Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze: Difference between revisions
Jump to navigation
Jump to search
Josee Peress (talk | contribs) No edit summary |
No edit summary |
||
Line 20: | Line 20: | ||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} | ||
{{Case study image | |||
|File name=Vezouze 1.png | |||
|Caption=The Vezouze at Lunéville before restoration work. The levee on the left bank prevents flood storage in the flood plain (Rhin-Meuse Water Agency) | |||
}} | |||
{{Case study image | |||
|File name=Vezouze 2.png | |||
|Caption=Flood plain of the Vezouze. Creation of a flood channel on the left bank - work phase – July 2007 (Philippe Russo - Rhin-Meuse Water Agency) | |||
}} | |||
{{Case study image | |||
|File name=Vezouze3.png | |||
|Caption=Flood plain of the Vezouze. Flood channel on the left bank - 6 months after the work - December 2007 (Philippe Russo - Rhin-Meuse Water Agency) | |||
}} | |||
{{Case study image | |||
|File name=Vezouze 4.png | |||
|Caption=Flood plain of the Vezouze. Flood channel on the left bank - 2 years after the work - May 2009 (Pierre Mangeot - Rhin-Meuse Water Agency) | |||
}} | |||
{{Image gallery end}} | {{Image gallery end}} | ||
{{Toggle button}} | {{Toggle button}} |
Revision as of 13:31, 24 July 2018
This case study is pending approval by a RiverWiki administrator.
Location: 48° 35' 12.42" N, 6° 29' 12.43" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | http://www.onema.fr/IMG/EV/publication/rex_VezouzeGB.pdf |
Themes | Flood risk management, Habitat and biodiversity, Hydromorphology, Monitoring, Social benefits, Urban |
Country | France |
Main contact forename | Josee |
Main contact surname | Peress |
Main contact user ID | User:Josee Peress |
Contact organisation | Onema |
Contact organisation web site | http://www.onema.fr/Hydromorphologie,510 |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|