Case study:Environmental restoration project of the river area of the Ripoll River as it passes through the municipality of Ripollet (Vallès Occidental): Difference between revisions
(XML import) |
No edit summary |
||
Line 13: | Line 13: | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Country=Spain | |||
|Main contact forename=`Enginyeria, Estudios i Gestió Ambiental S.L. | |||
|Main contact surname=Enginyeria, Estudios i Gestió Ambiental S.L. | |||
|Contact organisation=Enginyeria, Estudios i Gestió Ambiental S.L. | |||
|Multi-site=No | |||
|Project summary=The stretch of the River Ripoll in which the project is located, is bounded longitudinally by longitudinal structures (walls and breakwaters) amending river morphology and determine the formation of river banks. The river also has transversal structures. The existing vegetation does not correspond to the potential vegetation due to the high population pressure on land that has suffered over time. There is an important agricultural pressure and few spaces are not occupied by gardens. | |||
The main objectives of this project are: remove the set up gardens in the area of the project; restore the original profile of the channel prior to the installation of the orchards; minimize the impact caused by waste, trash and debris; eliminate the presence of alien species; recovery hydrological, landscape and ecology of the river; encourage the stabilization and protection of river banks against erosion; enhancing the role of River Biological Corridor; inform the public about the river area as well as the objectives and work involved in the project. | |||
|Country= | |||
|Main contact forename= | |||
|Main contact surname= | |||
|Contact organisation= | |||
|Multi-site= | |||
| | |||
}} | }} | ||
{{Case_study_subcatchment | {{Case_study_subcatchment |
Revision as of 09:22, 18 February 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | `Enginyeria, Estudios i Gestió Ambiental S.L. |
Main contact surname | Enginyeria, Estudios i Gestió Ambiental S.L. |
Main contact user ID | |
Contact organisation | Enginyeria, Estudios i Gestió Ambiental S.L. |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The stretch of the River Ripoll in which the project is located, is bounded longitudinally by longitudinal structures (walls and breakwaters) amending river morphology and determine the formation of river banks. The river also has transversal structures. The existing vegetation does not correspond to the potential vegetation due to the high population pressure on land that has suffered over time. There is an important agricultural pressure and few spaces are not occupied by gardens.
The main objectives of this project are: remove the set up gardens in the area of the project; restore the original profile of the channel prior to the installation of the orchards; minimize the impact caused by waste, trash and debris; eliminate the presence of alien species; recovery hydrological, landscape and ecology of the river; encourage the stabilization and protection of river banks against erosion; enhancing the role of River Biological Corridor; inform the public about the river area as well as the objectives and work involved in the project.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Pirineo Oriental |
---|---|
River basin | Besós |
Subcatchment
River name | Ripoll |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | Less than 100 m |
Maximum altitude (m) | 60 m0.06 km <br />6,000 cm <br /> |
Dominant geology | |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | |
Waterbody ID |
Site
Name | Río Ripoll a su paso por el municipio de Ripollet |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 26 m0.026 km <br />2,600 cm <br /> |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | Less than 10 k€"Less than 10 k€" is not in the list (Less than 1 k€, 1 - 10 k€, 10 - 50 k€, 50 - 100 k€, 100 - 500 k€, 500 - 1000 k€, 1000 - 5000 k€, 5000 - 10000 k€, more than 10000 k€) of allowed values for the "Total cost category" property. |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | Direction General of Architecture and Landscape Department of Planning and Public Works of the Generalitat of Catalonia |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | Enginyeria, Estudios i Gestió Ambiental S.L. | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | Structure & condition of riparian zones, Channel pattern/planform |
Biology | |
Physico-chemical | |
Other reasons for the project | Landscape enhancement |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | New bioengineering elements in order to stabilize slope banks, Bank stabilization |
Floodplain / River corridor | Removal of irrigation canals, Elimination of structural elements concreted, Removal of exotic plants |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|