Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage.: Difference between revisions
No edit summary |
No edit summary |
||
Line 192: | Line 192: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{ | {{Image gallery}} | ||
{{Case study image | |||
|File name=010 Rio Pisuerga Aguilar de Campoo CHDUERO 002.jpg | |||
|Caption=Map of the actuation area | |||
}} | |||
{{Case study image | |||
|File name=010 Rio Pisuerga Aguilar de Campoo CHDUERO 002 I.jpg | |||
|Caption=Aerial view of Pisuerga River | |||
}} | |||
{{Case study image | |||
|File name=010 Rio Pisuerga Aguilar de Campoo CHDUERO 002 II.jpg | |||
|Caption=Pisuerga River channel | |||
}} | |||
{{Case study image | |||
|File name=010 Rio Pisuerga Aguilar de Campoo CHDUERO 002 III.jpg | |||
|Caption=Weir in Pisuerga River | |||
}} | |||
{{Case study image | |||
|File name=010 Rio Pisuerga Aguilar de Campoo CHDUERO 002 IV.jpg | |||
|Caption=Aguilar de Campoo dam | |||
}} | |||
{{Image_gallery_end}} | {{Image_gallery_end}} | ||
{{Additional Documents}} | {{Additional Documents}} |
Revision as of 11:31, 2 January 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | Ignacio |
Main contact surname | Rodríquez |
Main contact user ID | |
Contact organisation | Confederación Hidrográfica del Duero |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Pisuerga River has a high regulation of the flow regime, which determines an artificial and seasoned flow regime. Also, the massive release of sediments is affected by the presence of weirs, which difficult and blocks the mobility for fish upstream migration and habitat availability.
This is the first stage of the total project which involves mitigation and preventive measures. The global objectives are: Improve aquatic habitats and recover aquatic communities; improve longitudinal connectivity; stream bank stabilization; improve the structure and composition of the vegetation. The measures comprise earthworks for bank stabilization (to reduce erosion and sediment input, and facilitate the establishment of vegetation), the installation of fish pass and the rehabilitation of spawning areas.
The project has a total budget of 3.135.508 € and is financed by the Ministry of Environment, as part of the National Strategy for River Restoration.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | C.H.Duero |
---|---|
River basin | Pisuerga |
Subcatchment
River name | Pisuerga |
---|---|
Area category | more than 10000 km² |
Area (km2) | |
Maximum altitude category | 500 - 1000 m |
Maximum altitude (m) | |
Dominant geology | Calcareous |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | Extensive agriculture |
Waterbody ID |
Site
Name | Las Loras |
---|---|
WFD water body codes | 12362 |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Sinuous |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | true |
National/international site designation | |
Local/regional site designations | Site of Community Importance |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Artificially regulated |
Dominant substrate | |
River corridor land use | Extensive agriculture |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2009/01/01 |
Works started | |
Works completed | 2009/11/01 |
Project completed | |
Total cost category | 1000 - 5000 k€ |
Total cost (k€) | 3135 k€3,135,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Water Programe, MARM |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | Confederación Hidrográfica del Duero | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Improve the structure and composition of the vegetation, Streambank stabilisation |
Floodplain / River corridor | Improve longitudinal connectivity |
Planform / Channel pattern | |
Other | Improve aquatic habitats and recover aquatic communities |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | Improved network of trails, Information panels for people |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|