Case study:Vallacuera Ravine. Removal of a dyke: Difference between revisions
No edit summary |
No edit summary |
||
Line 10: | Line 10: | ||
|Location=42.3447476856452, -1.7882823944091797 | |Location=42.3447476856452, -1.7882823944091797 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Country=Spain | |||
|Main contact forename=Fernando | |||
|Main contact surname=Mendoza | |||
|Contact organisation=Gestión Ambiental Viveros y Repoblaciones de Navarra, S.A. | |||
|Contact organisation url=www.gavrn.com/ | |||
|Multi-site=No | |||
|Project summary=The dike built in the 80’s after the canalization works carried out in Arga River was removed to recover the natural floodplain in one of the tributaries’ confluence: Vallacuera stream. | |||
|Country= | The main objective of this project is to restore the river Arga natural floodplain by removing the dyke and increasing the fluvial territory. There are other secondary objectives: to increase the quality of habitat in Community Interest Areas, with special attention to European mink (Mustela lutreola); creating new habitats for otter (Lutra lutra) and European turtle (Emys orbicularis); quality improvement of habitats 92A0 (willow and black poplar plantation) and 92D0 (tamarisk plantation); spatial planning for cattle. | ||
The project has a total budget of 138.840,25€ and is financed by GERVE-LIFE project, INTERREG GIRE project, "Gestión Ambiental, Viveros y Repoblaciones de Navarra, S.A." and Government of Navarre. | |||
|Main contact forename= | |||
|Main contact surname= | |||
|Contact organisation= | |||
|Contact organisation url= | |||
|Multi-site= | |||
|Project | |||
}} | }} | ||
{{Case_study_subcatchment | {{Case_study_subcatchment |
Revision as of 15:45, 12 December 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | Fernando |
Main contact surname | Mendoza |
Main contact user ID | |
Contact organisation | Gestión Ambiental Viveros y Repoblaciones de Navarra, S.A. |
Contact organisation web site | http://www.gavrn.com/ |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The dike built in the 80’s after the canalization works carried out in Arga River was removed to recover the natural floodplain in one of the tributaries’ confluence: Vallacuera stream.
The main objective of this project is to restore the river Arga natural floodplain by removing the dyke and increasing the fluvial territory. There are other secondary objectives: to increase the quality of habitat in Community Interest Areas, with special attention to European mink (Mustela lutreola); creating new habitats for otter (Lutra lutra) and European turtle (Emys orbicularis); quality improvement of habitats 92A0 (willow and black poplar plantation) and 92D0 (tamarisk plantation); spatial planning for cattle.
The project has a total budget of 138.840,25€ and is financed by GERVE-LIFE project, INTERREG GIRE project, "Gestión Ambiental, Viveros y Repoblaciones de Navarra, S.A." and Government of Navarre.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | C.H.Ebro |
---|---|
River basin | Arga |
Subcatchment
River name | Arga |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | 286 m0.286 km <br />28,600 cm <br /> |
Dominant geology | |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | |
Waterbody ID |
Site
Name | Barranco de Vallacuera |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Embanked |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | Silt, Clay |
River corridor land use | |
Average bankfull channel width category | more than 50 m |
Average bankfull channel width (m) | 120120 m <br />0.12 km <br />12,000 cm <br /> |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | 33 m³/s <br />3,000 l/s <br /> |
Average channel gradient category | |
Average channel gradient | 0.003 |
Average unit stream power (W/m2) | 0.7355250.736 W/m² <br /> |
Project background
Reach length directly affected (m) | 1000 m1 km <br />100,000 cm <br /> |
---|---|
Project started | 2006/09/01 |
Works started | |
Works completed | 2007/04/01 |
Project completed | |
Total cost category | 100 - 500 k€ |
Total cost (k€) | 138 k€138,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Government of Navarra, Gestión Ambiental, Viveros y Repoblaciones de Navarra S.A., LIFE GERVE, INTERREG |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | Gestión Ambiental, Viveros y Repoblaciones de Navarra S.A. | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | Flood defence |
---|---|
Hydromorphology | Channel pattern/planform, Width & depth variation |
Biology | |
Physico-chemical | |
Other reasons for the project | Flood risk management |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | New bioengineering elements in order to stabilize slope banks |
Floodplain / River corridor | Removal of exotic plants, Construction new habitats for otter (Lutra lutra) and European turtle (Emys orbicularis), Conditioning access to properties and pedestrian paths |
Planform / Channel pattern | Removal of a dyke |
Other | |
Non-structural measures
| |
Management interventions | Reduce the risk of flooding downstream |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Channel pattern/planform | Yes | Awaiting results | ||||
Width & depth variation | Yes | Awaiting results |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Flood defense | Yes | Yes | Yes | Improvement |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|