Case study:Basic proposals for restoration and enhancement of the stream of Vilamajor in Sant Antoni de Vilamajor: Difference between revisions
No edit summary |
No edit summary |
||
Line 10: | Line 10: | ||
|Location=41.6735328, 2.400639299999966 | |Location=41.6735328, 2.400639299999966 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Country=Spain | |||
|Main contact forename=Naturalea | |||
|Main contact surname=Naturalea | |||
|Contact organisation=Naturalea | |||
|Contact organisation url=www.naturalea.eu | |||
|Multi-site=No | |||
|Project summary=The stretch to restore is near the town center, which has led to the channeling of the river and the installation of auxiliary structures. On the other hand, it has increased the proliferation of alien invasive species and it has retreated riparian vegetation. | |||
|Country= | The main actions in this project are: the use of new bioengineering elements in order to stabilize slope banks; naturalize space by planting trees, shrubs and heliophilous; management of drainage of surface runoff by constructing a rainwater collect. | ||
The project has a total budget of 20.354,29 € and is financed by the Municipality of Sant Antoni de Vilamajor. | |||
|Main contact forename= | |||
|Main contact surname= | |||
|Contact organisation= | |||
|Contact organisation url= | |||
|Multi-site= | |||
|Project | |||
}} | }} | ||
{{Case_study_subcatchment | {{Case_study_subcatchment |
Revision as of 17:29, 12 December 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | Naturalea |
Main contact surname | Naturalea |
Main contact user ID | |
Contact organisation | Naturalea |
Contact organisation web site | http://www.naturalea.eu |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The stretch to restore is near the town center, which has led to the channeling of the river and the installation of auxiliary structures. On the other hand, it has increased the proliferation of alien invasive species and it has retreated riparian vegetation.
The main actions in this project are: the use of new bioengineering elements in order to stabilize slope banks; naturalize space by planting trees, shrubs and heliophilous; management of drainage of surface runoff by constructing a rainwater collect.
The project has a total budget of 20.354,29 € and is financed by the Municipality of Sant Antoni de Vilamajor.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Pirineo Oriental |
---|---|
River basin | Besós |
Subcatchment
River name | Riera de Sant Antoni de Vilamajor |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | 260 m0.26 km <br />26,000 cm <br /> |
Dominant geology | |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | Urban |
Waterbody ID |
Site
Name | Tramo entre el puente de la calle Sant Pere y el puente de la calle Sant Jordi |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Entrenched |
Reference morphology | Entrenched |
Desired post project morphology | |
Heavily modified water body | true |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | 2 - 5 m |
Average bankfull channel width (m) | 55 m <br />0.005 km <br />500 cm <br /> |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 82 m0.082 km <br />8,200 cm <br /> |
---|---|
Project started | 2010/01/01 |
Works started | |
Works completed | 2010/10/01 |
Project completed | |
Total cost category | 10 - 50 k€ |
Total cost (k€) | 20 k€20,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Municipality of Sant Antoni de Vilamajor |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | Naturalea, S.L. | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | Channel pattern/planform, Structure & condition of riparian zones |
Biology | |
Physico-chemical | |
Other reasons for the project | Landscape enhancement |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | New bioengineering elements in order to stabilize slope banks |
Floodplain / River corridor | Recovery riparian vegetation |
Planform / Channel pattern | Works to safeguard the bridge |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|