Case study:Restoration project of the degraded area of the Molí source environment and improvement of river areas and adjacent riparian formations: Difference between revisions
No edit summary |
No edit summary |
||
Line 12: | Line 12: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Habitat and biodiversity, Hydromorphology | |||
|Country=Spain | |Country=Spain | ||
|Main contact forename=Naturalea S.L. | |Main contact forename=Naturalea S.L. | ||
Line 17: | Line 18: | ||
|Contact organisation=Naturalea S.L. | |Contact organisation=Naturalea S.L. | ||
|Multi-site=No | |Multi-site=No | ||
|Project summary= The area to be restored has been divided into two sections. In the first, there is a medieval wall damaged by time and erosion visible on the slope that separates the river bed. In the second, we see the effects of erosion caused by a channel: nearly vertical slope with landslides in some areas. | |Project picture=055 Fluvia en Besalu.jpg | ||
|Project summary=The area to be restored has been divided into two sections. In the first, there is a medieval wall damaged by time and erosion visible on the slope that separates the river bed. In the second, we see the effects of erosion caused by a channel: nearly vertical slope with landslides in some areas. | |||
The main actions in this project are: the use of new bioengineering elements in order to stabilize slope banks and to prevent erosion in town wall; replaced the hard defenses by bioengineering structures; facilitate natural regeneration of riparian vegetation. | The main actions in this project are: the use of new bioengineering elements in order to stabilize slope banks and to prevent erosion in town wall; replaced the hard defenses by bioengineering structures; facilitate natural regeneration of riparian vegetation. | ||
The project has a total budget of 94.788,5 € and is financed by the Municipality of Besalú. | The project has a total budget of 94.788,5 € and is financed by the Municipality of Besalú. | ||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} |
Revision as of 09:58, 29 September 2014
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Hydromorphology |
Country | Spain |
Main contact forename | Naturalea S.L. |
Main contact surname | Naturalea S.L. |
Main contact user ID | |
Contact organisation | Naturalea S.L. |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The area to be restored has been divided into two sections. In the first, there is a medieval wall damaged by time and erosion visible on the slope that separates the river bed. In the second, we see the effects of erosion caused by a channel: nearly vertical slope with landslides in some areas.
The main actions in this project are: the use of new bioengineering elements in order to stabilize slope banks and to prevent erosion in town wall; replaced the hard defenses by bioengineering structures; facilitate natural regeneration of riparian vegetation.
The project has a total budget of 94.788,5 € and is financed by the Municipality of Besalú.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|