(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=57.63159676365744, 12.496434248657238 }} {{Project overview |Project title=Apelnäs fishway at River Rolfså...")
 
No edit summary
Line 6: Line 6:
}}
}}
{{Project overview
{{Project overview
|Project title=Apelnäs fishway at River Rolfså
|Status=Complete
|Status=Complete
|Themes=Fisheries, Habitat and biodiversity, Hydropower
|Themes=Fisheries, Habitat and biodiversity, Hydropower
Line 14: Line 13:
|Contact organisation=Länsstyrelsen västra Götalands län
|Contact organisation=Länsstyrelsen västra Götalands län
|Contact organisation url=projektwebbar.lansstyrelsen.se/rolfsan/Sv/folj-atgardsarbetet/Pages/Storan_apelnas_kraftverk.aspx
|Contact organisation url=projektwebbar.lansstyrelsen.se/rolfsan/Sv/folj-atgardsarbetet/Pages/Storan_apelnas_kraftverk.aspx
|Name of parent multi-site project=Case_study:Biologisk återställning i Rolfsåns vattensystem
|Multi-site=No
|Multi-site=No
|Name of parent multi-site project=Case_study:Biologisk återställning i Rolfsåns vattensystem
|Project summary=The Apelnäs powerplant was built in 1940. In 1995 denil fishway was constructed and dam removed. Only few fish passed the fishway because of the low flow which wasn´t enough to attract fish espesially to migrate downstreams. In 2009 construction of the new pool riffle fishway was ready and fish were able to migrate up and downstream. 
}}
}}
{{Case study subcatchment}}
{{Case study subcatchment}}

Revision as of 11:29, 13 November 2012

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 57° 37' 53.75" N, 12° 29' 47.16" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Fisheries, Habitat and biodiversity, Hydropower
Country Sweden
Main contact forename Andreas
Main contact surname Bäckstrand
Main contact user ID
Contact organisation Länsstyrelsen västra Götalands län
Contact organisation web site http://projektwebbar.lansstyrelsen.se/rolfsan/Sv/folj-atgardsarbetet/Pages/Storan apelnas kraftverk.aspx
Partner organisations
Parent multi-site project

Case_study:Biologisk återställning i Rolfsåns vattensystem

This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The Apelnäs powerplant was built in 1940. In 1995 denil fishway was constructed and dam removed. Only few fish passed the fishway because of the low flow which wasn´t enough to attract fish espesially to migrate downstreams. In 2009 construction of the new pool riffle fishway was ready and fish were able to migrate up and downstream.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment



Site

Edit site
Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information