Case study:Vallacuera Ravine. Removal of a dyke: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 10: Line 10:
|Location=42.3447476856452, -1.7882823944091797
|Location=42.3447476856452, -1.7882823944091797
}}
}}
{{Project_overview
{{Project overview
|Status=
|Status=Complete
   
|Country=Spain
   
|Main contact forename=Fernando
      Complete
|Main contact surname=Mendoza
|Project web site url=
|Contact organisation=Gestión Ambiental Viveros y Repoblaciones de Navarra, S.A.
     
|Contact organisation url=www.gavrn.com/
|Themes=
|Multi-site=No
     
|Project summary=The dike built in the 80’s after the canalization works carried out in Arga River was removed to recover the natural floodplain in one of the tributaries’ confluence: Vallacuera stream.
|Country=
The main objective of this project is to restore the river Arga natural floodplain by removing the dyke and increasing the fluvial territory. There are other secondary objectives: to increase the quality of habitat in Community Interest Areas, with special attention to European mink (Mustela lutreola); creating new habitats for otter (Lutra lutra) and European turtle (Emys orbicularis); quality improvement of habitats 92A0 (willow and black poplar plantation) and 92D0 (tamarisk plantation); spatial planning for cattle.
      Spain
The project has a total budget of 138.840,25€ and is financed by GERVE-LIFE project, INTERREG GIRE project, "Gestión Ambiental, Viveros y Repoblaciones de Navarra, S.A." and Government of Navarre.
|Main contact forename=
 
      Fernando
|Main contact surname=
      Mendoza
|Main contact id=
     
|Contact organisation=
      Gestión Ambiental Viveros y Repoblaciones de Navarra, S.A.
|Contact organisation url=
     
|Partner organisations=
     
|Multi-site=
     
|Name of parent multi-site project=
     
|Project picture=
     
|Picture description=
     
|Project summary=
     
}}
}}
{{Case_study_subcatchment
{{Case_study_subcatchment

Revision as of 15:45, 12 December 2012

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 42° 20' 41.09" N, 1° 47' 17.82" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes
Country Spain
Main contact forename Fernando
Main contact surname Mendoza
Main contact user ID
Contact organisation Gestión Ambiental Viveros y Repoblaciones de Navarra, S.A.
Contact organisation web site http://www.gavrn.com/
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The dike built in the 80’s after the canalization works carried out in Arga River was removed to recover the natural floodplain in one of the tributaries’ confluence: Vallacuera stream. The main objective of this project is to restore the river Arga natural floodplain by removing the dyke and increasing the fluvial territory. There are other secondary objectives: to increase the quality of habitat in Community Interest Areas, with special attention to European mink (Mustela lutreola); creating new habitats for otter (Lutra lutra) and European turtle (Emys orbicularis); quality improvement of habitats 92A0 (willow and black poplar plantation) and 92D0 (tamarisk plantation); spatial planning for cattle. The project has a total budget of 138.840,25€ and is financed by GERVE-LIFE project, INTERREG GIRE project, "Gestión Ambiental, Viveros y Repoblaciones de Navarra, S.A." and Government of Navarre.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district C.H.Ebro
River basin Arga

Subcatchment

River name Arga
Area category
Area (km2)
Maximum altitude category 200 - 500 m
Maximum altitude (m) 286 m0.286 km <br />28,600 cm <br />
Dominant geology
Ecoregion Ibero-Macaronesian
Dominant land cover
Waterbody ID



Site

Edit site
Name Barranco de Vallacuera
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Embanked
Reference morphology Sinuous
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate Silt, Clay
River corridor land use
Average bankfull channel width category more than 50 m
Average bankfull channel width (m) 120120 m <br />0.12 km <br />12,000 cm <br />
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s) 33 m³/s <br />3,000 l/s <br />
Average channel gradient category
Average channel gradient 0.003
Average unit stream power (W/m2) 0.7355250.736 W/m² <br />


Project background

Edit project background
Reach length directly affected (m) 1000 m1 km <br />100,000 cm <br />
Project started 2006/09/01
Works started
Works completed 2007/04/01
Project completed
Total cost category 100 - 500 k€
Total cost (k€) 138 k€138,000 € <br />
Benefit to cost ratio
Funding sources Government of Navarra, Gestión Ambiental, Viveros y Repoblaciones de Navarra S.A., LIFE GERVE, INTERREG

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision Gestión Ambiental, Viveros y Repoblaciones de Navarra S.A.
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure Flood defence
Hydromorphology Channel pattern/planform, Width & depth variation
Biology
Physico-chemical
Other reasons for the project Flood risk management


Measures

Edit Measures
Structural measures
Bank/bed modifications New bioengineering elements in order to stabilize slope banks
Floodplain / River corridor Removal of exotic plants, Construction new habitats for otter (Lutra lutra) and European turtle (Emys orbicularis), Conditioning access to properties and pedestrian paths
Planform / Channel pattern Removal of a dyke
Other
Non-structural measures
Management interventions Reduce the risk of flooding downstream
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Channel pattern/planform Yes Awaiting results
Width & depth variation Yes Awaiting results

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Flood defense Yes Yes Yes Improvement


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information