User:A.goltara: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
Line 20: | Line 20: | ||
|format=broadtable | |format=broadtable | ||
|offset=0 | |offset=0 | ||
|limit= | |limit=500 | ||
|mainlabel= | |mainlabel= | ||
|class=sortable wikitable smwtable | |class=sortable wikitable smwtable | ||
}} | }} |
Latest revision as of 14:20, 8 January 2013
This is the user page for Andrea Goltara.
Actions:
Check for coverage on start/end dates, themes and measures
Project started | Project completed | Bank and bed modifications measure | River corridor measure | Channel pattern measure | Other technical measure | Management interventions | Social measure | Theme | Biological quality element monitored | Hydromorphological quality element monitored | Physico-chemical quality element monitored | Other response monitored | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
"Rio Verde II". Restoration of riparian forest and the rivers Llobregat and Cardener | 1 January 2006 | Revetmens with local species Bank stabilisation New bioengineering elements in order to stabilize slope banks | Riparian planting | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||
Abaissement et démantèlement de trois clapets sur l’Orge aval | 1 March 2010 | 30 September 2012 | Lowering of checking valves Removal of checking valves Water supply channel lowering | Environmental flows and water resources Habitat and biodiversity Hydromorphology Water quality Urban | |||||||||
Actions for environmental regeneration and flow control in Odra's Basin, Burgos | 1 January 2009 | Revetmens with local species Removal of sediment Bank reprofiling | Removal of rubbish | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||
Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins | 1 January 2004 | Weir partial removal or permanent opening of gates allowing self restoration of previously impunded stretches | More natural reservoir releases | Social representation of the river | |||||||||
Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid | 1 January 2017 | Creation of ramp | Reforestation and restoration of watercourses Develop riparian forest Riparian planting | Awareness raising by a sign | Environmental flows and water resources Habitat and biodiversity Hydromorphology Land use management - forestry Social benefits Urban | ||||||||
Agreed definition of mobility area for the Adour | 1 January 2005 | Removal of bank reinforcements | Develop riparian forest | Definition of erodble corridor | Channel pattern/planform | ||||||||
Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot | 1 June 2012 | 30 June 2014 | Construction of a bypass channel Dam removal Creation of fish passes Creation of lateral dike to regulate flows Application of plant-engineering Riparian planting | Remeandering Creation of wetland | The banks are maintained if necessary by vegetal engineering | Flood risk management Habitat and biodiversity Hydromorphology Social benefits | |||||||
Arasement du seuil des Treize Saules sur la Quilienne | 1 October 2009 | 31 October 2009 | Barrier removal Planting of hydrophytes Bank reprofiling | Filter masses were laid downstream of the dam to limit the impact of the work on the environment | Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture | ||||||||
Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise | 1 January 2008 | 31 December 2008 | Dismantling of the mill Leveling threshold with the water level Helophytes planted Bank stabilisation Installation of geotextile | Creation of a sinuous channel | Habitat and biodiversity Spatial planning Water quality | ||||||||
Austria cross-border section - Monitoring sediment transport and Habitat modelling (ETZ-Project “DraMurCi” 2009-2013) | 1 January 2009 | 1 January 2013 | Self-initiated bank erosion by sediment input | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||
Austria cross-border section - River widening Sicheldorf (ETZ-Project “DraMurCi” 2009-2013) | 1 January 2009 | 31 December 2013 | Construction gravel bays Creation of islands Removal of bank reinforcements | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||
Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) | 1 January 2002 | 31 December 2007 | Creation of undercut banks Restoration of the connection of side arms Creation of Slips Creation of fords Creation of potholes Creation of gravel banks | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||
Austria cross-border section - River widening measure Gosdorf II (ETZ-Project “DraMurCi” 2009-2013) | 1 January 2009 | 31 December 2013 | habitat improvements | Channel widening Habitat creation | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||
Austria/Slovenia Urban River Landscape - ETZ-“Skupaj“ - Joint urban and natural development at the Mur banks in Gornja Radgona and Bad Radkersburg | 2008 | Economic aspects Environmental flows and water resources Habitat and biodiversity Social benefits Spatial planning Urban | |||||||||||
Austria/Slovenia cross-border cooperation - “Die Murkommission” – Bilateral River Commission | Economic aspects Environmental flows and water resources Fisheries Flood risk management Habitat and biodiversity Hydropower Hydromorphology Land use management - agriculture Land use management - forestry Monitoring Social benefits Spatial planning Water quality Urban | ||||||||||||
Austria/Slovenia cross-border section - ETZ-Project “DraMurCi” 2009-2013 | 1 January 2009 | 31 December 2013 | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology | ||||||||||
Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 | 1 January 2003 | 31 December 2008 | reactivation and extending of tributary streams Bed load addition | Regeneration of alluvial forests | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||
Basic proposals for restoration and enhancement of the stream of Vilamajor in Sant Antoni de Vilamajor | 1 January 2010 | New bioengineering elements in order to stabilize slope banks | Protect/restore riparian zone | Works to safeguard the bridge | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||
Bidasoa Dam removal | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||||||
Bidasoa Dam removal 2 | 4 October 2016 | Dam removal | Barrier removal Connection to wider floodplain | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||
Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras | 1 January 2009 | 1 January 2012 | Removal of metal sheet piles installation of bio-engeneering bank protection Helophytes planted Installation of geotextile Gabion bed | Planting of helophytes at the foot of banks Seeding of work areas with a mix of herbaceous plant restoration of wooded areas by planting white willows Elimination of the invasive species found on site Creation of pond | Habitat and biodiversity Water quality | ||||||||
Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec | 1 September 2011 | 1 December 2011 | Removal of metal sheet piles Installation of geotextile | Planting of helophytes at the foot of banks | Environmental flows and water resources Habitat and biodiversity | ||||||||
Biodiversity conservation and recovery in the river basin Asón | 1 May 1999 | Weir removal | Removal of exotic plants | Capreolus capreolus Columba palumbus andAguila chrysaetos Management for increase species like Lepus europaeus | Surveillance patrols managed fire risk and hunting | Quantity & dynamics of flow | |||||||
Biomura LIFE06NAT/SI/000066 | 1 October 2006 | Natural erosion embankments Connection between river channel and former side branches Gravel bar | Partially filled river sleeves - restored and cleaned of debris new river oxbows | Channel widening | Habitat and biodiversity Water quality | ||||||||
Bird Reserve “Tancat de la Pipa” (Valencia) | 1 January 2007 | Green filters creation and two shallow permanent lagoons | Channels daily management vegetation and maintenance active | Sensitization environmental education of scholars public use and elaboration of dissemination materials | Environmental flows and water resources Habitat and biodiversity Land use management - agriculture Monitoring Social benefits Water quality | ||||||||
Bird reserve “El Clot” (Tarragona) | 1 January 1998 | Habitat improvement through water and vegetation management | Scientific bird banding workshops activities performed by volunteers environmental awareness | Environmental flows and water resources Habitat and biodiversity Land use management - agriculture Social benefits Spatial planning | |||||||||
Bird reserve “Finca San Miguel” (Huesca) | 1 January 2013 | Grants from the Administration Surveillance Tracing of aquatic birds prevention and monitoring of poaching. | Sensitization awareness campaigns and elaboration of dissemination materials | Environmental flows and water resources Habitat and biodiversity Land use management - agriculture Social benefits Spatial planning | |||||||||
Bird reserve “Las Marismas Blancas” (Cantabria) | 1 January 1999 | Implantation of amphibian ponds fenced construction for won elimination of invasive species installation of artificial islets. | Town hall workers | Sensitization awareness campaigns and elaboration of dissemination materials | Environmental flows and water resources Habitat and biodiversity Social benefits Spatial planning | ||||||||
Bird reserve “Los Albardales” (Madrid) | 1 January 1980 | Monitoring the species of birds | Sensitization awareness campaigns and elaboration of dissemination materials | Habitat and biodiversity Spatial planning | |||||||||
Bird reserve “O Grove” (Pontevedra) | 1 January 2000 | Grants and help from town hall | Sensitization awareness campaigns and elaboration of dissemination materials | Environmental flows and water resources Habitat and biodiversity Social benefits Spatial planning | Birds | ||||||||
Bird reserve “Riet Vell” (Tarragona) | 1 January 1997 | Stablish crops of ecologic rice regenerate habitats of wetlands enviroments recover local vegetation and conserve aquatic birds | Sensitization awareness campaigns and elaboration of dissemination materials | Environmental flows and water resources Habitat and biodiversity Land use management - agriculture Social benefits Spatial planning | |||||||||
Camargue’s former saltworks | 1 January 2008 | Reconnection between the sea and the lagoons artificial bird nesting islands. installation of water sluices | wetland management | Environmental flows and water resources Fisheries Habitat and biodiversity | |||||||||
Chiese river upstream Idro lake – Trentino region | Removal of embankment separating Lora stream from Chiese river | Excavation for floodplain creation | |||||||||||
Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) | Creation of wetland | Removal of fords Construction of new bridges | Reduced water abstractions | Fish: Species composition | Continuity for organisms Width & depth variation | ||||||||
Conservation the public water domain in the Tajo basin, t. m. Alcocer, province of Guadalajara. | 1 January 2006 | Creation of fish ladders | Fisheries Hydromorphology | ||||||||||
Contournement d’un plan d’eau de loisirs sur le Gratteloup au niveau de la commune de La Ville-aux-Clercs | 1 January 1998 | 31 December 1998 | Creation of a bypass Creation of banks Installation of a mobile threshold Installation of a valve rack | Fisheries Habitat and biodiversity Social benefits Water quality | |||||||||
Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros | 1 April 1998 | Construction of a defensive wall to prevent river pollution After decontamination removal of the defensive wall | Environmental flows and water resources Monitoring Water quality | ||||||||||
Creation and restoration of a riparian zone | Pond creation | River forest has been restored through the plantation of species typical from habitat 92AO | Fisheries Habitat and biodiversity Social benefits Water quality | ||||||||||
Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze | 1 May 2007 | 31 August 2007 | Construction of flood channels Removal of material Pond creation Side channel creation setting up of check valves & pumping stations | Tree planting Planting of helophytes at the foot of banks | Channel widening | Flood risk management Habitat and biodiversity Hydromorphology Monitoring Social benefits Urban | |||||||
Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes | 1 November 2013 | 31 December 2015 | Removal of nozzles which provided a connection hydraulics and fish farming directly between Fliez and ponds Creation of a bypass Riverbed restoration Bank modification | Adding sinuosity | An educational trail is set up to improve access to the site and facilitate leisure activities | Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry Social benefits Water quality | |||||||
Demolition of weir on the River Nora, Nalón Basin | Weir removal | Fish: Abundance | Continuity for organisms Continuity of sediment transport | ||||||||||
Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area | 1 July 2001 | Improving water quality | Create a dynamic model of active participation of farmers in land management | Environmental flows and water resources Habitat and biodiversity Social benefits Water quality | Connection to groundwaters | Erosion | |||||||
Doñana 2005 | Removal of contaminated material Restoring function of wetlands | Landscape improvement of the area of the spill | Creating the post of Coordinator to drive the project "Doñana 2005" | ||||||||||
Démantèlement de l’ouvrage du Pont Fourneau sur la Selle | 1 September 2010 | 28 February 2011 | Barrier removal Creation of mini-treshold Installation of fish caches Installation of geotextile Planting | Habitat and biodiversity Hydromorphology | |||||||||
Démantèlement de neuf ouvrages sur le cours de l’Aa | 1 July 2009 | 30 September 2009 | Dismantling of the gates that block the water current Creation of fish pass | Bottom racks and banks were kept in order to prevent erosion One gate was kept in the river to prevent erosion | Flood risk management Habitat and biodiversity Hydromorphology Social benefits | ||||||||
Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas | 1 September 2009 | 31 December 2011 | Installation of a distribution structure and monks Creation of a bypass Filling of drainage ditches rehabilitation of ponds Three tresholds are removed or redevelopped Removal of ponds Bank protection | Meandering channel | The level of the water bodies is lowered during two months in summer and are completely drained every three to five years. | Flood risk management Habitat and biodiversity Land use management - agriculture | |||||||
ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA | 1 January 2005 | New outflow and inflow from ecoremediation system Smaller retention of the water and conversion into new channel | Creation of pond Creation of new vegetated drainage ditches Water treatment methods | Creation of meanders | maintenance of ERM system | Improved public access | Macrophytes & phytobenthos: Average abundance Macrophytes & phytobenthos: Taxonomic composition | Quantity & dynamics of flow Substrate conditions | Nutrient concentrations Oxygen balance Salinity Specific non-synthetic pollutants Specific synthetic pollutants Temperature pH | ||||
ERCIP - European River Corridor Improvement Plans | Economic aspects Flood risk management Habitat and biodiversity Hydropower Land use management - forestry Social benefits Spatial planning Water quality | ||||||||||||
Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin | 1 July 2010 | Removal of rip-rap Bank stabilisation | Removal of exotic plants | Removal of rubbish | Habitat and biodiversity Hydromorphology | ||||||||
Effacement du seuil de Carayon sur le Thoré | 1 July 2011 | 30 November 2011 | Removal of treshold Removal of supply canal to protect the banks Arches have been cleared Placement of stone walls dry work by setting up a cofferdam to temporarily deflect flow of the watercourse | Realization of an electric fishing of backup | Flood risk management Habitat and biodiversity Hydropower Hydromorphology Land use management - agriculture Urban | ||||||||
Effacement du seuil de Chelles Basse sur le Miodet | 1 June 2010 | 31 July 2010 | Abundant sand was being put on the banks Barrier removal Blocks were used to diversify the flow | Cutting trees that could be a potential danger Setting up of a diversion channel | Flood risk management Habitat and biodiversity Hydropower Hydromorphology Land use management - agriculture | ||||||||
Effacement du seuil du Moulin d’Hatrize sur l’Orne | 1 March 2011 | 31 October 2011 | Removal of spillway Destruction of large part of the dike Implantation of vegetated banquettes Bank stabilisation Planting | Development of a flow control structure tightening of the minor bed Creation of meanders | Flood risk management Habitat and biodiversity Land use management - agriculture Social benefits | ||||||||
Effacement du seuil du moulin du Bourg sur le Vicoin | 1 June 2011 | 31 October 2012 | Removal of central slab valves and spillway Creation of ramp Placing of mini-treshold in order to stabilise banks Tree planting Planting of grass | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology | |||||||||
Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste | 1 September 2009 | 30 November 2009 | Creation of notches Planting of grass Tree planting | Laying of drinking troughs and the creation of pits to house the fish fauna. | Maintenance of anchorages and other structures | Flood risk management Habitat and biodiversity Hydromorphology Water quality | |||||||
Effacement partiel de cinq seuils sur le ruisseau du Bagas | 1 October 2009 | 30 November 2009 | Partially deletion of barriers Building of armourstone downstream of the structure was built to consolidate the bank and create a channel preferential flow to guide the fish | The work was carried out dry by temporary diversion of the watercourse (cofferdam pumping and return of water downstream site) to limit their impact on the environment. | Environmental flows and water resources Habitat and biodiversity Hydromorphology Land use management - agriculture | ||||||||
Effacement partiel du seuil Cros sur la Dunière | 1 August 2009 | 31 December 2009 | Removal of a part of the dam up to 1 m Installation of three mini tresholdsto prevent erosion realization of a fishery backup and dry work with the installation of a cofferdam to temporarily deflect the flows Installation of geotextile Bank protection | Flood risk management Habitat and biodiversity Hydromorphology | |||||||||
Effacement partiel du seuil de Vas sur le Céans | 1 October 2007 | 31 October 2007 | Partially deletion of barriers Deposition of blocks to counter erosion and create a diverse profile | Preservation of side walls to prevent erosion | Economic aspects Environmental flows and water resources Habitat and biodiversity Hydromorphology Land use management - agriculture | ||||||||
Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes | 1 May 2010 | 31 August 2010 | Emptying reservoir Removal of flap gate Removal of spillway Dam removal Creation of side leats Implementation of distribution structures | Planting of banks | Environmental flows and water resources Habitat and biodiversity Hydromorphology Social benefits Water quality | ||||||||
Environmental Restoration of Olivar-El Zaudin Metropolitan Park in Tomares | 21 April 2015 | Conditioning of the banks of the stream and lagoons. | Elimination of allochthonous plant species | General cleaning of the area removal of rubble and rubbish; Reforestation of the Park with local plant species (and equipped with an irrigation network); improve existing roads and paths (3.65 km) and new pedestrian paths were planned (3.65 km); Urban furniture; Construction of a small building located in a point of maximum elevation that allows the observation of the environment | Metropolitan park (social engagement); Bird observatory and recovery organization of workshops and events for schools and other groups exhibitions on the fauna and flora of the area | Habitat and biodiversity Hydromorphology Social benefits Spatial planning | |||||||
Environmental Restoration of the Lower Section of the Bembézar River and its River Environment (Phase 1) | 8 January 2019 | Actions to improve the natural environment: Cleaning of the riverbed and the riverbank; Removal of dead vegetation and cleaning of rubbish. | Actions to improve the natural environment: Restoration of the autochthonous riverside vegetation in the sections in which the reedbed is present. It is responsible for the degradation of the autochthonous vegetation in an area which should be a riverside forest with species closer to the ecological climax; Removal of ailanthus and other invasive exotic species. | Actions of integration in a river area: Construction of a pedestrian path 2 meters wide and 3 080 meters long along the riverside forest of the Bembézar River; Construction of a footbridge over the river and improvement of difficult passageways along the path. Improvement of infrastructures for public use: Cleaning of vegetation of the existing Medieval Bridge in the Bembézar riverbed. | Habitat and biodiversity Land use management - forestry Monitoring Social benefits | ||||||||
Environmental Restoration of the Riopudio Stream in Sevilla | 1 August 2008 | Land movement (the design of the conditioning of the riverbed has been adapted to the natural conformation of the stream with slopes to avoid erosion and facilitate its subsequent revegetation); Defense of the riverbanks ( the breakwater structures foreseen in the project have been placed in order to guarantee the structural stability and the collapses to the riverbed). | shrub vegetation along the stream area speacilly the abundant of two currently invasive plants (Arundo donax and Ricinus communis) as well as tall ruderal scrubs; Environmental restoration (eliminating invasive species and weeds by clearing them while preserving and improving the aerial structure of those specimens and copses that are within the areas to be revegetated and which due to their ecological value shall be to maintained) | Landscaping and cleaning of the area (rubble removal abandoned houses and uncontrolled dumping); construction of Canadian crossings to prevent the entry of livestock and the enclosure with livestock mesh that protects the planted area and physically delimits it; Wooden footbridges; Public footpaths; Five recreation areas for rest and lesure (equipped with parking areas next to public pathways access containers rest areas with urban furniture rustic bicycle parking and interpretive posters); staggered bollards trees that allow activities in the shade | Environmental flows and water resources Land use management - forestry Spatial planning | ||||||||
Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) | 1 January 2008 | Bank stabilisation Prevent and reduce bank erosion with live stakes | Silvicultural treatments | Protection and correction of incision problems Improvement of channel morphology | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||
Environmental improvement project of the stream of Ruby | 1 December 2007 | New bioengineering elements in order to stabilize slope banks Revetmens with local species | Restoring riparian vegetation | Habitat and biodiversity Urban | |||||||||
Environmental regeneration project in Magro river bed | 1 November 2009 | Selective removal of organic muds and sludge contaminated with toxic | Cleaning channels | Conditioning roads Improved public access | |||||||||
Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias) | 1 January 2008 | Revetmens with local species New bioengineering elements in order to stabilize slope banks Removal of invasive plants | Riparian planting Silvicultural treatments | Re-instatement of old course | Promotion and management of tourism in the river | Information panels for people New pahts near the river | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology Land use management - forestry | ||||||
Environmental restoration of the river Zújar | 1 January 2011 | Recovery of channel morphology | Protecting and promoting wildlife Assessment and monitoring program | Conditioning of recreational areas | |||||||||
Environmental restoration project of the Guadajoz River (Castro del Río, Andalusia) | 1 February 2001 | Bank stabilisation New bioengineering elements in order to stabilize slope banks Revetmens with local species | Protection and correction of incision problems | ||||||||||
Environmental restoration project of the river area of the Ripoll River as it passes through the municipality of Ripollet (Vallès Occidental) | New bioengineering elements in order to stabilize slope banks Bank stabilisation | Removal of irrigation canals Elimination of structural elements concreted Removal of exotic plants | Environmental flows and water resources Habitat and biodiversity Social benefits Urban | ||||||||||
Experimental flood in the Cardener river | Experimental flood | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||||
Experimental flood in the Ebro river | Experimental flood | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||||
Experimental flood in the Pisuerga river | Experimental flood | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||||
Fish pass in Las Librerías weir on the Guadiela River | Creation of fish passes | Habitat and biodiversity Hydropower | |||||||||||
Fish pass on the Najerilla River | Creation of fish passes | Habitat and biodiversity | |||||||||||
Fish passes construction on Marta River | Creation of fish passes | Habitat and biodiversity | |||||||||||
Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river | Riverbank revegetation Removal of bank reinforcements | Floodplain reconnection Creation of a flood expansion area | Channel widening | Surface drainage systems improved | Flood risk management | Quantity & dynamics of flow | hydrography, topography and geology of site | ||||||
Floodplain recreation on the Montone River at San Tomè (Forlì) | Introducing sediment | Removal of embankments Lowering of floodplain Floodplain reconnection | land acquisition | Flood risk management Habitat and biodiversity Hydromorphology Monitoring | |||||||||
Floodplain recreation on the Montone River at the confluence with the Rabbi Stream | Removal of embankments | Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture | |||||||||||
Fluvial improvement in Riera de Caldés | 1 March 2009 | Removal of rip-rap New bioengineering elements in order to stabilize slope banks | Riparian planting Removal of exotic plants | Environmental flows and water resources Hydromorphology Water quality | |||||||||
Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain | 1 November 2009 | Weir removal | Improvement of local paths and river banks | Fisheries Habitat and biodiversity Hydropower Hydromorphology | |||||||||
Fluvial restoration in River Carrión | 1 January 1996 | New bioengineering elements in order to stabilize slope banks Deflectors Creation of wooden deflectors Creation of gravel deflectors Bed load addition Bank reprofiling | Environmental flows and water resources Habitat and biodiversity Hydromorphology | Fish: Abundance | Structure & condition of riparian zones | ||||||||
Fluvial river restoration of Tordera in Sant Celoni | 1 January 2005 | Removal of invasive plants Riverbank revegetation | Riparian planting Habitat creation | Awareness raising | Environmental flows and water resources Fisheries Habitat and biodiversity Land use management - agriculture | ||||||||
Fluvial river restoration of Tordera in Tordera | Habitat creation | Re-instatement of old course Artificial wall removal | Habitat and biodiversity Hydromorphology Land use management - agriculture | ||||||||||
Guadiamar Green Corridor Project | 1 April 1998 | Recovering connectivity longitudinal and transversal | Buffer strips Recovery of dynamic river system Restoring riparian vegetation | Remove drains and pipes | Elimination of pollutants due to the discharge of toxic sludge Recovering natural habitats Recovering natural landscapes | Environmental flows and water resources Fisheries Habitat and biodiversity Water quality | Channel pattern/planform Connection to groundwaters Structure & condition of riparian zones | Acid neutralising capacity | Landscape enhancement | ||||
Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development | 1 November 2001 | Reforestation and restoration of watercourses Restoring riparian vegetation | Install a "green filter" to treat waste water | Improve forest management and agricultural Community Education | Economic aspects Habitat and biodiversity Hydromorphology Social benefits | ||||||||
HPP Blanca | 1 January 2009 | New riverbed along old channel | Creation of fish passes | Monitoring strategy | Improved cooperation between energy producers and ecologists | Fisheries Hydropower | Fish: Abundance Fish: Age structure Fish: Disturbance-sensitive species Fish: Species composition | Flow velocities | |||||
Habitat Management and Raptor Conservation in Nestos Delta and Gorge - LIFE02 NAT/GR/008489 | Habitat and biodiversity | ||||||||||||
Habitat improvement project in Segre river, in Alòs de Balaguer | Gravel bar | Re-instatement of old course Channel narrowing | Channel pattern/planform | Flood risk management | |||||||||
INTERREG MED WETNET - Membership card of the Verdier Marshes-Rhone Delta Wetland Contract | 1 November 2016 | 31 October 2019 | Maintain the South dike; Respect the natural hydrological functioning of the South basin (rain fed) to favor the installation of a vegetation characteristic of temporary low-salt marshes and vegetation of salt meadows | Add signage and interpretation on birds in the observatory | Ensure compliance with hunting regulations (ensure guarding) | Develop new artistic activities (drawing classes); Organize meetings with site users and children to discuss and promote local know-how; Maintain the monthly meetings of the association | Environmental flows and water resources Social benefits | ||||||
INTERREG MED WETNET - Memoradum on Participation in Wetland Conservation in Ljubljansko Barje Nature Park | 1 November 2016 | 31 October 2019 | mowing adapted to the conservation of species and habitat types; adequate maintenance of borders and green belts (selective logging preservation of trees maintaining adequate width of green belts along ditches and watercourses) | building of tourist infrastructure which will provide a targeted visit; | control of drainage of water from secondary arrester to main dams (river) with locks; control of drainage of water from tertiary arrester; coordinated maintenance of ditches; control of the use of fertilizers and preservatives on agricultural land; respect of the prohibition of the meadows plowing from the KPLB Regulation (also for organic farmers); establishing a zoning of individual subregions where priorities are defined in cooperation with land owners and managers of the protected area and NATURA 2000 (KPLB and ZRSVN); payment for the implementation of the adjusted use on agricultural land | awareness of stakeholders on the importance of adequate maintenance of the arrester; | Economic aspects Environmental flows and water resources Habitat and biodiversity Hydromorphology Land use management - agriculture Monitoring Social benefits | ||||||
INTERREG MED WETNET – Management Plan for the Cañizar Lagoon (ARAGON) | 1 November 2016 | 31 October 2019 | Conservation measures and environmental improvement | Environmental integration measures and agricultural uses; Environmental integration measures and livestock uses; Environmental integration measures and tourism uses; Environmental integration measures and public uses (hunting fishing ...). | Fisheries Habitat and biodiversity Land use management - agriculture Land use management - forestry Spatial planning | ||||||||
INTERREG MED WETNET – Melides Lagoon Environmental Agreement for Wetland Contract | 1 November 2016 | 31 October 2019 | Breaking the dune barrier and establishing a temporary connecting channel between the lagoon and the sea | Restoration of the Ribeira de Melides | Melides Lagoon Wastewater System; Melides Camping Site Wastewater Treatment; Reducing debris deposition in the Lagoon; Creation of infrastructure for nature tourism and environmental education on the banks of the lagoon and surrounding areas (walkways bird watching shelters resting places); Organic rice production pilot project; | Creation of a fishing reserve and legal establishment of a recreational fishing zone in the Melides Lagoon; Creation of a local multi-stakeholder association - agriculture environment governance - for the commercial promotion of local products under a local trademark. tourism | Environmental awareness raising campaing; Rehabilitation of the historical and cultural heritage of the parish (ex. St. Marinha church); development of handicraft promotion of traditional dances and songs and local gastronomy. | Economic aspects Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology Land use management - agriculture Monitoring Social benefits Water quality | |||||
INTERREG MED WETNET – Memorandum of Understanding for the realization of the Wetland Contract for the Vercelli rice plain | 1 November 2016 | 31 October 2019 | protecting and increasing biodiversity improving the landscape and the quality of water resources | Custody agreements | Economic aspects Hydromorphology Land use management - agriculture Social benefits Spatial planning Water quality | ||||||||
INTERREG MED WETNET – Negotiated Planning Agreement “Wetland Contract of the Caorle lagoon system” | 1 November 2016 | 31 October 2019 | ensuring the hydraulic protection of the area from the risk of flooding and sediment from the canals as well as from the upstream inputs | by stimulating and activating actions for the management defining and recognizing a "representative institutional model" of single reference for the coordination of the various actors ensuring and consolidating the protection in the Caorle lagoon system; establishing an operational programme that takes account of all components of the system promotion and development of the wetland area protection through an integrated approach capable of restoring lagoon dynamics | Economic aspects Environmental flows and water resources Habitat and biodiversity Land use management - agriculture Social benefits Spatial planning Water quality | ||||||||
INTERREG MED WETNET – Odiel Marshes Wetland Contract and Action plan | 1 November 2016 | 31 October 2019 | Recovery conservation and valorisation of Cárdenas marshes | Rehabilitation and valorisation of the Cojillas tidal mill; Connection project and use of livestock tracks and rural roads as green corridor; Enhancement of the connection marsh-city in front of 26 de Abril de 1963 square and estuary promenade; Project for the connection and use of livestock tracks and rural roads as green corridors (Odiel river border to the hanging bridge of a-49); Enhancement of the marsh-city connection in front of the San Felice de Circeo promenade and the surroundings of the Tejar stream | Environmental education campaigns on the Odiel marshes; “Marismas del Odiel Cero es Más” campaign; Sustainable tourism in the Odiel marshes biosphere reserve | Economic aspects Environmental flows and water resources Habitat and biodiversity Monitoring Social benefits Spatial planning | |||||||
INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract | 1 November 2016 | 31 October 2019 | Restoration and improvement of connections from natural springs; Land purchase and restoration aiming the increase of green filters and artificial wetlands around the lagoon | Ensuring an additional contribution to l’Albufera of water from the Júcar-Túria system through rapid flushing technical discharges; Increase the proportion of water inputs to l’Albufera from rivers with respect to the water inputs from sewage and treatments plants; Preserve contributions from Xúquer Turia and treatment plants controlling water quality; Improvement of the winter flood conditions and mainteneance; Improvement of the management of the lagoon gates to maintain adequate levels; Adaptation and maintenance of public irrigation systems for the contribution of water to the wetland | Improve and adapt existing sanitation infrastructure especially those oriented to the West Collector; Construction of storm tanks and tune up of those already constructed | Improvement of agri-environmental practices; Establish a protocol for the use of the ditches of the Sueca Irrigators Community to connect the Sueca irrigation system to the lagoon out of the rice growing season; The approval of the legal management instruments: plans related to the Water Framework Directive (Júcar River Basin Plan) and the Nature Directives (Natura 2000 SAC); the maintenance of the productivity of the agricultural system and the actions to deal with salinization and the negative effects of climate change on crops actions of sustainable mobility. if necessary specially rice farming; promotion of active management of the cultural resources and heritage of the wetland; definition of a plan for sustainable public use and dealing | Promotion of meeting and consultation spaces such as the creation of a virtual information center accesible to all stakeholders; Improvement of coordination with irrigation communities fishermen's associations and other groups involved; and the creation of a more inclusive wetland management body. | Environmental flows and water resources Flood risk management Hydromorphology Land use management - agriculture Monitoring Social benefits Water quality | |||||
Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) | 1 January 2009 | Lowering of lateral slopes Weir removal Removal of sediment | Riparian planting Conditioning access | Fisheries Flood risk management Habitat and biodiversity | |||||||||
Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. | 1 January 2009 | Bank stabilisation Restoration of natural vegetation | Improve longitudinal connectivity | Fish habitat restoration | Improved network of trails Information panels for people | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||
Improvement of the Terri River in the industrial zone (Phase I and II) | 1 December 2008 | Recess side slopes Barrier removal | Removal of exotic plants Creation of a flood expansion area Restoring riparian vegetation | Flood risk management Habitat and biodiversity Hydromorphology | |||||||||
Improving the ecological status of the Black River and tributaries (Zamora) | 1 January 2009 | Revetments with local species Creation of fish ladders | Develop riparian forest | Fisheries Flood risk management Habitat and biodiversity | |||||||||
Increased biodiversity, river Llobregat, Sallent. | 1 January 1994 | Embankment creation Revetments with local species | Silvicultural treatments Habitat creation | New pahts near the river | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology | ||||||||
International recovery of the river Minho: an example of sustainable hydraulic exploitation | 1 November 1999 | Creation of fish passes Improving fish migration | Fisheries Habitat and biodiversity Hydromorphology | Continuity for organisms | |||||||||
Inturia dam removal | 1 August 2013 | 1 January 2016 | Dam removal | Creation of solid flow regime | Creation of a path alongside the river Creation of viewpoint with photos and data of the dam removal | Environmental flows and water resources Habitat and biodiversity Hydropower | |||||||
LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica | January 2007 | Weir construction Bank reprofiling | Local deepening Coves and bays construction Construction of the overflows between individual meanders | Re-instatement of old course Creation of backwater | late mowing and mulching on the permanently protected land mapping of habitat types | Student Education | Habitat and biodiversity Hydromorphology Land use management - agriculture | ||||||
LIFE Charcos - Conservação de Charcos Temporários na Costa Sudoeste de Portugal (Conservation of Med Temporary Ponds in SW Portugal) | 1 July 2013 | 31 December 2017 | conservation and restoration of ponds | CTM management guidelines | conservation and restoration of ponds for public awareness | Environmental flows and water resources Habitat and biodiversity Monitoring | |||||||
LIFE ECORICE - Vercelli rice fields | 9 January 2010 | Creation and/or restoration of ecological corridors; Creation and/or restoration of core areas and stepping stones | Forestry management for heronry conservation; Guidelines for the sustainable management of the rice agroecosystem Guidelines for the forest management of heronries Integrated Action Plan for rice cultivation management | Participatory process engaging local managers users and policy makers | Environmental flows and water resources Habitat and biodiversity Land use management - agriculture Land use management - forestry Monitoring | ||||||||
LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio | 1 July 2019 | Remodeling and extension of the river bank; Remodeling also some sections of the riverbed for the creation of different conditions of the river flow speed and morpho-bathymetric heterogeneity functional to fauna especially amphibious. | Creation of a riparian arboreous shrubland; Planting of hygrophilous shrub species and a first band of elophytes (Phragmites australis Typha latifolia) and a second with shrubby and planar shrubby and arboreal species (Salix spp Populus spp Ulmus minor Quercus robur). | Landsteward agreement | Environmental flows and water resources Habitat and biodiversity Hydropower | ||||||||
LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river | 10 July 2018 | Re-development of the area through the construction of permanent wet lentic environments. | Re-naturalization of a rectified canal section replacing the infesting vegetation thus eradicating the riparian vegetation currently consisting almost exclusively of Arundo donax and the subsequent planting of local species Quercus robur L. Alnus glutinosa L. Fraxinus angustifolia subsp. Oxycarpa Ulmus minor Mill. Crataegus monogyna Jacq. Cornus sanguinea L. Euonymus europea L. Prunus spinosa L. Rubus ulmifolius Schott Typha latifolia L. and Phragmites australis. | Construction of two wooden observation towers | Management in coordination with livestock operators | Habitat and biodiversity Hydromorphology Social benefits | |||||||
LIFE REWETLAND - A wide-area programme for improving the quality of surface water in the agro pontino by means of natural purification techniques | 1 January 2010 | Filter ecosystem in the Circeo National Park; Buffer strips along the reclamation canals | Urban park in Marina di Latina | Good practices of water management in a farm; Environmental Restoration Programme (ERP) for the Agro Pontino | Environmental and educational policies | Habitat and biodiversity Land use management - agriculture Water quality | |||||||
LIFE RISORGIVE – Bacino Castellaro | 1 October 2015 | 30 September 2020 | Restoration of hydraulic functionality; Morphological redevelopment: reshaping and re-profiling of the banks; Reopening of the head of the Castellaro spring system | Restoration of the bank vegetation with the planting of native species suitable for the resurgence environment; Thickening hedges; Restoration of natural habitats such as wet temporary and permanent areas. | Creation of didactic panels and signs | Contract of Resurgences (multilevel governance tool) engagement of farmers (agreements of collaboration in the management of the intervention funding by PSR) | Local public awareness | Environmental flows and water resources Habitat and biodiversity Hydromorphology Land use management - agriculture Social benefits Water quality | |||||
LIFE RISORGIVE – Fontane Marzare | 1 October 2015 | 30 September 2020 | Restoration of hydraulic functionality; Morphological redevelopment: reshaping and re-profiling of the banks; Reopening/reactivation of the resurgence; Creation of a small pond for amphibious and other animals | Recovery and arrangement of the bank vegetation with the planting of native species suitable for the resurgence environment; | Creation of didactic panels and signs | Contract of Resurgences (multilevel governance tool); engagement of farmers (agreements of collaboration in the management of the intervention funding by PSR) | Local public awareness | Environmental flows and water resources Habitat and biodiversity Hydromorphology Land use management - agriculture Social benefits Water quality | |||||
LIFE RISORGIVE – Roggia Girosa | 1 October 2015 | 30 September 2020 | Morphological redevelopment: reshaping and re-profiling of the banks; Installation of deflectors constrictors and stones and boulders inside the resurgence | Restoration and arrangement of the bank vegetation with the planting of native species suitable for the resurgence environment; Restoration of natural habitats such as wet temporary and permanent areas | Creation of a path and small wooden brides; Creation of didactic panels and signs | Contract of Resurgences (multilevel governance tool); engagement of farmers (agreements of collaboration in the management of the intervention funding by PSR) | Local public awareness | Environmental flows and water resources Habitat and biodiversity Hydromorphology Land use management - agriculture Social benefits | |||||
LIFE RISORGIVE – Roggia Tergola Sud | 1 October 2015 | 30 September 2020 | Restoration of hydraulic functionality; Morphological redevelopment: reshaping and re-profiling of the banks; Excavation of the isthmus to create an island used for the reproduction of target species | Recovery and arrangement of the bank vegetation with the planting of native species suitable for the resurgence environment; Creation of lowland groves; Restoration of natural habitats such as wet temporary and permanent areas | Creation of didactic panels and signs | Contract of Resurgences (multilevel governance tool); engagement of farmers (agreements of collaboration in the management of the intervention funding by PSR) | Local public awareness | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||
LIFE Saramugo | 1 July 2014 | 31 December 2019 | Minimize the impact of cattle on watercourses Rehabilitation of the aquatic environment and hidromorfologic requalification | Removal of exotic fish species | Implementation of a Nature Custody network for the Saramugo Manual of good practices for the conservation and rehabilitation of the saramugo habitat | Environmental education activities with local schools Environmental awareness and promotion activities Awareness-raising campaign for fishermen and agropecuary producers | Habitat and biodiversity | ||||||
LIFE Segura Riverlink (Through rivers) | 1 August 2013 | 30 July 2017 | Planting of native species Removal of invasive species Structuring of shoreline Weir removal Creation of fish passes | Improving fish migration Alloctone species control | Implementation of best practice land & soil management Management of undesirable plant species Promotion of riparian vegetation and natural re-growth of bankside Removal of invasive species Riparian tree planting | Volunteer engagement Creation of a Land Stewardship Network Community education (talks and workshops | Fisheries Flood risk management Habitat and biodiversity Hydromorphology Monitoring | Invertebrates Macrophytes and/or phytobenthos: Average abundance | Structure & condition of riparian/lake shore zones | Nutrient concentrations Oxygen balance PH Salinity Temperature | Birds Fish Fish passage usage Riparian vegetation | ||
LIFE+ “Sipontine Wetlands” | Riparian habitat restoration Wetland habitat Restoration of riparian marshes | Environmental flows and water resources Habitat and biodiversity Land use management - agriculture Monitoring Water quality | |||||||||||
LIFE08NAT/IT/000352 CRAINat | 1 January 2010 | 31 December 2014 | Habitat restoration creation of pools | release of juviniles | Habitat and biodiversity | ||||||||
LIFE08NAT/IT/000352 CRAINat 2 | Habitat and biodiversity | ||||||||||||
La Gotera dam removal | 1 September 2011 | Dam removal Reconnection of river | capture of fish prior to the works | Environmental flows and water resources Habitat and biodiversity Hydropower Hydromorphology | |||||||||
Land acquisition on the banks of the Ouche River | land acquisition | sensitization of the resident | Environmental flows and water resources Habitat and biodiversity Land use management - agriculture Spatial planning | Fish | |||||||||
Langonnet river | 1 January 2000 | Creation of pools and riffles Creation of groynes introduction of blocks Creation of berms | Develop riparian forest Tree plantation | Habitat and biodiversity Hydromorphology Monitoring Water quality | Fish: Species composition | Channel pattern/planform | Temperature | ||||||
Llobregat river restoration | 1 January 2009 | Revetmens with local species Bank stabilisation | Riparian planting Control of invasive species Silvicultural treatments | Remove obstacles in the riverbed | Environmental flows and water resources Habitat and biodiversity Hydromorphology Social benefits | ||||||||
Lower Aurino master plan | Flood risk management Habitat and biodiversity Hydromorphology | ||||||||||||
Lower Aurino river: Gatzaue riverbed widening | 2003 | creation of new branches | Floodplain reconnection | Creation of new channel Channel widening | Fish habitat restoration | Citizen participation in the restoration project | Flood risk management Habitat and biodiversity Hydromorphology Social benefits Spatial planning | Invertebrates | Channel pattern/planform Connection to groundwaters Structure & condition of riparian/lake shore zones | Riparian vegetation | |||
Lower Aurino river: Molini di Tures riverbed widening | 2002 | 31 December 2013 | Floodplain reconnection | Creation of new channel Removal of rip-rap Channel widening | Citizen participation in the restoration project | Flood risk management Habitat and biodiversity Hydromorphology Monitoring Spatial planning | Invertebrates | Channel pattern/planform Structure & condition of riparian/lake shore zones | |||||
Lower Aurino river: San Giorgio di Brunico riverbed widening | 2008 | 31 January 2008 | Floodplain reconnection | Channel widening New bruch | Citizen participation in the restoration project | Flood risk management Habitat and biodiversity Hydromorphology | |||||||
Lowering the weir of the Houël mill on the Leff River | 1 September 2010 | 30 September 2010 | Weir lowering Spreading of debris | Trimming of trees | Awareness raising by a sign Production of a video Organisation of visits to the sites | Habitat and biodiversity Social benefits | |||||||
Marsh restoration on the Merlue | 1 July 2008 | Restoration of riparian marshes | Channel widening | Habitat and biodiversity | Fish Invertebrates | ||||||||
MediCyn | 1 January 2018 | Grand Clos” site: hydraulic isolation of 3 temporary ponds to delay the date of autumn water fill in | “Relai” site: digging of 9 temporary ponds | Hydraulic calendars controlled by pumping and irrigation network | Users (hunters and farmers) consultation | Habitat and biodiversity | Salinity | Public perceptions dragonflies | |||||
More space for the river Orbigo | Removal/retreat of embankments | Flood risk management Habitat and biodiversity Hydromorphology Social benefits | |||||||||||
Natura 2000conservation in Alta Tuscia Viterbese LIFE04 NAT/IT/000153 | 1 September 2004 | 31 August 2007 | Control of invasive species Extensive planting Restoring riparian vegetation | construction of infrastructure read to prevent the passage on lawns meintenance of the trails network | Realization of press conferences Public meeting distribution of brochures | ||||||||
Oasi naturale delle pittime di Cascina Oschiena | 6 January 2019 | Wetland restoration | Habitat and biodiversity | ||||||||||
Off-Channels Restauration | 1 February 2010 | 15 January 2013 | Habitat and biodiversity Hydromorphology Water quality | ||||||||||
PROGETTO WETLAND - Volturno | 1 August 2003 | Embankment renaturalization Bank reprofiling | Excavation for floodplain creation Floodplain creation Buffer strips | Improved public access | |||||||||
Pagana canal restoration project | 2002 | 1 October 2004 | removal of cement covers diversification | Channel widening | Creation of in-stream wetland | Adoption of new practices for aquatic vegetation management pumping water to an adjacent newly afforested riparian buffer for nitrogen and phosphorous removal | Flood risk management Habitat and biodiversity Land use management - agriculture Spatial planning Water quality | ||||||
Partial removal of a weir on La Corrèze river in the town of Tulle | Bed reprofiling Weir modification | Fisheries Habitat and biodiversity Social benefits | Fish | Flow velocities Quantity & dynamics of flow Substrate conditions | river bank vegetation | ||||||||
Partial removal of weir on the Sanguèze at Mouzillon | 1 January 2004 | Weir lowering | Topographic and landscape restoration | Habitat and biodiversity Hydromorphology Monitoring | Fish: Abundance Invertebrates Macrophytes | Public perceptions | |||||||
Partial removal of weir on the Thouet at Le Tallud | 1 January 2004 | Weir lowering | allowing hydromorphological diversification upstream in the previously impounded stretch | Habitat and biodiversity Hydromorphology Monitoring | Fish: Abundance Invertebrates Macrophytes | Public perceptions | |||||||
Proposal for landscape and environmental improvement of the canal of Sils | 1 March 2008 | Revetmens with local species New bioengineering elements in order to stabilize slope banks | New small bridge made of wood Remove the old small bridge | Environmental flows and water resources Habitat and biodiversity | |||||||||
RESTORATION OF THE GORIŠKI BREŽIČEK STREAM | 1 January 2007 | excavation in the U form coves and bays construction Weir construction | Creation of a flood expansion area | Re-instatement of old course Adding sinuosity | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||
RESTORATION OF THE TRESENEC STREAM | 1 January 2007 | Local deepening | Construction of the overflows between individual meanders | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||
Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île | 1 September 2011 | 1 December 2011 | Removal of lateral dikes Reactivating river margins | Habitat and biodiversity Hydromorphology Monitoring | |||||||||
Reconnection of a secondary arm of the Rhine: the Schafteu | 1 February 2004 | Lowering of dike Removal of obstructions to flow Introducing large woody debris | Flooding of small islands Re-instatement of old course | Land use management - forestry Hydromorphology Flood risk management | Flow velocities Quantity & dynamics of flow | ||||||||
Reconstitution du matelas alluvial de la Vesgre à Houdan | 1 October 2011 | 31 December 2012 | Planting Aggregates added to riverbed | A ford is also built to facilitate the passage of animals and gear. Drinking troughs and fences are placed to limit trampling in the stream | Habitat and biodiversity Hydromorphology Land use management - agriculture Water quality | ||||||||
Recovery "CañoTravieso" | 1 May 2003 | Habitat restoration | Modification or removal of existing defenses Channel naturalisation Improvement of channel morphology | Environmental restoration of the area integral transformed by agriculture | Environmental flows and water resources Monitoring Water quality | ||||||||
Recovery of riparian vegetation affected by fire in Canaletes River and tributaries. Horta de San Joan | New bioengineering elements in order to stabilize slope banks | Restoring riparian vegetation Removal of exotic plants | Maintenance plan for revegetation of burned area | Environmental flows and water resources Habitat and biodiversity Land use management - forestry | |||||||||
Recovery of the functionality of Brazo de la Torre | 1 October 2003 | Revetmens with local species Removal of sediment Partial dredging of the channel to allow tidal flow | Habitat restoration Dam removal | Environmental flows and water resources Monitoring Water quality | Continuity of sediment transport | ||||||||
Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream | 1 October 1999 | Extensive planting Introduction of gravel | Adding sinuosity | Improved public access | Habitat and biodiversity Hydromorphology Monitoring Social benefits Water quality Urban | Fish: Abundance Macrophytes | Channel pattern/planform Quantity & dynamics of flow Width & depth variation | Public awareness of river | |||||
Recreation of a sinuous low-flow channel in the Merloz | 1 September 2008 | Deflectors Bank reprofiling | Adding sinuosity | Habitat and biodiversity Hydromorphology Monitoring Water quality | Fish: Abundance Fish: Species composition | Channel pattern/planform Quantity & dynamics of flow | |||||||
Refilling the meanders of the Colostre | 1 January 1996 | Weir removal | Removal of poplars in old meanders Re-meandering | Agreement with the owners Public meeting | Fish: Species composition Macrophytes & phytobenthos: Taxonomic composition | Presence of beavers | |||||||
Regeneration of the banks of the river Mape | 1 January 2008 | Revetmens with local species | Removal of exotic plants | Custody of territory | Recovering the historical and cultural heritage linked to the river | Environmental flows and water resources Habitat and biodiversity Hydromorphology Social benefits | |||||||
Remeandering of the Drugeon and integrated management of its catchment | adding roughness | Re-meandering Reconnection of cutoff meander | Environmental flows and water resources Habitat and biodiversity Water quality | Fish | Flow velocities Quantity & dynamics of flow | Oxygen balance Temperature | |||||||
Remeandering of the Drésine and of the Remoray stream | Re-meandering Adding sinuosity | Environmental flows and water resources Habitat and biodiversity Hydromorphology | Fish Invertebrates | Connection to groundwaters Quantity & dynamics of flow | Riparian vegetation | ||||||||
Remeandering of the Mardereau stream at Sorigny | Riverbank revegetation Introducing stones | Re-meandering | Engagement with schools Student Education | Flood risk management Habitat and biodiversity Hydromorphology Social benefits Water quality | Invertebrates Phytoplankton | Public opinion | |||||||
Removal and opening of sluice gates on the Vence River | sluice gate removal | Flood risk management Habitat and biodiversity | Fish Invertebrates | Substrate conditions | |||||||||
Removal of Maisons-Rouges dam over the River Vienne | 1 January 1994 | Dam removal | Media | Fisheries Hydropower | Fish: Species composition | Continuity for organisms Continuity for sediment | |||||||
Removal of a dam on the Allier river in Saint-Etienne-du-Vigan | Dam removal | Habitat and biodiversity Hydropower | Fish | Channel pattern/planform Substrate conditions | |||||||||
Removal of a pond weir in a tributary of Petersbach | Weir removal Pond drainage | Fish | |||||||||||
Removal of five Lakes on the Val des Choues stream | Removal of impoundments Removal of derivation of watercourse | Fish: Abundance Invertebrates: Taxonomic composition | Quantity & dynamics of flow | ||||||||||
Removal of the Brosses weir on the Soanan River | 1 September 2010 | 30 September 2010 | Weir removal | Rescue fishing campaign temporary diversion of river | Habitat and biodiversity Hydromorphology Urban | ||||||||
Removal of the Coupeau impoundment on Vicoin River and riverbed restoration | 1 June 2004 | Weir removal Barrier removal Riverbed restoration | Creation of wetland | Creation of new channel | construction of recreational facilities (trails and footbridges) | Habitat and biodiversity Hydromorphology Social benefits | |||||||
Removal of the Cussy weir on the Maria stream | Weir removal | Habitat and biodiversity Hydromorphology | Fish | ||||||||||
Removal of the Fatou dam on the Beaume river | Dam removal Dredging of sediment (mud) Removal of sediment | Habitat and biodiversity Hydropower Hydromorphology Land use management - agriculture | Fish: Abundance Fish: Species composition | ||||||||||
Removal of the Kernansquillec dam over the River Léguer | 1 September 1996 | Dam removal | Removal of impoundments | Rehabilitation of site by local associations Creation of a centre to show visitors the historical heritage Creation of a twelve kms foothpath to visit the area Video made by Eau et Rivières de Bretagne Brochure available in a website | Hydropower | Fish: Species composition | Continuity for organisms | ||||||
Removal of the Retuerta dam in the Aravalle river: | Dam removal | Habitat and biodiversity Hydropower Hydromorphology | |||||||||||
Removal of the Stalapos weir over the river Alagnon | Bank improvement Weir removal Bed reprofiling Riverbank revegetation | Fisheries Habitat and biodiversity Hydromorphology | Fish | ||||||||||
Removal of the Ver mill weir on the Sienne River | 1 October 2010 | 31 October 2010 | Weir removal Creation of groynes | Maintenance of riparian vegetation Restoration of pond | Environmental flows and water resources Habitat and biodiversity Hydropower Hydromorphology Social benefits | ||||||||
Removal of the pont Paillard weir on a secondary arm of the Aume | 1 June 2008 | Planting Weir removal | Flood risk management Hydromorphology Monitoring | Fish: Abundance Fish: Species composition | |||||||||
Removal of twenty small structures and diversification of the Main Channel of the River Couasnon | Removal of 22 flaps Introducing sediment | Creation of a flood expansion area | Prohibition of pumping of water | Fish: Species composition Invertebrates: Abundance Invertebrates: Taxonomic composition | Channel pattern/planform Quantity & dynamics of flow | ||||||||
Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville | 1 January 2014 | 31 December 2014 | Dam removal Dredging of channel Removal of island Riverbed dug out | Replanting of banks removal of bunds Reinforcing of banks | extension of water treatment outlet | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology Water quality | |||||||
Reméandrage de la Veyre en amont du lac d’Aydat | 1 September 2010 | 30 April 2011 | Construction of weak and identical slopes on straight sections Construction of steep slopes to promote erosion and natural deposits in meandering sections Restoring riparian vegetation Creation of pools | Creation of meanders | Fences troughs and pontoons are placed. | An electric rescue fishing is carried out Before the works The stream is temporarily diverted to a reach at proximity in order to work "out of water" and cross the old meanders with the current course a selective management of riparian forest and the removal of fences are necessary to facilitate access to the machines | Flood risk management Habitat and biodiversity Hydromorphology Land use management - agriculture Water quality | ||||||
Renaturation of Stržen's riverbed on intermittent Cerknica Lake | 1 September 2017 | 31 December 2023 | Riverbed restoration | Establishing of quiet zones | Re-instatement of old course – double meander | Mowing management Quiet zone establishment (fishing is forbiden plan for quiet zone management visiting discouraged) | Education of youth – admission-free field trips ornithological camps creative competitions; Active communication with key stakeholders – landowners hunters fishermen and tourism providers; Education of tourism providers. | Environmental flows and water resources Habitat and biodiversity Hydromorphology Social benefits | Invertebrates Invertebrates: Abundance Invertebrates: Diversity Invertebrates: Taxonomic composition Macrophytes Macrophytes and/or phytobenthos: Average abundance Macrophytes and/or phytobenthos: Taxonomic composition | Channel pattern/planform Flow velocities Quantity & dynamics of flow Width & depth variation | Oxygen balance PH Temperature | Habitat mapping | |
Reopening of a section of the River Bièvre in an urban environment | Deculverting | Planting | Re-meandering | Creation of a park Elimination of wastewater connections | Management of vegetation | Flood risk management Habitat and biodiversity Hydromorphology Social benefits Urban | Fish: Species composition Invertebrates: Taxonomic composition Macrophytes & phytobenthos: Taxonomic composition | Presentation of project at World Water Forum of Kyoto 2003 | |||||
Reopening of the culverted Redon river | 1 September 2006 | 1 January 2007 | Reopening of culverted river Bank stabilisation Planting | Meandering channel | Environmental flows and water resources Habitat and biodiversity | ||||||||
Reopening side channels along the Saône in Jassans-Riottier | 1 September 2007 | 1 April 2008 | Restoration of the connection of side arms reconnection of ponds installation of bio-engeneering bank protection instalation of a sluice Planting Helophytes planted | Environmental flows and water resources Flood risk management Habitat and biodiversity Social benefits | |||||||||
Restauration du matelas alluvial de la Clouère par recharge granulométrique | 1 June 2008 | 31 August 2008 | excavation and embankment Two microstrings and a ribbed side ramp are made to ensure the passability of the upstream structure Big rocks are placed in the stream Aggregates added to riverbed | An electric rescue fishing is carried out just before the work | Environmental flows and water resources Habitat and biodiversity Hydromorphology | ||||||||
Restauration du matelas alluvial du ruisseau de Trémeret à Ambon | 1 September 2011 | 31 October 2011 | highten the bottom of the stream to reconnect alluvial wetlands Aggregates added to riverbed | Bending and extension of the drains so that the rejection is further downstream Replacement of nozzles of greater diameter and calibration of them to ensure continuity of the slope and reloaded in coarse aggregates | |||||||||
Restoration and environmental interpretation of the Riparian Forest of Nestos Delta | Riparian planting | Habitat and biodiversity Land use management - forestry Monitoring Social benefits | |||||||||||
Restoration in river Tajo and tributaries after kaolin spillage | Installation of bioengineering elements Creation of fish passes | Removal of sediments from the mines Vegetation management | New paths near the river Information panels for people | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology Water quality | |||||||||
Restoration in the lower reach of the Cinca River | Displacement of flood defenses Elimination of secondary speck to increase the floodplain Restoring riparian vegetation | Flood risk management Habitat and biodiversity Land use management - forestry | |||||||||||
Restoration of R. Odelouca | 1 January 2011 | 31 December 2014 | rehabilitate highly eroded and degraded river banks Construction of a crib wall and placement of stone filled gabions to stabilise river banks collected from cuttings and seeds in the area and grown on in local nurseries Construction of artificial islands in the river channel to augment habitat heterogeneity Removal of invasive plants Installation of geotextile Resectioning Planting of native species | Environmental flows and water resources Fisheries Hydromorphology Monitoring | |||||||||
Restoration of R. Odelouca 2 | Bank stabilisation | Riparian habitat restoration Control of invasive species | Environmental flows and water resources Fisheries Hydromorphology Monitoring | ||||||||||
Restoration of Viejas River from the outlet of the fish farm to its mouth | 1 January 2008 | Dam removal | Revegetation | Environmental flows and water resources Flood risk management Hydropower Hydromorphology | |||||||||
Restoration of a section of Torrente de Can Sunyer passing through Martorelles | 1 January 2008 | New bioengineering elements in order to stabilize slope banks | Removal of exotic plants Restoring riparian vegetation | Habitat and biodiversity Land use management - forestry Social benefits | |||||||||
Restoration of a stream of the Jarama River, Valdetorres de Jarama | 1 January 2000 | Lowering of lateral slopes | Riparian planting | ||||||||||
Restoration of a stretch of the river of Santa Coloma | 1 April 2010 | New bioengineering elements in order to stabilize slope banks | Removal of exotic plants Restoring riparian vegetation | Habitat and biodiversity Hydromorphology | |||||||||
Restoration of riparian zone in Aragon River | 1 August 2005 | New bioengineering elements in order to stabilize slope banks | Habitat creation Restoring riparian vegetation | Improve forest management and agricultural | Habitat and biodiversity Land use management - agriculture Social benefits | Channel pattern/planform Structure & condition of riparian zones | High quality habitat for European mink (Mustela lutreola) | ||||||
Restoration of side channels of the Loire and its tributaries | 1 January 1995 | 1 January 2005 | treating riverside vegetation Weir modification | Flood risk management Habitat and biodiversity Hydromorphology | |||||||||
Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes | 1 January 2005 | Restoration of natural vegetation | Topographic and landscape restoration Decrease sedimentation | Restoring the natural hydrological regime | Environmental flows and water resources Habitat and biodiversity Monitoring Water quality | ||||||||
Restoration of the Bellegarde hydraulic annex and sediment recharge of the Ain River | Environmental flows and water resources Habitat and biodiversity Hydromorphology | Fish | Connection to groundwaters | Riparian vegetation | |||||||||
Restoration of the Cassaire wetland (Rhôle delta) | 1 January 2010 | Installing typical temporary marshes and grassland vegetations of Mediterranean wetlands. | Installation of a pumping station powered by a wind turbine. | Hydraulic management and grazing; Horse grazing from February to August helps to maintain vegetations open; Monitoring | Habitat and biodiversity Social benefits | ||||||||
Restoration of the Charentonne in the Serquigny public garden | 1 January 2001 | Coir rolls Bank reprofiling | Riparian planting Protect/restore riparian zone | Re-meandering | Habitat and biodiversity Monitoring Social benefits Spatial planning | Invertebrates: Taxonomic composition | |||||||
Restoration of the Pantanello wetland area (Fondazione Caetani) | Morphological remodeling Realization of the new hydraulic structure of the area | Complete conversion to a natural layout of the riparian strip of the Ninfa River; completion of the planting of plants Creation of structures to attract wildlife | Creation of facilities for the visit and educational use of the area restoration of Podere Pantanello restoration of the Podere Ninfa II | Economic aspects Environmental flows and water resources Habitat and biodiversity Social benefits | |||||||||
Restoration of the longitudinal continuity along the Canche and its classified tributaries | 1 January 2006 | Removal of obstructions to flow | Creation of fish passes | Habitat and biodiversity Monitoring Water quality | Fish: Abundance Fish: Disturbance-sensitive species Fish: Species composition | ||||||||
Restoration of the marsh "Gallega" | 1 January 2005 | Improvement of channel morphology Habitat restoration | Permeabilize the side wall of the FAO | Environmental flows and water resources Habitat and biodiversity Hydromorphology Monitoring | |||||||||
Restoration of the original riverbed of the Steinbaechlein | Restoring riparian vegetation | Creation of wetland | Re-instatement of old course | Economic aspects Water quality Urban | Fish | ||||||||
Restoration of the previous riverbed of the Dadon | 1 May 2004 | Implementation of rip rap Habitat diversification Implementation of vegetated boxes Depth variation Riverbed restoration | Creation of meanders Adding sinuosity | Habitat and biodiversity Hydromorphology Monitoring Water quality | Fish: Abundance Fish: Species composition | Channel pattern/planform Width & depth variation | |||||||
Restoration of the river area of the section of Betzuca stream | 1 November 2007 | Landscape integration of the breakwater New bioengineering elements in order to stabilize slope banks | Creation of pond | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology | |||||||||
Restoration of the river continuity on the Touques Basin | removal of sluices removal of dams Creation of fish passes Weir removal Weir lowering | Flood risk management Habitat and biodiversity Hydromorphology | |||||||||||
Restoration of the stream of Vallicrosa in the section of the source of Pic | 1 June 2009 | New bioengineering elements in order to stabilize slope banks Removal of concrete banks and bed Revetments with local species | Restoring riparian vegetation | Environmental flows and water resources Habitat and biodiversity Urban | |||||||||
Restoration of the stream of the Partido | 1 January 1998 | Elimination of the pipeline on the left bank Removal of sediment Revetmens with local species | Habitat restoration | Improvement of channel morphology | Comprehensive environmental restoration of a large area in contact with the National Park | Flood risk management Habitat and biodiversity Water quality | |||||||
Restoration of the surface flows of two temporary tributaries of the upstream Clauge | 1 January 2005 | Re-meandering Re-meandering of tributaries | Fish: Species composition Invertebrates: Taxonomic composition | Connection to groundwaters | |||||||||
Restoration project in Serpis River in the tt.mm. Lorcha (Alicante province) and Villalonga (Valencia province) | Revetments with local species Weir removal Removal of invasive plants Creation of fish ladders | Removal of invasive plants | Re-instatement of old course | Information panels for people New paths near the river | Environmental flows and water resources Fisheries Habitat and biodiversity Social benefits | ||||||||
Restoration project in Turia River | 1 March 2015 | Revetmens with local species Weir removal | Removal of exotic plants Elimination of structural elements concreted | Improved public access | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology Social benefits | ||||||||
Restoration project in Verde River | 1 January 2008 | Recess side slopes Barrier removal | Removal of exotic plants Elimination of structural elements concreted | Removal of speckles | Improve forest management and agricultural | Environmental flows and water resources Fisheries Habitat and biodiversity Hydromorphology Social benefits | |||||||
Restoration project in the stream of the Vall d'Horta and surrounds. Natural Park of Sant Llorenç del Munt i l'Obac. | New bioengineering elements in order to stabilize slope banks Creation of fish ladders | Removal of exotic plants Tree management | Environmental flows and water resources Habitat and biodiversity Land use management - forestry | ||||||||||
Restoration project of riparian buffer of the Sesia river | Control of invasive species; planting riparian vegetation | Flood risk management Habitat and biodiversity Water quality | |||||||||||
Restoration project of the degraded area of the Molí source environment and improvement of river areas and adjacent riparian formations | 1 January 2008 | New bioengineering elements in order to stabilize slope banks Bank stabilisation Bank protection | Restoring riparian vegetation | Habitat and biodiversity Hydromorphology | |||||||||
Restoration project of the river area of the streams of Vallmanya and Reixac | 1 December 2008 | New bioengineering elements in order to stabilize slope banks Revetmens with local species | Removal of exotic plants Restoring riparian vegetation | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||||
Restoring the River Doquette to its original bed | Introducing sediment | Re-instatement of old course Adding sinuosity | Promoting riparian vegetation | ||||||||||
Restoring the natural dynamics of the upper Adour | 1 January 1997 | 1 January 2004 | Restoration of side channels Removal of bunds by regrading the banks Creation of secondary channels Bank protection Planting | Change in debris and dead wood management to minimum intervention Countering the development of Japanese knotweed | Flood risk management Habitat and biodiversity Hydromorphology | ||||||||
Restoring the river continuity of the Bresle River by returning it to its original bed in Sénarpont | 1 November 2013 | 1 May 2015 | New riverbed along old channel | Putting up fences and drinking points for livestock | Adjusting discharges and creating a monophogenetic discharge Management regarding letting the river draw a natural river bed | Environmental flows and water resources Habitat and biodiversity Hydromorphology | |||||||
Retour dans son talweg d’origine de la Souffel à Reichstett et création de mares | 1 December 2010 | 31 March 2011 | The old arm is preserved and a rockfill merlon is set up at the junction of the two beds for divert the waters to the new route Creation of ponds Riverbed restoration | Creation of meanders | The banks are not not stabilized in order to let the stream create its preferential flow channel and facilitate overflows in the meadow with each rising water | Flood risk management Habitat and biodiversity Hydromorphology Social benefits Urban | |||||||
Returning the Fontenelle to its original bed at Saint-Wandrille-Rançon | 1 August 2010 | 1 June 2011 | Banks were sloped Returning of water to the river Tree planting Planting Weir removal Riverbed restoration Helophytes planted | Bridges built Fences and animal feeders were installed | Fish were caught before the work began | Flood risk management Habitat and biodiversity Hydromorphology | |||||||
Rio Mareta restoration at Stanghe (Sterzing-Vipiteno) | Dam removal | Channel widening | Flood risk management Habitat and biodiversity Hydromorphology | Fish Invertebrates | Channel pattern/planform Continuity of sediment transport Width & depth variation | Amphibians Birds dragonflies river bank vegetation | |||||||
Rio San Martino and Piovega di Scandolara restoration project | 2005 | Floodplain reconnection Floodplain creation Buffer strips | Channel naturalisation Channel widening Meandering channel | Creation of in-stream and out-stream wetland | Adoption of new practices for aquatic vegetation management | Involvement of farmers in buffer strips plantation | Flood risk management Habitat and biodiversity Land use management - agriculture Land use management - forestry Monitoring Water quality | Nutrient concentrations | |||||
Rio Sant'Ambrogio restoration project | 2005 | 1 March 2009 | Floodplain reconnection Floodplain creation Buffer strips | Channel naturalisation Channel widening Meandering channel | Creation of in-stream wetland | Adoption of new practices for aquatic vegetation management | Involvement of farmers in buffer strips plantation | Flood risk management Habitat and biodiversity Land use management - agriculture Land use management - forestry Water quality | |||||
Rio Tepice urban restoration | 1 March 1993 | 1 December 1997 | Bank improvement | Riparian planting | Management of paths | Public green area | Habitat and biodiversity Social benefits Spatial planning Urban | Structure & condition of riparian zones | Ex ante status "Il Rio Tepice nel suo Viaggio verso il Po" Ass. Il tuo Parco | ||||
Riparia-Ter - Recovery of riparian habitats of the Ter River | 1 January 2010 | Revetmens with local species Control of invasive species | Improve forest management and agricultural | Environmental flows and water resources Habitat and biodiversity | |||||||||
River Tesina restoration | Habitat and biodiversity Hydromorphology Social benefits | ||||||||||||
River restoration in the irrigation area Lobón (Badajoz) | 1 January 2008 | Revetmens with local species | Removal of sediments Silvicultural treatments | Legal advice Monitoring strategy | Information panels for people | Habitat and biodiversity Hydromorphology Monitoring Social benefits | |||||||
River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga | 1 November 2009 | New bioengineering elements in order to stabilize slope banks Removal of rip-rap | Removal of exotic plants | Habitat and biodiversity Water quality | |||||||||
River restoration project in Sella, Asturias | 1 January 2009 | Revetmens with local species New bioengineering elements in order to stabilize slope banks Removal of rip-rap | Removal of sediments Removal of exotic plants | Remove obstacles in the riverbed | Promotion and management of tourism in the river | Citizen participation in the restoration project | Environmental flows and water resources Habitat and biodiversity Hydromorphology Social benefits | ||||||
River restoration project of the stream of Vallvidrera | 1 August 2010 | New bioengineering elements in order to stabilize slope banks | Removal of exotic plants Restoring riparian vegetation | Environmental flows and water resources Flood risk management Habitat and biodiversity Hydromorphology | |||||||||
Robledo de Chavela dam removal | 29 September 2014 | 29 September 2014 | Dam removal extraction and relocation of sediments Delimitation of the channel with riprap slope profiling Reforestation of the riverbank | Capture and transfer of fish | Social benefits Water quality Urban | ||||||||
Route water: environmental restoration project for tourist use | 1 January 2010 | Removal of exotic plants Restoring riparian vegetation | Morphology of the bed altered | Recovery of the old mill | Habitat and biodiversity Social benefits | ||||||||
Réduction de l’impact de trois étangs sur cours d’eau dans le bassin du Cousin | 1 January 2006 | 31 December 2008 | Construction of a bypass channel Installation of metal sheet piles Structures were improved for fish continuity | Plots adjacent to streams are managed extensively. Farmers have contracted agri-environmental measures prohibiting the amendments. | Habitat and biodiversity Hydromorphology Land use management - agriculture Social benefits | ||||||||
Rétablissement de la continuité écologique sur la Luire | 1 March 2010 | 30 June 2010 | Removal of hydrological structures Draining of the brooks Reconstitution of the alluvial mattress Scattering of blocks Creation of three fording and two water troughs Riparian planting | Meanders are conserved favouring sinousity | 600 m of electric fences Laying of 2 | Occasionally adjustments are made to keep a flooding of the wet micro-wetlands which had developed upstream of the works; | Habitat and biodiversity Hydromorphology Land use management - agriculture Water quality | ||||||
Río Sequillo tramo Belver de los Montes | |||||||||||||
SCI Parga-Ladra-Támoga: recovery of bog woodland and dystrophic lake | 1 April 2001 | Removal of revetments Depth variation Revetmens with local species | Awareness raising | Invertebrates: Taxonomic composition | Structure & condition of riparian zones | ||||||||
SEE River Project | 1 September 2012 | 1 October 2014 | harmonise development and conservation | Flood risk management Hydropower Land use management - agriculture Land use management - forestry Social benefits Spatial planning Urban | |||||||||
Salzano wetland and Marzenego river restoration project | 2007 | 1 October 2009 | Reshaping the net of canals Ponds and pools inside the wetland | Hydraulic connection between the river and an outflow wetland | re-establish rare and endangered aquatic vegetation types | Improved public access Recreation Community Education | Flood risk management Habitat and biodiversity Land use management - forestry Monitoring Social benefits Water quality | Nutrient concentrations | |||||
San Giovanni stream restoration upstream San Matteo della Decima | Sediment trap building | Vegetation management Removal of sediments from sediment trap | Consultation | ||||||||||
Scolo Desolino restoration project | 2005 | 1 January 2009 | Floodplain reconnection Floodplain creation Buffer strips | Channel naturalisation Channel widening Meandering channel | Creation of in-stream and out-stream wetland | Adoption of new practices for aquatic vegetation management | Involvement of farmers in buffer strips plantation | Flood risk management Habitat and biodiversity Land use management - agriculture Land use management - forestry Monitoring Water quality | |||||
Segura's River Bioremediation | Environmental flows and water resources Hydromorphology Social benefits | ||||||||||||
Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) | 1 September 2014 | 31 August 2019 | Planting of native species Removal of invasive plants Restoring riparian vegetation Structuring of shoreline | Alloctone species control Vegetation management | Implementation of best practice land & soil management Management of undesirable plant species Promotion of riparian vegetation and natural re-growth of bankside Removal of invasive species Riparian tree planting | Volunteer engagement Creation of a Land Stewardship Network Community education (talks and workshops) | Habitat and biodiversity Hydromorphology Land use management - agriculture Monitoring | Invertebrates | Structure & condition of riparian/lake shore zones | Bat Survey Birds Connectivity [Lateral & Vertical] Habitat mapping Macroinvertebrates (IBMWP) Mammel survey Terrestrial mollusks Water Quality (Conductivity, Total suspended solids (TSS), Nitrates) | |||
Suppression de l’étang de Condé-sur-Iton et restauration de zones humides | 1 May 2014 | 31 March 2015 | Removal of woody vegetation Creation of wetlands Removal of structures Filling of pits Tightening of the bed Implementation of blocks Creation of fish pass Bank protection Planting Installation of geotextile | Creation of meanders | Creation of weir for fishing activity | Flood risk management Habitat and biodiversity Social benefits | |||||||
Sustainable management, at local level, of the alluvial aquifer of the River Tordera, through the reuse of waste water | 1 July 2001 | Creation of an infiltration lagoon Habitat creation | Community consultation | Environmental flows and water resources Social benefits Water quality | |||||||||
TerraSeixe | 4 December 2017 | 28 February 2019 | definition and implementation of good management practices that ensure the conservation of biodiversity and the restoration of ecosystems in the context of emerging global change | Set up a support center for environmental education ecotourism research and scientific tourism at international level contributing to rural development and the promotion of the local economy | Economic aspects Habitat and biodiversity Land use management - forestry | ||||||||
The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation | 1 January 2008 | Bank stabilisation Dam removal | Riparian planting | Environmental flows and water resources Habitat and biodiversity Hydromorphology | Channel pattern/planform Structure & condition of riparian zones | ||||||||
The San Marcos weir removal | 1 July 2013 | 1 October 2013 | Creation of fish pass Partial weir removal | Materials removed from the weir were used to fill the pool produced downstream the weir diminishing the erosion of the river bed | Environmental flows and water resources Flood risk management Hydropower Urban | ||||||||
The Verdier marshes | A move from water management for fish farming to a more natural management respecting the Mediterranean seasonal calendar. | Community based management | Habitat and biodiversity Social benefits | ||||||||||
Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572 | 1 January 2003 | 31 December 2006 | Morphological diversification | Control of invasive species Riparian planting | Limitation of access to the river; conservation of mobility area | Birds | |||||||
Transboundary Management Programme for the planned 5-country Biosphere Reserve “Mura-Drava-Danube” - COOP MDD | 1 January 2017 | 30 June 2019 | Habitat and biodiversity Hydromorphology Land use management - agriculture Land use management - forestry Monitoring Spatial planning | ||||||||||
Updated project for the “Environmental Restoration and Urban and Landscape Planning of Cabra River’s High Section (Cordoba) | 19 December 2018 | hydrological recovery actions (stabilization of slopes and recovery of margins witch present erosion problems). | planting of autochthonous vegetation (elms poplars ashes willows tarajes figs ...) along the most degraded banks; silvicultural treatments of riverside vegetation and plantations; cleaning and removal of waste; improve the longitudinal and transverse continuity of the river extending the width of the banks and creating a fluvial corridor | and also recreational areas integrated into the river area improving the population education and connection with their environmental heritage) promenades and footbridges recreational use (construction of footpaths | Social benefits Spatial planning | ||||||||
VALAGUA (Valorização ambiental e gestão integrada da água e dos habitats no Baixo Guadiana transfronteiriço) | 1 January 2015 | 30 September 2019 | Implementation of functional and demonstrative actions for ecological restoration of riverine and riverine habitats | Development of integrated proposals for transboundary water and biodiversity management and their dissemination to policy makers managers and other stakeholders. | awarenes raising in specific target groups to promote sustainable solutions; Production of knowledge on water quantity and quality water use to safeguard habitats and resolution of associated use conflicts | Economic aspects Environmental flows and water resources Habitat and biodiversity Water quality | |||||||
Vallacuera Ravine. Removal of a dyke | 1 September 2006 | New bioengineering elements in order to stabilize slope banks | Removal of exotic plants Conditioning access to properties and pedestrian paths Habitat creation | Removal of a dyke | Reduce the risk of flooding downstream | Fisheries Flood risk management Habitat and biodiversity Land use management - agriculture | Channel pattern/planform Width & depth variation | Flood defense | |||||
Valtellina 2005 – New green system | 1 June 2006 | reforestation Reduction of bank slope | Excavation for floodplain creation Requalification and improvement of forestal cover along corridor Alloctone species control | Monitoring strategy | |||||||||
Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 | 1 September 2009 | Providing of continuity Creation of fish spawn nursing places Restoration of the connection of side arms Creation of fish refuge areas | Planting Removal of exotic plants | Recreation Tourism | Flood risk management Habitat and biodiversity | Fish: Species composition Invertebrates | Channel pattern/planform Continuity for organisms | ||||||
Weir demolition in river Nansa, Cantabria | 1 January 2010 | Weir removal | Environmental flows and water resources Fisheries Habitat and biodiversity | ||||||||||
Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur | 1 November 2013 | 1 June 2014 | Seeding of willows and helophytes Creation of wetlands Creation of parallel streams Creation of fish pass Bank stabilisation Bed load addition | Channel widening | Clearing of alluvial terraces Maintaining burying and raising of weir maintaining of islands | Environmental flows and water resources Flood risk management Hydromorphology Social benefits | |||||||
Works of improvement in final stretch of the Riera of Vallcorba, Sant Quirze del Vallès | 1 June 2009 | New bioengineering elements in order to stabilize slope banks Removal of concrete banks and bed Bank reprofiling Gabion bed | Environmental flows and water resources Habitat and biodiversity Water quality | ||||||||||
Zero river restoration project | 1999 | 1 January 2004 | Floodplain reconnection Floodplain creation Buffer strips | Channel widening | Creation of in-stream and out-stream wetland | Adoption of new practices for aquatic vegetation management pumping water to an adjacent newly afforested riparian buffer for nitrogen and phosphorous removal | Involvement of farmers in buffer strips plantation Student Education | Flood risk management Habitat and biodiversity Land use management - agriculture Land use management - forestry Monitoring Social benefits Water quality | Fish | Nutrient concentrations | |||
Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz. | 1 January 2011 | DPH recovery by removal of fences and barriers that restrict access to the river | |||||||||||
Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz. | 1 January 2011 | Creation of wetland | Recovering natural landscapes | DPH recovery by removal of fences and barriers that restrict access to the river | |||||||||
Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz. | 1 January 2011 | DPH recovery by removal of fences and barriers that restrict access to the river | |||||||||||
Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz. | 1 January 2011 | Creation of wetland | Recovering natural landscapes |