specific line of disclosure, dissemination and presentation of results. | |||
Temporarily prevent the incorporation into the marsh of contaminated water or sediments, whereas such a risk. It is also necessary to prevent such waters can be incorporated into water systems or made available to any user. | |||
}} | }} | ||
{{Image_gallery}} | {{Image_gallery}} |
Revision as of 21:53, 18 February 2014
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | to be filled |
Main contact surname | to be filled |
Main contact user ID | |
Contact organisation | MARM |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros, Recovery "CañoTravieso", Recovery of the functionality of Brazo de la Torre, Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes, Restoration of the marsh "Gallega", Restoration of the stream of the Partido |
Project summary
The project "Doñana 2005" aims to restore and rehabilitate the complex hydraulics of the marsh, allowing the system to evolve with the highest degree of naturalness and freedom possible within the constraints of the environment of social, economic, administrative, technical, cultural, etc. There are some actuations included in this project: Route water: environmental restoration project for tourist use; Restoration of the marsh "Gallega"; Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros; Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes; Restoration of the stream of the Partido; Recovery of the functionality of Brazo de la Torre; and Recovery Caño Travieso.
The main objectives are:
Restore water inputs to the marsh, in quantity and quality needed to restore the water dynamics of the marsh itself Doñana. To maintain, without interruption, the permeability between the marsh of Doñana and the Guadalquivir River estuary ensuring the incorporation of flows. Establish a system for evaluation and monitoring to enable a critical assessment of compliance with the plan and promote a research agenda and a specific line of disclosure, dissemination and presentation of results. Temporarily prevent the incorporation into the marsh of contaminated water or sediments, whereas such a risk. It is also necessary to prevent such waters can be incorporated into water systems or made available to any user.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents