Case study:HPP Blanca: Difference between revisions
Jump to navigation
Jump to search
(XML import) |
No edit summary |
||
Line 316: | Line 316: | ||
{{Additional_links_and_references_header}} | {{Additional_links_and_references_header}} | ||
{{Additional_links_and_references_footer}} | {{Additional_links_and_references_footer}} | ||
{{ | {{Supplementary Information | ||
|Information= | |Information=REFERENCES: | ||
Zabric D. 2011. Prehodi za ribe pri HE Blanca – primer dobre prakse. Življenje vodi, str. 19–22. Availabe at: http://www.he-ss.si/pdf/he_blanca-primer_dobre_prakse.pdf | |||
HESS d. o. o. Brežice. 2010. Prehod za vodne organizme na HE Blanca. Availabe at: http://www.he-ss.si/pdf/kratek-opis.pdf | |||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} |
Revision as of 11:34, 30 May 2013
This case study is pending approval by a RiverWiki administrator.
Location: 45° 59' 28.50" N, 15° 22' 52.50" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Slovenia |
Main contact forename | |
Main contact surname | |
Main contact user ID | |
Contact organisation | HESS d.o.o. |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Danube River Basin District |
---|---|
River basin | Danube |
Subcatchment
River name | Sava River |
---|---|
Area category | 100 - 1000 km² |
Area (km2) | |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | 270270 m <br />0.27 km <br />27,000 cm <br /> |
Dominant geology | |
Ecoregion | Dinaric Western Balkan |
Dominant land cover | Wetland |
Waterbody ID |
Other case studies in this subcatchment: LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica
Site
Name | River Sava near settlement Blanca |
---|---|
WFD water body codes | |
WFD (national) typology | SI1VT739_VT Sava Boštanj – Krško |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Artificially regulated |
Dominant substrate | Gravel, Cobble |
River corridor land use | Extensive agriculture, Woodland |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2009/01/01 |
Works started | 2009/01/01 |
Works completed | 2009/08/01 |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | Fisheries Research Institute of Slovenia | ||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring | Fisheries Research Institute of Slovenia |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | new river-bed near old channel |
Floodplain / River corridor | |
Planform / Channel pattern | creation of fish pass |
Other | |
Non-structural measures
| |
Management interventions | monitoring of fish in the fish pass |
Social measures (incl. engagement) | improved cooperation between energy producers and ecologists |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Flow velocities | Yes |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish: Species composition | Yes | |||||
Fish: Abundance | Yes | |||||
Fish: Disturbance-sensitive species | Yes | |||||
Fish: Age structure | Yes |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information
REFERENCES:
Zabric D. 2011. Prehodi za ribe pri HE Blanca – primer dobre prakse. Življenje vodi, str. 19–22. Availabe at: http://www.he-ss.si/pdf/he_blanca-primer_dobre_prakse.pdf
HESS d. o. o. Brežice. 2010. Prehod za vodne organizme na HE Blanca. Availabe at: http://www.he-ss.si/pdf/kratek-opis.pdf