Case study:Splash: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 2: Line 2:
|Approval status=Approved
|Approval status=Approved
}}
}}
{{Location}}
{{Location
|Location=52.1502829, -3.400763099999949
}}
{{Project overview
{{Project overview
|Status=Complete
|Status=Complete

Revision as of 10:53, 8 June 2015

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 9' 1.02" N, 3° 24' 2.75" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.wyeuskfoundation.org/projects/splash.php
Themes Habitat and biodiversity, Social benefits
Country Wales
Main contact forename Stephen
Main contact surname Marsh-Smith
Main contact user ID
Contact organisation Wye & Usk Foundation
Contact organisation web site http://www.wyeuskfoundation.org/
Partner organisations Environmental Agency Wales
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


Splash is a Wales Assembly Government Fund, managed by Environment Agency Wales, and is designed to assist and enable projects that improve public access to Wales’s waterways for recreational and educational activities. The Foundation received Splash funding from 2008-2010 to continue the Passport Scheme and to facilitate Canoe Access Arrangements on those sections of the Wye and Usk that have no right of navigation.

The access point at Llangurig on the upper Wye, established by the Foundation with Splash funding.The Buckland South beat on the Usk, which joined the Passport scheme in 2009.

Our first project (October 2008 – March 2009) was the "Canoe Access Reconciliation Project" (CARP), which extended and maintained the previous access agreements pioneered by the Foundation with WAG and CCW for the upper Wye & Usk. Within CARP (total budget £10,000) we extended the agreements to cover the Rhayader to Llanwrthwl stretch of the upper Wye (including signage and website information) and installed a new webcam at Rhayader.

At the same time Splash also contributed £20,000 towards the 2009 Passport. With this we produced and distributed the 2009 brochure, signed up 7 new beats in Wales, improved access to 15 beats and installed 2 new webcams.

Our second tranche of Splash funding (August 2008 to March 2010) included a further £13,000 for canoe access and £10,000 for the Passport scheme. Within this we extended the access agreements on the upper Wye from Llangurig downstream to Rhayader and investigated extending them below Crickhowell on the Usk. We also produced the 2010 Passport booklet with 4 new Welsh beats.

Splash funding has enabled us to continue and expand the Wye and Usk Passport and invest in, maintain and extend canoe access agreements in the face of increasing pressure for free and open access to all Welsh rivers. The Foundation believes that access arrangements should be voluntary and agreed amongst stakeholders: a free for all would not be in the best interests of any of the parties.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2008/08/01
Works started
Works completed
Project completed 2010/03/31
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Lack of public access to Wales’s waterways
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Created canoe access points
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information