Case study:River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 10: Line 10:
|Location=41.66319820116276, 2.2888898849487305
|Location=41.66319820116276, 2.2888898849487305
}}
}}
{{Project_overview
{{Project overview
|Status=
|Status=Complete
   
|Country=Spain
   
|Main contact forename=Naturalea S.L.
      Complete
|Main contact surname=Naturalea S.L.
|Project web site url=
|Contact organisation=Naturalea S.L.
     
|Multi-site=No
|Themes=
|Project summary=The restored section has a length of 650m, a common channel between 4 and 6 m and a width of 35m in ordinary floods. The slope of the river terrace is bound by dikes and embankments in some places not stabilized in others and longitudinal continuity of the river influenced by two rip-raps. There are occupations of the river area for industrial activities and eventually discharges of debris. As relevant to vegetation, effects of overgrazing are detected and a significant proliferation of exotic species.
     
The main objectives of this project are: limit the presence and possible expansion of invasive exotic species of vascular plants; removal of non-functional riprap stretches the right margin; increase morphological heterogeneity in the right margin; promote the recovery of native riparian vegetation; minimize the impact of human activities taking place in the fluvial environment and are likely to maintain or produce impacts; improving the landscape and the river ecosystem.
|Country=
The project has a total budget of 155.568,08 € and is financed by the Consorci of Besós.
      Spain
 
|Main contact forename=
     
|Main contact surname=
     
|Main contact id=
     
|Contact organisation=
      Naturalea S.L.
|Contact organisation url=
     
|Partner organisations=
     
|Multi-site=
     
|Name of parent multi-site project=
     
|Project picture=
     
|Picture description=
     
|Project summary=
     
}}
}}
{{Case_study_subcatchment
{{Case_study_subcatchment

Revision as of 08:22, 19 February 2013

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 41° 39' 47.51" N, 2° 17' 20.00" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes
Country Spain
Main contact forename Naturalea S.L.
Main contact surname Naturalea S.L.
Main contact user ID
Contact organisation Naturalea S.L.
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The restored section has a length of 650m, a common channel between 4 and 6 m and a width of 35m in ordinary floods. The slope of the river terrace is bound by dikes and embankments in some places not stabilized in others and longitudinal continuity of the river influenced by two rip-raps. There are occupations of the river area for industrial activities and eventually discharges of debris. As relevant to vegetation, effects of overgrazing are detected and a significant proliferation of exotic species. The main objectives of this project are: limit the presence and possible expansion of invasive exotic species of vascular plants; removal of non-functional riprap stretches the right margin; increase morphological heterogeneity in the right margin; promote the recovery of native riparian vegetation; minimize the impact of human activities taking place in the fluvial environment and are likely to maintain or produce impacts; improving the landscape and the river ecosystem. The project has a total budget of 155.568,08 € and is financed by the Consorci of Besós.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district Pirineo Oriental
River basin Besós

Subcatchment

River name Congost
Area category
Area (km2)
Maximum altitude category 200 - 500 m
Maximum altitude (m) 210 m0.21 km <br />21,000 cm <br />
Dominant geology
Ecoregion Ibero-Macaronesian
Dominant land cover
Waterbody ID



Site

Edit site
Name Río Congost
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Sinuous
Reference morphology Sinuous
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category 5 - 10 m
Average bankfull channel width (m) 66 m <br />0.006 km <br />600 cm <br />
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m) 650 m0.65 km <br />65,000 cm <br />
Project started 2009/11/01
Works started
Works completed 2010/03/01
Project completed
Total cost category 100 - 500 k€
Total cost (k€) 155 k€155,000 € <br />
Benefit to cost ratio
Funding sources Consorci del Besós

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision Naturalea, S.L.
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology Channel pattern/planform, Structure & condition of riparian zones
Biology
Physico-chemical
Other reasons for the project Landscape enhancement


Measures

Edit Measures
Structural measures
Bank/bed modifications New bioengineering elements in order to stabilize slope banks, Removal rip-rap
Floodplain / River corridor Removal of exotic plants
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information