The total budget for carry out the rehabilitation and restoration of 30 Km of the Zújar river is 16.240.282 €. The extent of the project is limited to the Public Hydraulic Domain as the first stage of what could be a more ambitious project like recovering the floodplain by land acquisition to give more space to the river, etc. | The total budget for carry out the rehabilitation and restoration of 30 Km of the Zújar river is 16.240.282 €. The extent of the project is limited to the Public Hydraulic Domain as the first stage of what could be a more ambitious project like recovering the floodplain by land acquisition to give more space to the river, etc. | ||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=033 Rio Zujar desembocadura CHGUADIANA 004.jpg | |||
|Caption=Aerial view of the restoration area | |||
}} | |||
{{Case study image | |||
|File name=033 Rio Zujar desembocadura CHGUADIANA 004 I.jpg | |||
|Caption=Zujar River before works | |||
}} | |||
{{Case study image | |||
|File name=033 Rio Zujar desembocadura CHGUADIANA 004 II.jpg | |||
|Caption=Zujar River before works | |||
}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 193: | Line 210: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Case study documents | {{Case study documents | ||
Line 217: | Line 220: | ||
{{Supplementary_Information | {{Supplementary_Information | ||
|Information= | |Information= | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Revision as of 18:22, 6 September 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | http://www.mma.es/secciones/acm/aguas%20continent%20zonas%20asoc/dominio%20hidraulico/conserv%20restaur/pdf/Rio%20Zujar%20Vado%20Entrerrios.pdf |
Themes | |
Country | Spain |
Main contact forename | C.H. |
Main contact surname | Guadiana |
Main contact user ID | |
Contact organisation | MARM |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This project is part of the National Strategy for River Restoration (an initiative of the Ministry of Environment and developed at the Zújar River by the Confederación Hidrográfica del Guadiana) and the State Special Fund for Revitalize Economy and Jobs (Plan E). The full project covers 30 km of the river, and for facilitating the execution of the works is divided in four sub-projects.
The main objectives of the project are: Restoration and conservation of the riparian vegetation; to consolidate the longitudinal connectivity and the lateral connectivity of the fluvial ecosystem; preserve the Public Hydraulic Domain from new pressures; environmental education and awareness through the development of outreach activities; to enable the wildlife mobility; and monitoring the biological and physical factors of the reach.
The total budget for carry out the rehabilitation and restoration of 30 Km of the Zújar river is 16.240.282 €. The extent of the project is limited to the Public Hydraulic Domain as the first stage of what could be a more ambitious project like recovering the floodplain by land acquisition to give more space to the river, etc.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Environmental restoration of the river Zújar, Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz., Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz., Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz., Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz.
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|