Case study:Massadammen-dam removal in River Tabergsån: Difference between revisions
No edit summary |
No edit summary |
||
Line 15: | Line 15: | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Massadammen-dam removal (photo. Maria Arola).JPG | |Project picture=Massadammen-dam removal (photo. Maria Arola).JPG | ||
|Picture description=After restoration | |Picture description=After restoration (photo. Maria Arola) | ||
|Project summary=Massadammen dam in the South of Jönköping in the River Tabergsån. The dam was built in 1906 for hydropower but the hydro power station was shut down in 1950´s. Because the dam was an obsticle for migrating fish it was decided to remove to improve the conditions for fish. The aim was to build fishpassage, increase the spawning areas for trout and to reduce the regulation and maintenance of the dam. The first plan of the restoration met heavy resistace from the local people because they wanted to maintain the water level. The new plan was made and three dams were built instead of one in the dammed area. The project was good example of the co-operation between different organization (municipality, consultants and local people) to find a goos solution for all parties. | |Project summary=Massadammen dam in the South of Jönköping in the River Tabergsån. The dam was built in 1906 for hydropower but the hydro power station was shut down in 1950´s. Because the dam was an obsticle for migrating fish it was decided to remove to improve the conditions for fish. The aim was to build fishpassage, increase the spawning areas for trout and to reduce the regulation and maintenance of the dam. The first plan of the restoration met heavy resistace from the local people because they wanted to maintain the water level. The new plan was made and three dams were built instead of one in the dammed area. The project was good example of the co-operation between different organization (municipality, consultants and local people) to find a goos solution for all parties. | ||
Revision as of 11:28, 13 December 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Habitat and biodiversity, Hydropower, Hydromorphology, Spatial planning |
Country | Sweden |
Main contact forename | Peter |
Main contact surname | Lindvall |
Main contact user ID | |
Contact organisation | Länsstyrelsen i Jönköpings län |
Contact organisation web site | http://projektwebbar.lansstyrelsen.se/vattern/Sv/besoksmal-vatterbackar/tabergsan/Pages/5-massadammen.aspx |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Massadammen dam in the South of Jönköping in the River Tabergsån. The dam was built in 1906 for hydropower but the hydro power station was shut down in 1950´s. Because the dam was an obsticle for migrating fish it was decided to remove to improve the conditions for fish. The aim was to build fishpassage, increase the spawning areas for trout and to reduce the regulation and maintenance of the dam. The first plan of the restoration met heavy resistace from the local people because they wanted to maintain the water level. The new plan was made and three dams were built instead of one in the dammed area. The project was good example of the co-operation between different organization (municipality, consultants and local people) to find a goos solution for all parties.
Most of the work was done between early august to late october in 2011. Because of the restoration spawning area for fish increased from 29 000 to 36 000 m2. Also densities of trout increased in the upstream. Densities were measured to be 5 times higher after than before restorations. Total cost of the project was approximately 174 000 euros.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | Massadammen-Motala Ström |
---|---|
WFD water body codes | 067 |
WFD (national) typology | |
WFD water body name | Tabergsån |
Pre-project morphology | Embanked, Artificial bed, Artificial channel |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | Yes |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | Artificially regulated |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2007 |
Works started | 2011/08/01 |
Works completed | 2011/10/31 |
Project completed | 2011/10/31 |
Total cost category | 100 - 500 k€ |
Total cost (k€) | 174174 k€ <br />174,000 € <br /> |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | Barriers to fish migration, Hydropower |
---|---|
Hydromorphology | Continuity for organisms |
Biology | Fish |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information