Case study:Restoration project of the degraded area of the Molí source environment and improvement of river areas and adjacent riparian formations: Difference between revisions
No edit summary |
No edit summary |
||
Line 22: | Line 22: | ||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009.jpg | |||
|Caption=Map of the restoration area | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 I.jpg | |||
|Caption=Map of the restoration area | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 II.jpg | |||
|Caption=Aerial view of the restoration area | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 III.jpg | |||
|Caption=Photos of the area before works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 IV.jpg | |||
|Caption=Photos of the area before works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 V.jpg | |||
|Caption=Photos of the area before works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 VI.jpg | |||
|Caption=Photos of the area before works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 VII.jpg | |||
|Caption=Photos of the area during works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 VIII.jpg | |||
|Caption=Photos of the area during works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 IX.jpg | |||
|Caption=Photos of the area during works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 X.jpg | |||
|Caption=Photos of the area after works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 XI.jpg | |||
|Caption=Photos of the area after works | |||
}} | |||
{{Case study image | |||
|File name=056 Fluvia en Besalu PIRORIENTAL 009 XII.jpg | |||
|Caption=Photos of the area after works | |||
}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 192: | Line 248: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Case study documents | {{Case study documents | ||
Line 277: | Line 279: | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Revision as of 11:06, 6 September 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | Naturalea S.L. |
Main contact surname | Naturalea S.L. |
Main contact user ID | |
Contact organisation | Naturalea S.L. |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The area to be restored has been divided into two sections. In the first, there is a medieval wall damaged by time and erosion visible on the slope that separates the river bed. In the second, we see the effects of erosion caused by a channel: nearly vertical slope with landslides in some areas.
The main actions in this project are: the use of new bioengineering elements in order to stabilize slope banks and to prevent erosion in town wall; replaced the hard defenses by bioengineering structures; facilitate natural regeneration of riparian vegetation.
The project has a total budget of 94.788,5 € and is financed by the Municipality of Besalú.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|