Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage.: Difference between revisions
Anna.polazzo (talk | contribs) m (Anna.polazzo moved page Case study:Improvement of ecological state of the river between the dam Pisuerga Aguilar de Campo and Alar del Rey (Palencia) 1st Stage. to [[Case study:Improvement of ecological state of the river Pisuerga between the dam o...) |
No edit summary |
||
Line 189: | Line 189: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Improve the structure and composition of the vegetation, Bank stabilisation, | ||
|Floodplain / River corridor=Improve longitudinal connectivity | |||
|Other technical measure=Improve aquatic habitats and recover aquatic communities | |||
|Social measures=Improved network of trails,Information panels for people | |||
|Floodplain / River corridor= | |||
|Other technical measure= | |||
|Social measures= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Revision as of 07:34, 1 June 2017
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | Ignacio |
Main contact surname | Rodríquez |
Main contact user ID | |
Contact organisation | Confederación Hidrográfica del Duero |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Pisuerga River has a high regulation of the flow regime, which determines an artificial and seasoned flow regime. Also, the massive release of sediments is affected by the presence of weirs, which difficult and blocks the mobility for fish upstream migration and habitat availability.
This is the first stage of the total project which involves mitigation and preventive measures. The global objectives are: Improve aquatic habitats and recover aquatic communities; improve longitudinal connectivity; stream bank stabilization; improve the structure and composition of the vegetation. The measures comprise earthworks for bank stabilization (to reduce erosion and sediment input, and facilitate the establishment of vegetation), the installation of fish pass and the rehabilitation of spawning areas.
The project has a total budget of 3.135.508 € and is financed by the Ministry of Environment, as part of the National Strategy for River Restoration.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|