Case study:Rheinauen bei Rastatt: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 17: Line 17:
|Multi-site=No
|Multi-site=No
}}
}}
{{Image gallery}}
{{Image gallery end}}
{{Toggle button}}
{{Toggle content start}}
{{Case study subcatchment}}
{{Case study subcatchment}}
{{Site
{{Site
Line 98: Line 102:
{{Monitoring documents}}
{{Monitoring documents}}
{{Monitoring documents end}}
{{Monitoring documents end}}
{{Image gallery}}
{{Image gallery end}}
{{Additional Documents}}
{{Additional Documents}}
{{Case study documents
{{Case study documents
Line 108: Line 110:
{{Additional links and references footer}}
{{Additional links and references footer}}
{{Supplementary Information}}
{{Supplementary Information}}
{{Toggle content end}}

Revision as of 11:24, 6 September 2013

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 48° 52' 50.29" N, 8° 8' 21.57" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site http://www.rheinauen-rastatt.de
Themes Habitat and biodiversity, Hydromorphology, Monitoring, Water quality
Country Germany
Main contact forename Daniel
Main contact surname Raddatz
Main contact user ID
Contact organisation Regierungspraesidium Karlsruhe
Contact organisation web site http://www.rp-karlsruhe.de
Partner organisations Stiftung Naturschutzfonds Baden-Württemberg
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name River Rhine (and Murg, not displayed)
WFD water body codes 3-OR4 (34-03-OR4)
WFD (national) typology Type 4 "gravel and stone embossed flow of the Alpine foothills"
WFD water body name Oberrhein
Pre-project morphology Low gradient passively meandering
Reference morphology Low gradient passively meandering
Desired post project morphology
Heavily modified water body Yes
National/international site designation EU - Special Area of Conservation
Local/regional site designations
Protected species present Yes
Invasive species present No
Species of interest many protected species
Dominant hydrology
Dominant substrate gravel and sand
River corridor land use Plantation forestry, Alluvial Forest
Average bankfull channel width category more than 50 m
Average bankfull channel width (m)
Average bankfull channel depth category 2 - 5 m
Average bankfull channel depth (m)
Mean discharge category more than 1000 m³/s
Mean annual discharge (m3/s) 12501,250 m³/s <br />1,250,000 l/s <br />
Average channel gradient category 0.001 - 0.01
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 30003,000 m <br />3 km <br />300,000 cm <br />
Project started 2011/01/01
Works started
Works completed
Project completed 2015/12/31
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources European Commission LIFE-Nature programme, State, Communities, NGOs, Associations

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Regierungspraesidium Karlsruhe
Stakeholder engagement and communication Regierungspraesidium Karlsruhe
Works and works supervision Regierungspraesidium Karlsruhe
Post-project management and maintenance Regierungspraesidium Karlsruhe
Monitoring Regierungspraesidium Karlsruhe



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project Improvement for habitats and species of NATURA 2000 guideline


Measures

Structural measures
Bank/bed modifications Bank restoration, island restoration
Floodplain / River corridor reconnection of oxbow
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish Yes Yes Yes No No
Macrophytes Yes Yes Yes No No
Angiosperms Yes Yes No No No
Invertebrates Yes Yes No No No

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information