Case study:Environmental restoration of the river Zújar: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 76: Line 76:
|Reach length directly affected=30000
|Reach length directly affected=30000
|Project started=2011/01/01
|Project started=2011/01/01
|Project completed=
|Total1 cost=16240
|Funding sources=C.H.Guadiana
|Funding sources=MARM
|Invst and design cost=16240
|Monitoring Other contact surname=Structure & condition of riparian zones
|Monitoring Other contact surname=Structure & condition of riparian zones
}}
}}

Revision as of 10:44, 12 February 2014

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 38° 59' 18.87" N, 5° 43' 43.44" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes
Country Spain
Main contact forename C.H.
Main contact surname Guadiana
Main contact user ID
Contact organisation MARM
Contact organisation web site
Partner organisations
This is a parent project
encompassing the following
projects
Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz., Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz., Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz., Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz.
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


This project is part of the National Strategy for River Restoration (an initiative of the Ministry of Environment, developed in the Zújar River by the Confederación Hidrográfica del Guadiana) and the State Special Fund to Revitalize Economy and Jobs (Plan E). The full project covers 30 km of the river, and to facilitate the execution of the works it was divided into four sub-projects. The main objectives of the project were: restoration and conservation of riparian vegetation; restoration of the longitudinal and lateral connectivity of the fluvial ecosystem; preservation of the Public Hydraulic Domain from new pressures; environmental education and awareness through the development of outreach activities; enable wildlife mobility; monitoring the biological and physical factors of the reach. The total budget to carry out the rehabilitation and restoration of 30 Km of the Zújar river was 16.240.282 €. The extent of the project is limited to the Public Hydraulic Domain as the first stage of what could be -thanks to land acquisition- a more ambitious floodplain restoration project.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district C.H.Guadiana
River basin Guadiana

Subcatchment

River name Zújar
Area category 1000 - 10000 km²
Area (km2) 8505 km²850,500 ha <br />
Maximum altitude category 200 - 500 m
Maximum altitude (m) 285 m0.285 km <br />28,500 cm <br />
Dominant geology Siliceous
Ecoregion Ibero-Macaronesian
Dominant land cover
Waterbody ID



Other case studies in this subcatchment: Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz., Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz., Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz., Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz.


Site

Name
WFD water body codes
WFD (national) typology Sinuous
WFD water body name
Pre-project morphology Sinuous
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations Site of Community Importance
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate Extensive agriculture, Urban
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 3000030,000 m <br />30 km <br />3,000,000 cm <br />
Project started 2011/01/01
Works started
Works completed
Project completed
Total cost category
Total cost (k€) 1624016,240 k€ <br />16,240,000 € <br />
Benefit to cost ratio
Funding sources MARM

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring Structure & condition of riparian zones



Reasons for river restoration

Mitigation of a pressure Landscape enhancement
Hydromorphology
Biology
Physico-chemical Aggregate/mineral extraction
Other reasons for the project Recovering connectivity longitudinal and transversal, Revetmens with local species


Measures

Structural measures
Bank/bed modifications Recovery of channel morphology
Floodplain / River corridor
Planform / Channel pattern Protecting and promoting wildlife, Assessment and monitoring program
Other Conditioning of recreational areas
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other Continuity for organisms, Channel pattern/planform, Structure & condition of riparian zones


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]] Before measures implemented After measures implemented Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]]

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]] Landscape enhancement"Landscape enhancement" is not in the list (Improvement, Inconclusive, Awaiting results, Deterioration, No change) of allowed values for the "Physico-chemical monitoring result" property.

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Before measures implemented After measures implemented Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information