Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias): Difference between revisions
(XML import) |
No edit summary |
||
Line 13: | Line 13: | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Country=Spain | |||
|Main contact forename=Juan Antonio | |||
|Main contact surname=Martín Ventura | |||
|Contact organisation=C.H.Cantábrico | |||
|Multi-site=No | |||
|Project summary=Despite its good condition, riparian forests are under human pressure (pipelines, agricultural practices) that have reduced its size and fragmented. The pipelines have altered the natural processes of adjustment of the channels. Narcea River is one of the most important rivers in the North of Spain. | |||
The main actions of this project are creating a river corridor and removal of the structures that limit the development of natural geomorphic processes; control of invasive species and ways to improve the composition and extent of riparian forest; actions to mitigate the impact of flooding; and comply with the requirements of the WFD. | |||
|Country= | |||
|Main contact forename= | |||
|Main contact surname= | |||
|Contact organisation= | |||
|Multi-site= | |||
|Project | |||
}} | }} | ||
{{Case_study_subcatchment | {{Case_study_subcatchment |
Revision as of 10:50, 4 January 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | Juan Antonio |
Main contact surname | Martín Ventura |
Main contact user ID | |
Contact organisation | C.H.Cantábrico |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Despite its good condition, riparian forests are under human pressure (pipelines, agricultural practices) that have reduced its size and fragmented. The pipelines have altered the natural processes of adjustment of the channels. Narcea River is one of the most important rivers in the North of Spain.
The main actions of this project are creating a river corridor and removal of the structures that limit the development of natural geomorphic processes; control of invasive species and ways to improve the composition and extent of riparian forest; actions to mitigate the impact of flooding; and comply with the requirements of the WFD.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | C.H.Cantábrico |
---|---|
River basin | Narcea |
Subcatchment
River name | Narcea |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | Less than 100 m |
Maximum altitude (m) | 50 m0.05 km <br />5,000 cm <br /> |
Dominant geology | Siliceous, Calcareous |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | |
Waterbody ID |
Site
Name | Tramo bajo del río Narcea entre Salas y Pravia |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Sinuous, Entrenched |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | Site of Community Importance |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | 0.003 |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 17000 m17 km <br />1,700,000 cm <br /> |
---|---|
Project started | 2008/01/01 |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | C.H.Cantábrico |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Revetmens with local species, Removal of exotic plants, New bioengineering elements in order to stabilize slope banks |
Floodplain / River corridor | Riparian tree planting, Silvicultural treatments |
Planform / Channel pattern | Re-instatement of old course (meander) |
Other | |
Non-structural measures
| |
Management interventions | Promotion and management of tourism in the river |
Social measures (incl. engagement) | Information panels for people, New pahts near the river |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|