Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île: Difference between revisions

From RESTORE
Jump to navigation Jump to search
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=44.963733, 4.8473920000000135 }} {{Project overview |Project title=Reactivating river dynamics in the Vieux-...")
 
No edit summary
Line 17: Line 17:
}}
}}
{{Image gallery}}
{{Image gallery}}
{{Case study image
|File name=Rhone.png
|Caption=Old Girardon dike along the Rhône where flood debris accumulated, before the dike was opened. September 2011 (Compagnie nationale du Rhône).
}}
{{Case study image
|File name=Connected floodzones.png
|Caption=Connection of flood storage zones in Cornas, during flooding. December 2012 (Juan Robert).
}}
{{Case study image
|File name=Graven.png
|Caption=Opening of the Girardon dike at Cornas. October 2011 (Juan Robert).
}}
{{Case study image
|File name=Petite prior.png
|Caption=The fallow Petite Île site prior to the work. October 2011 (Compagnie nationale du Rhône).
}}
{{Case study image
|File name=Vertical earthwpork.png
|Caption=Vertical earthwork on the Petite Île site. The stratification (gravel layers) is clearly visible (Compagnie nationale du Rhône).
}}
{{Image gallery end}}
{{Image gallery end}}
{{Toggle button}}
{{Toggle button}}

Revision as of 14:24, 19 June 2018

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 44° 57' 49.44" N, 4° 50' 50.61" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Hydromorphology, Monitoring
Country France
Main contact forename William
Main contact surname Brasier
Main contact user ID
Contact organisation Compagnie nationale du Rhône (CNR)
Contact organisation web site http://www.cnr.tm.fr/en/
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Old Girardon dike along the Rhône where flood debris accumulated, before the dike was opened. September 2011 (Compagnie nationale du Rhône).
Connection of flood storage zones in Cornas, during flooding. December 2012 (Juan Robert).
Opening of the Girardon dike at Cornas. October 2011 (Juan Robert).
The fallow Petite Île site prior to the work. October 2011 (Compagnie nationale du Rhône).
Vertical earthwork on the Petite Île site. The stratification (gravel layers) is clearly visible (Compagnie nationale du Rhône).
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information