Case study:Aaijen- Removal of bank fixation: Difference between revisions
Jump to navigation
Jump to search
(XML import) |
No edit summary |
||
Line 13: | Line 13: | ||
51.581,6.0405 | 51.581,6.0405 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Themes=Flood risk management, Monitoring, Water quality | |||
|Country=Netherlands | |||
|Main contact forename=Frans | |||
|Main contact surname=Kerkum | |||
|Contact organisation=Rijkswaterstaat Waterdienst | |||
|Themes= | |Multi-site=No | ||
|Country= | |||
|Main contact forename= | |||
|Main contact surname= | |||
|Contact organisation= | |||
|Multi-site= | |||
}} | }} | ||
{{Case_study_subcatchment | {{Case_study_subcatchment |
Revision as of 15:55, 30 November 2012
This case study is pending approval by a RiverWiki administrator.
Location: 51° 34' 51.60" N, 6° 2' 25.80" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Monitoring, Water quality |
Country | Netherlands |
Main contact forename | Frans |
Main contact surname | Kerkum |
Main contact user ID | |
Contact organisation | Rijkswaterstaat Waterdienst |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Meuse |
---|---|
River basin | Meuse |
Subcatchment
River name | Meuse |
---|---|
Area category | more than 10000 km² |
Area (km2) | 465465 km² <br />46,500 ha <br /> |
Maximum altitude category | 100 - 200 m |
Maximum altitude (m) | 200200 m <br />0.2 km <br />20,000 cm <br /> |
Dominant geology | chalk and loess |
Ecoregion | Western Plains |
Dominant land cover | Intensive agriculture, Urban |
Waterbody ID |
Other case studies in this subcatchment: Meers - Floodplain lowering, Reméandration du Geer à Grand-Axhe, Rijkelse Bemden - River bed widening, Voorste Nete at Dessel
Site
Name | Aijen |
---|---|
WFD water body codes | |
WFD (national) typology | R7 |
WFD water body name | |
Pre-project morphology | Straight, High width:depth |
Reference morphology | Single channel, Sinuous |
Desired post project morphology | |
Heavily modified water body | true |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | Silt, Sand |
River corridor land use | Urban, Intensive agriculture |
Average bankfull channel width category | 10 - 50 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 5 - 10 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 400 m0.4 km <br />40,000 cm <br /> |
---|---|
Project started | 2005/01/01 |
Works started | 2005/01/01 |
Works completed | 2006/01/01 |
Project completed | |
Total cost category | 50 - 100 k€ |
Total cost (k€) | 74 k€74,000 € <br /> |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Removal of bank fixation to aid natural erosion |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Continuity for organisms | Yes | Yes | Yes | Improvement |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Macrophytes | Yes | Yes | Improvement | |||
Invertebrates: Taxonomic composition | Yes | Improvement | ||||
Invertebrates: Abundance |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|