Case study:Restoration project in the stream of the Vall d'Horta and surrounds. Natural Park of Sant Llorenç del Munt i l'Obac.: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
 
 
   
      Draft
}}
}}
{{Location
{{Location

Revision as of 13:02, 14 November 2014

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 41° 40' 8.63" N, 2° 2' 34.75" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Environmental flows and water resources, Habitat and biodiversity, Land use management - forestry
Country Spain
Main contact forename Naturalea S.L.
Main contact surname Naturalea S.L.
Main contact user ID
Contact organisation Naturalea S.L.
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Example of bank protection used

Project summary

Edit project overview to modify the project summary.


The work carried out aims to improve the processes of regeneration and improvement of forest structure, minimize erosion, improve the social use, improve the drainage of the stream and the biological connection of a weir with a fish ladder and rehabilitate different habitats. The main objectives of this project are improved post-fire forest structure with the removal of dead wood and selective pruning of some feet; improvement of plant diversity by planting species; improving the dynamics of the stream; promote the area as a recreation space the stream and the home environment of the Muntada; sort the area to prevent environmental deterioration (erosion, loss of soil and plant diversity, etc..); landscape integration of the work done. The project has a total budget of 72.226 € and is financed by the Council of Barcelona and by the Natural Park Sant Llorenç de Munt i l'Obac.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Map of the restoration area
Map of the restoration area
Photos of the area before and after works
Photos of the area before and after works
Photos of the area before and after works
Photos of the area before and after works
Photos of the area before and after works
Photos of the area before and after works
Photos of the area before and after works
Photos of the area before and after works
Photos of the area before and after works
Photos of the area before and after works
Photos of the area before and after works
Photos of the area before and after works
Photos of the area before and after works
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Pirineo Oriental
River basin Besós

Subcatchment

River name Riera de la Val d'Horta
Area category Less than 10 km²
Area (km2) 6 km²600 ha <br />
Maximum altitude category 500 - 1000 m
Maximum altitude (m) 510 m0.51 km <br />51,000 cm <br />
Dominant geology
Ecoregion Ibero-Macaronesian
Dominant land cover
Waterbody ID



Other case studies in this subcatchment: Restoration project in the stream of the Vall d'Horta and surrounds. Natural Park of Sant Llorenç del Munt i l'Obac.


Site

Name Riera de la Val d'Horta
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Sinuous
Reference morphology Sinuous
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category 2 - 5 m
Average bankfull channel width (m) 33 m <br />0.003 km <br />300 cm <br />
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 2015 m2.015 km <br />201,500 cm <br />
Project started
Works started
Works completed
Project completed
Total cost category 50 - 100 k€
Total cost (k€) 72 k€72,000 € <br />
Benefit to cost ratio
Funding sources Council of Barcelona, PN Sant Llorenç de Munt i l'Obac

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision Naturalea, S.L.
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Wildfire erosion protection
Hydromorphology Continuity for organisms, Structure & condition of riparian zones
Biology
Physico-chemical
Other reasons for the project Bank erosion, Landscape enhancement


Measures

Structural measures
Bank/bed modifications New bioengineering elements in order to stabilize slope banks, Installing fish scale
Floodplain / River corridor Cutting or pruning health of individuals affected by the fire to accelerate natural regeneration, Removal of exotic plants
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information