Case study:The Environmental River Enhancement Programme: Difference between revisions

From RESTORE
Jump to navigation Jump to search
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=53.46843072001158, -7.679443359375 }} {{Project overview |Project title=The Environmental River Enhancement ...")
 
No edit summary
 
(5 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Case study status
{{Case study status
|Approval status=Draft
|Approval status=Approved
}}
}}
{{Location
{{Location
Line 6: Line 6:
}}
}}
{{Project overview
{{Project overview
|Project title=The Environmental River Enhancement Programme
|Status=In progress
|Status=In progress
|Themes=Fisheries, Flood risk management, Hydromorphology
|Themes=Fisheries, Flood risk management, Hydromorphology
|Country=Ireland
|Country=Ireland
|Main contact forename=Denise  
|Main contact forename=Denise
|Main contact surname=Delaney
|Main contact surname=Delaney
|Main contact id=DelaneyD
|Contact organisation=Office of Public Works (Ireland)
|Contact organisation=Office of Public Works (Ireland)
|Contact organisation url=www.opw.ie
|Contact organisation url=www.opw.ie
|Partner organisations=Inland Fisheries Ireland,
|Multi-site=Yes
|Multi-site=Yes
|Project picture=Ire EREP.png
|Picture description=Map of EREP sites (2008-2010) Source: http://www.fisheriesireland.ie/Projects/erep.html
|Project summary=2008-2013 (5 year programme of works)
http://www.fisheriesireland.ie/Projects/erep.html
}}
}}
{{Image gallery}}
{{Image gallery end}}
{{Toggle button}}
{{Toggle content start}}
{{Case study subcatchment}}
{{Case study subcatchment}}
{{Site}}
{{Site}}
{{Project background}}
{{Project background
|Project started=2008/01/01
|Project completed=2013/12/31
|Total cost category=more than 10000 k€
}}
{{Motivations}}
{{Motivations}}
{{Measures}}
{{Measures}}
Line 31: Line 45:
{{Monitoring documents}}
{{Monitoring documents}}
{{Monitoring documents end}}
{{Monitoring documents end}}
{{Image gallery}}
{{Image gallery end}}
{{Additional Documents}}
{{Additional Documents}}
{{Additional Documents end}}
{{Additional Documents end}}
Line 38: Line 50:
{{Additional links and references footer}}
{{Additional links and references footer}}
{{Supplementary Information}}
{{Supplementary Information}}
{{Toggle content end}}

Latest revision as of 17:30, 6 September 2013

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 53° 28' 6.35" N, 7° 40' 46.00" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site
Themes Fisheries, Flood risk management, Hydromorphology
Country Ireland
Main contact forename Denise
Main contact surname Delaney
Main contact user ID User:DelaneyD
Contact organisation Office of Public Works (Ireland)
Contact organisation web site http://www.opw.ie
Partner organisations Inland Fisheries Ireland
This is a parent project
encompassing the following
projects
Map of EREP sites (2008-2010) Source: http://www.fisheriesireland.ie/Projects/erep.html

Project summary

Edit project overview to modify the project summary.


2008-2013 (5 year programme of works) http://www.fisheriesireland.ie/Projects/erep.html

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2008/01/01
Works started
Works completed
Project completed 2013/12/31
Total cost category more than 10000 k€
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information