Revision as of 17:40, 31 July 2012
This case study is pending approval by a RiverWiki administrator.
Location: 52° 22' 31.80" N, 5° 37' 30.00" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Water quality |
Country | Netherlands |
Main contact forename | Rutger |
Main contact surname | Blankvoort |
Main contact user ID | |
Contact organisation | Rijkswaterstaat Oost-Nederland |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
Millingerwaard-Floodplain rehabilitation, Ontpoldering Noordwaard, Uiterwaardvergraving Keizers- en Stobbenwaarden en Olsterwaarden |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Rhine |
---|---|
River basin | Rhine |
Subcatchment
River name | Rhine |
---|---|
Area category | 1000 - 10000 km² |
Area (km2) | |
Maximum altitude category | 1000 - 2000 m |
Maximum altitude (m) | |
Dominant geology | Siliceous |
Ecoregion | Central Plains |
Dominant land cover | Grassland, Urban |
Waterbody ID |
Other case studies in this subcatchment: Amerongse Bovenpolder, Bakenhof Dyke reconstruction, Blauwe Kamer, Ruppoldingen, Upper Main catchment restoration
Site
Name | Hondsbroeksche Pleij |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Single channel, Revetments, High width:depth, Entrenched |
Reference morphology | Single channel, Sinuous, Pool-riffle |
Desired post project morphology | |
Heavily modified water body | true |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Quick run-off, Groundwater, Artificially regulated, Tidal |
Dominant substrate | Bedrock |
River corridor land use | Extensive agriculture, Urban, Grassland |
Average bankfull channel width category | 10 - 50 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 5 - 10 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2003/01/01 |
Works started | |
Works completed | 2008/01/01 |
Project completed | |
Total cost category | more than 10000 k€ |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | Rijkswaterstaat Oost-Nederland | ||||
Stakeholder engagement and communication | Rijkswaterstaat Oost-Nederland | ||||
Works and works supervision | Rijkswaterstaat Oost-Nederland | ||||
Post-project management and maintenance | Rijkswaterstaat Oost-Nederland | ||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Removal of revetments, Reduction of bank slope |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other | Information provision, Consultation, Participation in works, Participation in design |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||