Case study:Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
(XML import)
Line 1: Line 1:
{{Case_study_status
{{Case_study_status
|Approval status=Draft
|Approval status=
   
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
|Location=42.0645445926, 25.6384945399
|Location=
   
   
     
}}
}}
{{Project overview
{{Project_overview
|Status=Complete
|Status=
|Themes=Habitat and biodiversity
   
|Country=Bulgaria
   
|Main contact forename=Plamen
      Complete
|Main contact surname=Mitkov
|Project web site url=
|Contact organisation=Dimitrovgrad municipality
     
|Contact organisation url=www.dimitrovgrad.bg/
|Themes=
|Multi-site=No
      Habitat and biodiversity
|Country=
      Bulgaria
|Main contact forename=
      Plamen
|Main contact surname=
      Mitkov
|Main contact id=
     
|Contact organisation=
      Dimitrovgrad municipality - http://www.dimitrovgrad.bg/
|Contact organisation url=
     
|Partner organisations=
     
|Multi-site=
     
|Name of parent multi-site project=
     
|Project picture=
     
|Picture description=
     
|Project summary=
     
}}
}}
{{Case_study_subcatchment
{{Case_study_subcatchment
Line 19: Line 52:
      
      
      
      
       Maritsa
        
}}
}}
{{Site
{{Site
Line 25: Line 58:
      
      
      
      
       protected area "Reka Maritsa"
        
|WFD water body code=
|WFD water body code=
       BG3MA350R039
        
|WFD (national) typology=
|WFD (national) typology=
       TR20
        
|WFD water body name=
|WFD water body name=
        
        
|Pre-project morphology=
|Pre-project morphology=
       Embanked
        
|Reference morphology=
|Reference morphology=
       Sinuous
        
|Heavily modified water body=
|Heavily modified water body=
       true
        
|Local site designation=
|Local site designation=
        
        
|Site designation=
|Site designation=
       EU - Special Area of Conservation
        
|Protected species present=
|Protected species present=
        
        
Line 51: Line 84:
        
        
|Dominant substrate=
|Dominant substrate=
       Sand
        
|River corridor land use=
|River corridor land use=
       Plantation forestry
        
|Average bankfull channel width category=
|Average bankfull channel width category=
       more than 50 m
        
|Avrg bankfull channel width=
|Avrg bankfull channel width=
        
        
|Average bankfull channel depth category=
|Average bankfull channel depth category=
       0.5 - 2 m
        
|Avrg1 bankfull channel depth=
|Avrg1 bankfull channel depth=
        
        
Line 77: Line 110:
        
        
|Project started=
|Project started=
       2009/02/01
        
|Works started=
|Works started=
        
        
|Works completed=
|Works completed=
       2012/02/01
        
|Project completed=
|Project completed=
        
        
|Total cost category=
|Total cost category=
       500 - 1000 k€
        
|Total1 cost=
|Total1 cost=
       851 k€
        
|Funding sources=
|Funding sources=
       Operative programme "Environment"2007-2013
        
|Investigation and design cost category=
|Investigation and design cost category=
        
        
Line 147: Line 180:
      
      
      
      
       Structure & condition of riparian/ lake shore zones
        
|Biological quality elements=
|Biological quality elements=
       Fish: Abundance
        
|Physico-chemical quality elements=
|Physico-chemical quality elements=
        
        
|Specific mitigation=
|Specific mitigation=
       Riparian development
        
|Other motivation=
|Other motivation=
        
        
Line 161: Line 194:
      
      
      
      
       Aforestation
        
|Floodplain / River corridor=
|Floodplain / River corridor=
        
        

Revision as of 10:36, 3 December 2012

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: none specified



Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity
Country Bulgaria
Main contact forename Plamen
Main contact surname Mitkov
Main contact user ID
Contact organisation Dimitrovgrad municipality - http://www.dimitrovgrad.bg/
Contact organisation web site
Partner organisations
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment



Site

Edit site
Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information