Case study:Restoration of the River Paha-Paasonjoki: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 48: Line 48:
|Works completed=2012/12/29
|Works completed=2012/12/29
}}
}}
{{Motivations}}
{{Motivations
|Hydromorphological quality elements=Flow velocities, Channel pattern/planform,
|Biological quality elements=Fish, Invertebrates,
}}
{{Measures}}
{{Measures}}
{{Hydromorphological quality elements header}}
{{Hydromorphological quality elements header}}

Revision as of 09:04, 19 December 2013

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 66° 5' 55.64" N, 27° 25' 16.90" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Fisheries, Habitat and biodiversity, Hydromorphology
Country Finland
Main contact forename Jarmo
Main contact surname Huhtala
Main contact user ID User:Kasvio
Contact organisation Centre for Economic Development, Transport and the Environment for Lapland
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
The river Paha-Paasonjoki after the restoration (photo J. Huhtala)

Project summary

Edit project overview to modify the project summary.


The River Paha-Paasonjoki is 2 020 meters long and it flows though forest areas from the Lake Paha-Paasonjärvi to the river Paasonjoki. The catchment area is 97,92 km2. The river bed is mainly sand and contains rocks and gravel. A big part of the river is marked as nature conservation area. The water quality in the river is good or very good.

The Centre for Economic Development, Transport and the Environment for Lapland restored three sections in the River. The restoration was made to improve the living conditions of the fish and other species. Rocks and gravel was placed to the river to make rapid areas more suitable for the trouts to reproduce. The aim of the retoration was to improve the living conditions of migratory fish and to make the river more nature-like and closer to its natural state. Trouts, grayling and macro invertebrates will benefit from the restoration and not only in the river but also in the nearby lakes. The rivers in the area are straightened for log floating since 1900 century. Also the natural state in the rivers are altered because of intense forestry and bog drainage.

The restoration plan was accepted 4.3.2011 and the work started immediately. The plan was restore six rivers in the area. The area is highly appreciated among the fly fishers and its very popular recreational area.

The restoration plan aimed to slow down the current and produce suitable nesting habitats for the trouts and shelter places for the juveniles. Also versatility to the river bed was improved by digging few wider areas. Gravel was brought approximately 40 m3 and placed to the river in several places bed to ensure the nesting habitats for the migratory fish. Before the restoration many stones were taken away from from the river and places a side of the river. All the stones that were piled up next to the river were used in the restoration work. Also wooden material was used to give more habiitats for invertebrates and versatility to the river flow.

The lenght of the first restored area is 260 meters and the width is 3,5 in average and the total area of the restoration is 1 000 m2. There are a lot of moss and algae growth because of eutrofication and nutirens coming from the forestry ares above the area. The nesting gravel is partly covered up with sand and sediment. The second was 640 meters long, width 4 meters and the area in total was 2 560 m2. The restored rapid area in the totally was 1900 m2. The thirds section was 460 meters, width 4 meters and the area was 2 000 m2.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


The River Paha-Paasonjoki before the restoration (photo Huhtala)
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present Yes
Invasive species present Yes
Species of interest Brown trout (Salmo trutta), brook trout, grayling (Thymallus thymallus)
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category 2 - 5 m
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category 0.01 - 0.1
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 1 2801,280 m <br />1.28 km <br />128,000 cm <br />
Project started 2011/03/04
Works started
Works completed 2012/12/29
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Flow velocities, Channel pattern/planform
Biology Fish, Invertebrates
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information