Case study:Tolka Valley Park at Finglas: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 26: | Line 26: | ||
}} | }} | ||
{{Project background}} | {{Project background}} | ||
{{Motivations}} | {{Motivations | ||
|Specific mitigation=pollution from landfill site | |||
}} | |||
{{Measures}} | {{Measures}} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} |
Revision as of 09:02, 2 August 2013
This case study is pending approval by a RiverWiki administrator.
Location: 53° 22' 40.44" N, 6° 18' 36.68" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Social benefits |
Country | Ireland |
Main contact forename | Maryann |
Main contact surname | Harrie |
Main contact user ID | |
Contact organisation | Dublin City Council |
Contact organisation web site | http://www.dublincity.ie |
Partner organisations | |
This is a parent project encompassing the following projects |
Tolka Valley Park at Finglas 2, Tolka Valley Park at Finglas 3, Tolka Valley Park erosion control |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
Constructed 1999-2000 to address misconnections and domestic effluents. Restoration actions aimed to attenuate pollutants and reduce malodours to enhance the amenity value of the pond by creating of a new wetland for local biodiversity. A pilot study was completed before the site was restored.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | |
Local/regional site designations | |
Protected species present | Yes |
Invasive species present | No |
Species of interest | Otter (Lutra lutra), Atlantic salmon (Salmo salar), Trout, Bats (4 spp.), kingfisher (Alcedo atthis) |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | pollution from landfill site |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|---|
http://www.dublincity.ie/RecreationandCulture/DublinCityParks/VisitaPark/Pages/TolkaValleyPark.aspx | Dublin City Council local parks: the Tolka Valley Park |
Supplementary Information
Edit Supplementary Information