Case study:River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
Line 12: Line 7:
{{Project overview
{{Project overview
|Status=Complete
|Status=Complete
|Themes=Habitat and biodiversity, Water quality
|Country=Spain
|Country=Spain
|Main contact forename=Naturalea S.L.
|Main contact forename=Naturalea S.L.
Line 17: Line 13:
|Contact organisation=Naturalea S.L.
|Contact organisation=Naturalea S.L.
|Multi-site=No
|Multi-site=No
|Project picture=050 Rio Congost en La Garriga.jpg
|Project summary=The restored section has a length of 650m, a common channel between 4 and 6 m and a width of 35m in ordinary floods. The slope of the river terrace is bound by dikes and embankments in some places not stabilized in others and longitudinal continuity of the river influenced by two rip-raps. There are occupations of the river area for industrial activities and eventually discharges of debris. As relevant to vegetation, effects of overgrazing are detected and a significant proliferation of exotic species.
|Project summary=The restored section has a length of 650m, a common channel between 4 and 6 m and a width of 35m in ordinary floods. The slope of the river terrace is bound by dikes and embankments in some places not stabilized in others and longitudinal continuity of the river influenced by two rip-raps. There are occupations of the river area for industrial activities and eventually discharges of debris. As relevant to vegetation, effects of overgrazing are detected and a significant proliferation of exotic species.
The main objectives of this project are: limit the presence and possible expansion of invasive exotic species of vascular plants; removal of non-functional riprap stretches the right margin; increase morphological heterogeneity in the right margin; promote the recovery of native riparian vegetation; minimize the impact of human activities taking place in the fluvial environment and are likely to maintain or produce impacts; improving the landscape and the river ecosystem.
The main objectives of this project are: limit the presence and possible expansion of invasive exotic species of vascular plants; removal of non-functional riprap stretches the right margin; increase morphological heterogeneity in the right margin; promote the recovery of native riparian vegetation; minimize the impact of human activities taking place in the fluvial environment and are likely to maintain or produce impacts; improving the landscape and the river ecosystem.
The project has a total budget of 155.568,08 € and is financed by the Consorci of Besós.
The project has a total budget of 155.568,08 € and is financed by the Consorci of Besós.
}}
}}
{{Image gallery}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007.jpg
|Caption=Map of the restoration area
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 I.jpg
|Caption=Map of the restoration area
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 II.jpg
|Caption=Aerial view of the restoration area
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 III.jpg
|Caption=Photos of the area before works
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 IV.jpg
|Caption=Photos of the area before works
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 V.jpg
|Caption=Krainer type network placed in the area
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 VI.jpg
|Caption=Krainer type network placed in the area
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 VII.jpg
|Caption=Krainer type network placed in the area
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 VIII.jpg
|Caption=Photos of the removal of American reed (Arundo donax)
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 IX.jpg
|Caption=Photos of the removal of American reed (Arundo donax)
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 X.jpg
|Caption=Photos of the area before and after works
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 XI.jpg
|Caption=Photos of the area before and after works
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 XII.jpg
|Caption=Photos of the area before and after works
}}
{{Image_gallery_end}}
{{Toggle button}}
{{Toggle content start}}
{{Case_study_subcatchment
{{Case_study_subcatchment
|Subcatchment=
|Subcatchment=
Line 165: Line 217:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=New bioengineering elements in order to stabilize slope banks,Removal of rip-rap
   
|Floodplain / River corridor=Removal of exotic plants
   
      New bioengineering elements in order to stabilize slope banks,Removal rip-rap
|Floodplain / River corridor=
      Removal of exotic plants
|Planform / Channel pattern=
     
|Other technical measure=
     
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}
Line 192: Line 230:
{{Monitoring_documents}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Image gallery}}
 
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007.jpg
|Caption=Map of the restoration area
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 I.jpg
|Caption=Map of the restoration area
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 II.jpg
|Caption=Aerial view of the restoration area
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 III.jpg
|Caption=Photos of the area before works
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 IV.jpg
|Caption=Photos of the area before works
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 V.jpg
|Caption=Krainer type network placed in the area
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 VI.jpg
|Caption=Krainer type network placed in the area
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 VII.jpg
|Caption=Krainer type network placed in the area
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 VIII.jpg
|Caption=Photos of the removal of American reed (Arundo donax)
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 IX.jpg
|Caption=Photos of the removal of American reed (Arundo donax)
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 X.jpg
|Caption=Photos of the area before and after works
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 XI.jpg
|Caption=Photos of the area before and after works
}}
{{Case study image
|File name=051 Rio Congost en La Garriga PIRORIENTAL 007 XII.jpg
|Caption=Photos of the area before and after works
}}
{{Image_gallery_end}}
{{Additional Documents}}
{{Additional Documents}}
{{Case study documents
{{Case study documents
Line 256: Line 241:
{{Supplementary_Information
{{Supplementary_Information
|Information=
|Information=
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
     
}}
}}
{{Case_study_upload}}
{{Case_study_upload}}
{{Toggle content end}}

Latest revision as of 09:15, 5 June 2017

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 41° 39' 47.51" N, 2° 17' 20.00" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Water quality
Country Spain
Main contact forename Naturalea S.L.
Main contact surname Naturalea S.L.
Main contact user ID
Contact organisation Naturalea S.L.
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


The restored section has a length of 650m, a common channel between 4 and 6 m and a width of 35m in ordinary floods. The slope of the river terrace is bound by dikes and embankments in some places not stabilized in others and longitudinal continuity of the river influenced by two rip-raps. There are occupations of the river area for industrial activities and eventually discharges of debris. As relevant to vegetation, effects of overgrazing are detected and a significant proliferation of exotic species. The main objectives of this project are: limit the presence and possible expansion of invasive exotic species of vascular plants; removal of non-functional riprap stretches the right margin; increase morphological heterogeneity in the right margin; promote the recovery of native riparian vegetation; minimize the impact of human activities taking place in the fluvial environment and are likely to maintain or produce impacts; improving the landscape and the river ecosystem. The project has a total budget of 155.568,08 € and is financed by the Consorci of Besós.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Map of the restoration area
Map of the restoration area
Aerial view of the restoration area
Photos of the area before works
Photos of the area before works
Krainer type network placed in the area
Krainer type network placed in the area
Krainer type network placed in the area
Photos of the removal of American reed (Arundo donax)
Photos of the removal of American reed (Arundo donax)
Photos of the area before and after works
Photos of the area before and after works
Photos of the area before and after works
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Pirineo Oriental
River basin Besós

Subcatchment

River name Congost
Area category
Area (km2)
Maximum altitude category 200 - 500 m
Maximum altitude (m) 210 m0.21 km <br />21,000 cm <br />
Dominant geology
Ecoregion Ibero-Macaronesian
Dominant land cover
Waterbody ID



Site

Name Río Congost
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Sinuous
Reference morphology Sinuous
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category 5 - 10 m
Average bankfull channel width (m) 66 m <br />0.006 km <br />600 cm <br />
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 650 m0.65 km <br />65,000 cm <br />
Project started 2009/11/01
Works started
Works completed 2010/03/01
Project completed
Total cost category 100 - 500 k€
Total cost (k€) 155 k€155,000 € <br />
Benefit to cost ratio
Funding sources Consorci del Besós

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision Naturalea, S.L.
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Channel pattern/planform, Structure & condition of riparian zones
Biology
Physico-chemical
Other reasons for the project Landscape enhancement


Measures

Structural measures
Bank/bed modifications New bioengineering elements in order to stabilize slope banks, Removal of rip-rap
Floodplain / River corridor Removal of exotic plants
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information