Case study:Isar-Plan: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 58: Line 58:
|Funding sources=City of Munich,Free state of Bavaria
|Funding sources=City of Munich,Free state of Bavaria
|Investigation and design cost category=more than 10000 k€
|Investigation and design cost category=more than 10000 k€
|Invst and design cost=35000
|Investigation and design Lead organisation=State Office for Water Management Munich
|Investigation and design Lead organisation=State Office for Water Management Munich
|Investigation and design Other contact forename=Matthias
|Investigation and design Other contact forename=Matthias

Revision as of 12:03, 14 December 2012

4.00
(2 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 48° 7' 40.09" N, 11° 34' 41.73" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm
Themes Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality
Country Germany
Main contact forename Nick
Main contact surname Elbourne
Main contact user ID User:NickRRC
Contact organisation State Office for Water Management Munich
Contact organisation web site http://www.wwa-m.bayern.de/index.htm
Partner organisations City of Munich
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Straightened Isar (left) and restored diversified channel (Right)

Project summary

Edit project overview to modify the project summary.


The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were: 1) Flood protection 2) Enhancing Species diversity and ecological restoration 3) Improving leisure and recreation

The project is being currently monitored.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district Danube
River basin Isar

Subcatchment

River name Isar
Area category 1000 - 10000 km²
Area (km2) 90009,000 km² <br />900,000 ha <br />
Maximum altitude category 1000 - 2000 m
Maximum altitude (m)
Dominant geology Siliceous
Ecoregion Central Highlands
Dominant land cover Alluvial Forest Vegetation
Waterbody ID



Site

Edit site
Name Munich
WFD water body codes DE16_147237_173317
WFD (national) typology Type 4 "gravel and stone embossed flow of the Alpine foothills"
WFD water body name
Pre-project morphology Straight, Revetments, Embanked, Impounded
Reference morphology Braided, High width:depth
Desired post project morphology
Heavily modified water body No
National/international site designation Germany - Landschaftschutzgebiet
Local/regional site designations Hochwasserwiesen
Protected species present Yes
Invasive species present Yes
Species of interest European green toad (Bufo viridis), little ringed plover (Charadrius dubius)
Dominant hydrology Quick and varying run-off
Dominant substrate Gravel- largely limestone
River corridor land use Urban & Forest
Average bankfull channel width category 10 - 50 m
Average bankfull channel width (m)
Average bankfull channel depth category 0.5 - 2 m
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m) 8000 m8 km <br />800,000 cm <br />
Project started 1998/01/01
Works started
Works completed 2011/08/31
Project completed
Total cost category more than 10000 k€
Total cost (k€) 35 M€"M€" is not declared as a valid unit of measurement for this property.
Benefit to cost ratio
Funding sources City of Munich, Free state of Bavaria

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design more than 10000 k€ 3500035,000 k€ <br />35,000,000 € <br /> State Office for Water Management Munich Matthias Junge
Stakeholder engagement and communication more than 10000 k€ City of Munich Peter Schaller
Works and works supervision more than 10000 k€ State Office for Water Management Munich Stefan Kirner
Post-project management and maintenance more than 10000 k€ State Office for Water Management
Monitoring more than 10000 k€ State Office for Water Management



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure Riparian development
Hydromorphology Structure & condition of riparian zones, Continuity of sediment transport
Biology
Physico-chemical
Other reasons for the project Landscape enhancement, Recreation


Measures

Edit Measures
Structural measures
Bank/bed modifications Gravel banks introduced, Re-grading of banks, Removal of bank protection at several sites
Floodplain / River corridor Large scale planting, Widening of flood corridor
Planform / Channel pattern Channel widening, Creation of willow island, Creation of braided channel, Allow future natural channel changes to occur
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Structure & condition of riparian zones Yes Yes Improvement
Continuity of sediment transport Yes Yes Improvement

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Public use Yes Yes Yes Improvement


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information