Case study:Gilev's Grove reconstruction: Difference between revisions
No edit summary |
No edit summary |
||
Line 92: | Line 92: | ||
{{Toggle content start}} | {{Toggle content start}} | ||
{{Case study subcatchment}} | {{Case study subcatchment}} | ||
{{Site}} | {{Site | ||
|Name=the Gilev's Grove | |||
|WFD water body name=Klyuchi stream | |||
|Pre-project morphology=fluvial | |||
|Reference morphology=fluvial | |||
|Desired post project morphology=fluvial | |||
|Heavily modified water body=No | |||
|Local site designation=local recreation place | |||
|Protected species present=No | |||
|Invasive species present=No | |||
|Dominant hydrology=brook, small stream | |||
|Dominant substrate=Sand, Clay, | |||
|River corridor land use=parklands fofrest | |||
|Average bankfull channel width category=2 - 5 m | |||
|Average bankfull channel depth category=Less than 0.5 m | |||
|Mean discharge category=Less than 0.1 m³/s | |||
|Average channel gradient category=0.001 - 0.01 | |||
}} | |||
{{Project background}} | {{Project background}} | ||
{{Motivations}} | {{Motivations}} |
Revision as of 11:50, 25 February 2019
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | http://https://72.ru/text/gorod/294961606352896.html |
Themes | Habitat and biodiversity, Hydromorphology, Social benefits, Spatial planning, Water quality |
Country | Russia |
Main contact forename | Timur |
Main contact surname | Pavluk |
Main contact user ID | User:T.Pavluk |
Contact organisation | RosNIIVH |
Contact organisation web site | http://wrm.ru |
Partner organisations | |
This is a parent project encompassing the following projects |
Project summary
Reconstruction of a unique forest park, which is located between two water objects - the Klyuchi stream and Lake Krivoe - began in 2015 and ended in November of 2016.
Objectives to be achieved:
1) Protection and restoration of the Klyuchi stream valley. The workers stabilized about 23 thousand square meters of slopes and re-designed the bed of the Klyuchi stream. New bridge-passage was built over the stream in the grove. After restoration works completion the unpleasant smell from the Klyuchi stream in the forest park was not traced anymore.
2) Allocation of entertainment facilities: large picnic mangal-barbeque zone. 19 arbors were installed along the stream. Swings were mounted for kids between arbors. Sanitation facilities were put nearby as well.
3) Installation of new playgrounds for children. They are designed for children of different ages and different interests. There are sandboxes and swings for toddlers and various sports equipment for tinagers. Comfortable benches installed carefully for parents throughout the gaming area.
4) Gilev's Grove had been and remains a great place for sports. In winter time there is a hockey box and illuminated ski track. In warm season active leisure lovers will enjoy a pleasant cycle path and six playgrounds for sports. People with pleasure ride on rollers, scooters, skateboards, bicycles and even roller skis, run and do Scandinavian walking.
5) For nature lovers the birds watch zone is equipped on the shore of Lake Krivoe. This part of the Grove is rarely crowded. Only birds singing violates silence of the beautiful view of the lake here.
6) Grove is a great place for photo shoots. Especially for the newlyweds, who often come here to capture the happy moments of their lives, an admiring white open-air pavilion not far from the central entrance was installed.
7) After reconstruction, figures of various animals appeared in the Gilev's Grove. The sculptures are very popular among children.
8) Park territory became as comfortable, as safe. On the territory 427 lanterns and more than 200 surveillance cameras were installed. Throughout the entire walking routes, new benches and litter bins were allocated.
9) Tyumen residents who came to the Grove by car, no longer need to worry about parking. New parking place was arranged for 468 cars.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|