Case study:Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz.: Difference between revisions
Jump to navigation
Jump to search
(XML import) |
No edit summary |
||
Line 8: | Line 8: | ||
}} | }} | ||
{{Location | {{Location | ||
|Location= | |Location=39.00491168506384, -5.767478942871094 | ||
}} | }} | ||
{{Project_overview | {{Project_overview |
Revision as of 12:14, 28 December 2012
This case study is pending approval by a RiverWiki administrator.
Location: 39° 0' 17.68" N, 5° 46' 2.92" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | |
Main contact surname | |
Main contact user ID | |
Contact organisation | MARM |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | C.H.Guadiana |
---|---|
River basin | Guadiana |
Subcatchment
River name | Zújar |
---|---|
Area category | 1000 - 10000 km² |
Area (km2) | 8505 km²850,500 ha <br /> |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | 285 m0.285 km <br />28,500 cm <br /> |
Dominant geology | Siliceous |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | |
Waterbody ID |
Other case studies in this subcatchment: Environmental restoration of the river Zújar, Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz., Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz., Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz., Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz.
Site
Name | Badén del Zújar (Badajoz) |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Sinuous |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | Site of Community Importance |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | Extensive agriculture |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 2500 m2.5 km <br />250,000 cm <br /> |
---|---|
Project started | 2011/01/01 |
Works started | |
Works completed | 2011/01/01 |
Project completed | |
Total cost category | 1000 - 5000 k€ |
Total cost (k€) | 3499 k€3,499,000 € <br /> |
Benefit to cost ratio | |
Funding sources | MARM |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | SEFOEX, S.A. | ||||
Post-project management and maintenance | |||||
Monitoring | C.H.Guadiana |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project | Landscape enhancement |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | Creation of wetlands in ancient agregates extraction areas |
Planform / Channel pattern | |
Other | Recovering natural landscapes |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|