Case study:Refilling the meanders of the Colostre: Difference between revisions
Anna.polazzo (talk | contribs) No edit summary |
No edit summary |
||
(4 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 24: | Line 19: | ||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=1.Image2 .jpg | |||
|Caption=The Colostre canalised before restoration (1999). | |||
}} | |||
{{Case study image | |||
|File name=3.Image1 0.jpg | |||
|Caption=One of the Colostre meanders (2009). | |||
}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 167: | Line 174: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Weir removal | ||
|Planform / Channel pattern=Removal of poplars in old meanders,Re-meandering | |||
|Social measures=Agreement with the owners,Public meeting | |||
|Wider stakeholder / citizen engagement=River contract | |||
|Planform / Channel pattern= | |||
|Social measures= | |||
|Wider stakeholder / citizen engagement= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 255: | Line 250: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Case study documents | {{Case study documents | ||
Line 289: | Line 274: | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 14:43, 5 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | France |
Main contact forename | Vincent |
Main contact surname | Duru |
Main contact user ID | |
Contact organisation | FDPPMA Alpes-de-Haute-Provence |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Colostre, a tributary of the River Verdon, is a typically Mediterranean river, with very low water levels upstream of Riez and flash flooding due to storms. The Colostre constitutes one of the only breeding grounds for brown trout. The beaver has also been recorded in this area.
In the 1960s, following exceptional summer flooding, hydraulic improvements were made in order to modify the longitudinal profile of the river (resizing, straightening of the river and creation of weirs). These developments degraded the habitats of the river and caused significant erosion of the river banks.
In response to this situation, in 1996, state fishing institutes and the local fishing association, initiated a protection Plan with the aim of free movement of salmonids and rediversification of habitats. The restoration measures formed part of the implementation of this plan.
Thirteen meanders were restored. The disconnected meanders had not been filled in and instead had been left uncultivated; most of them thus remained identifiable. The first stage consisted of restoring access to the meanders by removing the poplars planted during the resizing of the river. Next, the current was diverted towards the old meanders which remained visible. The entrance to the straight channel was blocked using a submersible weir (consisted of timber billets covered with gravels, geotextile and protective mesh). The downstream part of the straight section was not closed off in order to allow for the dispersal of floodwaters. In areas in which the meanders were not identified, various experimental habitat diversification developments were carried out and weirs were removed or modified.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|