Case study:Restoration of the marsh "Gallega": Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 27: Line 27:
*Temporarily prevent the incorporation into the marsh of contaminated water or sediments, whereas such a risk. It is also necessary to prevent such waters can be incorporated into water systems or made available to any user.
*Temporarily prevent the incorporation into the marsh of contaminated water or sediments, whereas such a risk. It is also necessary to prevent such waters can be incorporated into water systems or made available to any user.
}}
}}
{{Image gallery}}
{{Case study image
|File name=016 Restauracion marisma Gallega CHGUADALQUIVIR 005.jpg
|Caption=Aerial view of Gallega marsh in October 2004
}}
{{Case study image
|File name=016 Restauracion marisma Gallega CHGUADALQUIVIR 005 I.jpg
|Caption=Aerial view of Gallega marsh in 2007
}}
{{Case study image
|File name=016 Restauracion marisma Gallega CHGUADALQUIVIR 005 II.jpg
|Caption=Gallega marsh from the FAO embankment
}}
{{Case study image
|File name=016 Restauracion marisma Gallega CHGUADALQUIVIR 005 III.jpg
|Caption=Permeabilization works on the side wall
}}
{{Case study image
|File name=016 Restauracion marisma Gallega CHGUADALQUIVIR 005 IV.jpg
|Caption=View of the drainage network in the marsh Gallega
}}
{{Image_gallery_end}}
{{Toggle button}}
{{Toggle content start}}
{{Case_study_subcatchment
{{Case_study_subcatchment
|Subcatchment=
|Subcatchment=
Line 197: Line 221:
{{Monitoring_documents}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Image gallery}}
{{Case study image
|File name=016 Restauracion marisma Gallega CHGUADALQUIVIR 005.jpg
|Caption=Aerial view of Gallega marsh in October 2004
}}
{{Case study image
|File name=016 Restauracion marisma Gallega CHGUADALQUIVIR 005 I.jpg
|Caption=Aerial view of Gallega marsh in 2007
}}
{{Case study image
|File name=016 Restauracion marisma Gallega CHGUADALQUIVIR 005 II.jpg
|Caption=Gallega marsh from the FAO embankment
}}
{{Case study image
|File name=016 Restauracion marisma Gallega CHGUADALQUIVIR 005 III.jpg
|Caption=Permeabilization works on the side wall
}}
{{Case study image
|File name=016 Restauracion marisma Gallega CHGUADALQUIVIR 005 IV.jpg
|Caption=View of the drainage network in the marsh Gallega
}}
{{Image_gallery_end}}
{{Additional Documents}}
{{Additional Documents}}
{{Case study documents
{{Case study documents
Line 250: Line 252:
}}
}}
{{Case_study_upload}}
{{Case_study_upload}}
{{Toggle content end}}

Revision as of 10:57, 6 September 2013

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 37° 6' 32.39" N, 6° 22' 46.03" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes
Country Spain
Main contact forename MARM
Main contact surname MARM
Main contact user ID
Contact organisation MARM
Contact organisation web site
Partner organisations
Parent multi-site project

Case_study:Doñana 2005

This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The project "Doñana 2005" aims to restore and rehabilitate the complex hydraulics of the marsh, allowing the system to evolve with the highest degree of naturalness and freedom possible within the constraints of the environment of social, economic, administrative, technical, cultural, etc. There are some actuations included in this project: Route water: environmental restoration project for tourist use; Restoration of the marsh "Gallega"; Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros; Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes; Restoration of the stream of the Partido; Recovery of the functionality of Brazo de la Torre; and Recovery Caño Travieso.

The main objectives are: *Restore water inputs to the marsh, in quantity and quality needed to restore the water dynamics of the marsh itself Doñana. *To maintain, without interruption, the permeability between the marsh of Doñana and the Guadalquivir River estuary ensuring the incorporation of flows. *Establish a system for evaluation and monitoring to enable a critical assessment of compliance with the plan and promote a research agenda and a specific line of disclosure, dissemination and presentation of results. *Temporarily prevent the incorporation into the marsh of contaminated water or sediments, whereas such a risk. It is also necessary to prevent such waters can be incorporated into water systems or made available to any user.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Aerial view of Gallega marsh in October 2004
Aerial view of Gallega marsh in 2007
Gallega marsh from the FAO embankment
Permeabilization works on the side wall
View of the drainage network in the marsh Gallega
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district C.H.Guadalquivir
River basin Guadalquivir

Subcatchment

River name Guadiamar
Area category
Area (km2)
Maximum altitude category Less than 100 m
Maximum altitude (m) 2 m0.002 km <br />200 cm <br />
Dominant geology Calcareous, Silts and clays
Ecoregion Ibero-Macaronesian
Dominant land cover Wetland
Waterbody ID



Other case studies in this subcatchment: Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area, Restoration of the marsh "Gallega"


Site

Name Marisma Gallega
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Marsh
Reference morphology Marsh
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations Area of Special Conservation Interest
Protected species present
Invasive species present
Species of interest
Dominant hydrology Tidal
Dominant substrate Silt, Clay
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2005/01/01
Works started
Works completed 2005/11/01
Project completed
Total cost category 1000 - 5000 k€
Total cost (k€) 2746 k€2,746,000 € <br />
Benefit to cost ratio
Funding sources FEDER, MARM

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision C.H.Guadalquivir
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Pollution incident
Hydromorphology Channel pattern/planform
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern Restore the original morphology of the marsh, Reconnect and restore aquatic habitats
Other Permeabilize the side wall of the FAO
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information