Case study:Ecological Restoration of Natural Lake Pochina: Difference between revisions

From RESTORE
Jump to navigation Jump to search
(Replaced content with "{{Location |Location=46.00069, 28.095925 }}")
(XML import)
Line 1: Line 1:
{{Case_study_status
|Approval status=Draft
}}
{{Location
{{Location
|Location=46.00069, 28.095925
|Location=
   
   
      46.00069,28.095952
}}
{{Project_overview
|Status=
   
   
      Complete
|Project web site url=
     
|Themes=
      Habitat and biodiversity
|Country=
      Romania
|Main contact forename=
      Fica
|Main contact surname=
      Boldea
|Main contact id=
     
|Contact organisation=
      Prut - Barlad River Basin Authority
|Contact organisation url=
     
|Partner organisations=
     
|Multi-site=
     
|Name of parent multi-site project=
     
|Project picture=
     
|Picture description=
     
|Project summary=
     
}}
{{Case_study_subcatchment
|Subcatchment=
   
   
      Prut
}}
{{Site
|Name=
   
   
      Pochina Lake
|WFD water body code=
      ROLW13.1_B5.2
|WFD (national) typology=
      ROLN01
|WFD water body name=
     
|Pre-project morphology=
      Side ponds
|Reference morphology=
      Single channel,Supply channel and discharge channel wich gravitational transfer a sufficient water volum to contribute to the conservation of this special area
|Heavily modified water body=
     
|Local site designation=
     
|Site designation=
      EU - Special Protected Area
|Protected species present=
     
|Invasive species present=
     
|Species=
     
|Dominant hydrology=
     
|Dominant substrate=
      Silt,Sedimentary rocks (mixture of sand and mud of fluviatile origin).
|River corridor land use=
      Wetland
|Average bankfull channel width category=
     
|Avrg bankfull channel width=
     
|Average bankfull channel depth category=
     
|Avrg1 bankfull channel depth=
     
|Mean discharge category=
     
|Mn discharge=
     
|Average channel gradient category=
     
|Avrg channel gradient=
     
}}
{{Project_background
|Reach length directly affected=
   
   
     
|Project started=
      2005/11/01
|Works started=
      2006/05/01
|Works completed=
      2006/06/01
|Project completed=
     
|Total cost category=
      10 - 50 k€
|Total1 cost=
      31 k€
|Funding sources=
      From LIFE Nature Programm; Co-financig Ministry of Environment and County Council Galati,Regional Agenty for Environmental Protection Galati (RAEP Galati)
|Investigation and design cost category=
      Less than 1 k€
|Invst and design cost=
      0.737 k€
|Investigation and design Lead organisation=
      Regional Agenty for Environmental Protection Galati (REPA Galati)
|Investigation and design Other contact forename=
      Fica
|Investigation and design Other contact surname=
      Boldea
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
      Regional Agenty for Environmental Protection Galati (RAEP Galati)
|Stakeholder engagement Other contact forename=
      Fica
|Stakeholder engagement Other contact surname=
      Boldea
|Works1 and supervision cost category=
      Less than 1 k€
|Wrk and supervision cost=
      0.368 k€
|Works and supervision Lead organisation=
     
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
{{Motivations
|Hydromorphological quality elements=
   
   
      Width & depth variation
|Biological quality elements=
     
|Physico-chemical quality elements=
      Oxygen balance
|Specific mitigation=
     
|Other motivation=
     
}}
{{Measures
|Bank and bed modifications measure=
   
   
     
|Floodplain / River corridor=
     
|Planform / Channel pattern=
     
|Other technical measure=
      The two channels for Vlăşcuţa Lake (in total length of about 542 m) were reshaped and consolidated, so that they assure the supply and the evacuation from/to lake/river Prut, subject to necessary water level of the lake.
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
      Information provision
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_element_table_row
|Element=
   
   
   
      Width & depth variation
|Monitored before=
     
|Monitored after=
     
|Qualitative monitoring=
     
|Quantitative monitoring=
     
|Control site used=
     
|Result=
      Improvement
}}
{{End_table}}
{{Biological_quality_elements_header}}
{{End_table}}
{{Physico-chemical_quality_elements_header}}
{{End_table}}
{{Other_responses_header}}
{{End_table}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Image_gallery}}
{{Image_gallery_end}}
{{Additional_Documents}}
{{Additional_Documents_end}}
{{Additional_links_and_references_header}}
{{Additional_links_and_references_footer}}
{{Supplementary_Information
|Information=
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
     
}}
}}
{{Case_study_upload}}

Revision as of 06:52, 7 September 2012

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 46° 0' 2.48" N, 28° 5' 45.43" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity
Country Romania
Main contact forename Fica
Main contact surname Boldea
Main contact user ID
Contact organisation Prut - Barlad River Basin Authority
Contact organisation web site
Partner organisations
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district Danube
River basin Prut Barlad

Subcatchment

River name Prut
Area category Less than 10 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m)
Dominant geology Siliceous
Ecoregion Eastern Plains
Dominant land cover
Waterbody ID



Other case studies in this subcatchment: Ecological Restoration of Mata-Radeanu Complex, Ecological Restoration of Vlascuta Lake, The Ciobarciu Wetland Project


Site

Edit site
Name Pochina Lake
WFD water body codes ROLW13.1_B5.2
WFD (national) typology ROLN01
WFD water body name
Pre-project morphology Side ponds
Reference morphology Single channel, Supply channel and discharge channel wich gravitational transfer a sufficient water volum to contribute to the conservation of this special area
Desired post project morphology
Heavily modified water body
National/international site designation EU - Special Protected Area
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate Silt, Sedimentary rocks (mixture of sand and mud of fluviatile origin).
River corridor land use Wetland
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started 2005/11/01
Works started 2006/05/01
Works completed 2006/06/01
Project completed
Total cost category 10 - 50 k€
Total cost (k€) 31 k€31,000 € <br />
Benefit to cost ratio
Funding sources From LIFE Nature Programm; Co-financig Ministry of Environment and County Council Galati, Regional Agenty for Environmental Protection Galati (RAEP Galati)

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Less than 1 k€ 0.737 k€737 € <br /> Regional Agenty for Environmental Protection Galati (REPA Galati) Fica Boldea
Stakeholder engagement and communication Regional Agenty for Environmental Protection Galati (RAEP Galati) Fica Boldea
Works and works supervision Less than 1 k€ 0.368 k€368 € <br />
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology Width & depth variation
Biology
Physico-chemical Oxygen balance
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other The two channels for Vlăşcuţa Lake (in total length of about 542 m) were reshaped and consolidated, so that they assure the supply and the evacuation from/to lake/river Prut, subject to necessary water level of the lake.
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other Information provision


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Width & depth variation Improvement

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information