Case study:Biologisk återställning i Rolfsåns vattensystem: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 12: | Line 12: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Project web site url=projektwebbar.lansstyrelsen.se/rolfsan/Sv/Pages/default.aspx | |||
|Country=Sweden | |Country=Sweden | ||
|Main contact forename=Anna | |Main contact forename=Anna | ||
|Main contact surname=Ek | |Main contact surname=Ek | ||
|Contact organisation=County Administrative Board of Västra Götaland | |Contact organisation=County Administrative Board of Västra Götaland | ||
|Multi-site=Yes | |Multi-site=Yes | ||
}} | }} |
Revision as of 14:06, 16 August 2012
This case study is pending approval by a RiverWiki administrator.
Location: 57° 29' 20.85" N, 12° 7' 12.51" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | http://projektwebbar.lansstyrelsen.se/rolfsan/Sv/Pages/default.aspx |
Themes | |
Country | Sweden |
Main contact forename | Anna |
Main contact surname | Ek |
Main contact user ID | |
Contact organisation | County Administrative Board of Västra Götaland |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
Apelnäs fishway at River Rolfså, Bosgården nature-like fishway at River Rolfså, Dam removal at Grönkullen, River Rolfsån, Restorations of River Nolån-Hulta dam removal, ´Restorations of River Nolån-Bypass channel in Hulta Hydro power plant, ´Restorations of River Nolån-Fishway in Forsa hydro power plant, Ålgårda nature-like bypass channel at River Rolfsån |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Skagerrak and Kattegat River basin |
---|---|
River basin | Rolfsån River Basin |
Subcatchment
River name | River Rolfsån |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | Organic (i.e. Peat) |
Ecoregion | Fenno-Scandian Shield |
Dominant land cover | Woodland, Intensive agriculture (arable) |
Waterbody ID |
Other case studies in this subcatchment: Apelnäs fishway at River Rolfså, Bosgården nature-like fishway at River Rolfså, Dam removal at Grönkullen, River Rolfsån, Restorations of River Nolån-Hulta dam removal, ´Restorations of River Nolån-Bypass channel in Hulta Hydro power plant, ´Restorations of River Nolån-Fishway in Forsa hydro power plant, Ålgårda nature-like bypass channel at River Rolfsån
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | There were several dams |
Reference morphology | To take off old dams and build fisways next to relevant dams |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | EU - Special Area of Conservation |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | Gravel, Sand, Cobble |
River corridor land use | Woodland |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2006/01/01 |
Works started | |
Works completed | 2012/01/01 |
Project completed | |
Total cost category | 100 - 500 k€ |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | County Administrative Board of Västra Götaland, Federal Nature Protection Agency, Energy company producing water electricity (Göteborg Energi) |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | County Administrative Board of Västra Götaland | Anna | Ek | ||
Stakeholder engagement and communication | County Administrative Board of Västra Götaland | Anna | Ek | ||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Removal of old dams, Building fishways |
Floodplain / River corridor | |
Planform / Channel pattern | Removal of old dams, Building fishways |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Continuity for organisms |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish: Disturbance-sensitive species | ||||||
Fish: Abundance | ||||||
Fish: Species composition | ||||||
Invertebrates: Disturbance-sensitive species |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|