Case study:Lippeaue Klostermersch: Difference between revisions
Jump to navigation
Jump to search
(XML import) |
No edit summary |
||
(6 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 13: | Line 8: | ||
51.6614,8.229 | 51.6614,8.229 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Themes=Economic aspects, Flood risk management, Monitoring | |||
|Country=Germany | |||
|Main contact forename=- | |||
|Main contact surname=- | |||
|Contact organisation=Staatliches Umweltamt Lippstadt | |||
|Themes= | |Multi-site=No | ||
|Project summary=Floodplain widening from 13m to 45m. | |||
|Country= | Bed heightened by 2m. | ||
|Main contact forename= | |||
|Main contact surname= | |||
|Contact organisation= | |||
|Multi-site= | |||
|Project summary= | |||
}} | }} | ||
{{Image_gallery}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 190: | Line 166: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Bed raising, Removal of rip-rap, | ||
|Floodplain / River corridor=Floodplain reconnection,Tree planting, Connection to wider floodplain, | |||
|Planform / Channel pattern=Former channel filled | |||
|Management interventions=More sensitive grazing | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
|Management interventions= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 292: | Line 256: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
Line 318: | Line 280: | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 09:16, 5 June 2017
Location: 51° 39' 41.04" N, 8° 13' 44.40" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Economic aspects, Flood risk management, Monitoring |
Country | Germany |
Main contact forename | - |
Main contact surname | - |
Main contact user ID | |
Contact organisation | Staatliches Umweltamt Lippstadt |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
Floodplain widening from 13m to 45m.
Bed heightened by 2m.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|