Case study:Environmental restoration project of the river area of the Ripoll River as it passes through the municipality of Ripollet (Vallès Occidental): Difference between revisions
No edit summary |
No edit summary |
||
(5 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 12: | Line 7: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Environmental flows and water resources, Habitat and biodiversity, Social benefits, Urban | |||
|Country=Spain | |Country=Spain | ||
|Main contact forename=`Enginyeria, Estudios i Gestió Ambiental S.L. | |Main contact forename=`Enginyeria, Estudios i Gestió Ambiental S.L. | ||
Line 17: | Line 13: | ||
|Contact organisation=Enginyeria, Estudios i Gestió Ambiental S.L. | |Contact organisation=Enginyeria, Estudios i Gestió Ambiental S.L. | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=049 Rio Ripoll.jpg | |||
|Project summary=The stretch of the River Ripoll in which the project is located, is bounded longitudinally by longitudinal structures (walls and breakwaters) amending river morphology and determine the formation of river banks. The river also has transversal structures. The existing vegetation does not correspond to the potential vegetation due to the high population pressure on land that has suffered over time. There is an important agricultural pressure and few spaces are not occupied by gardens. | |Project summary=The stretch of the River Ripoll in which the project is located, is bounded longitudinally by longitudinal structures (walls and breakwaters) amending river morphology and determine the formation of river banks. The river also has transversal structures. The existing vegetation does not correspond to the potential vegetation due to the high population pressure on land that has suffered over time. There is an important agricultural pressure and few spaces are not occupied by gardens. | ||
The main objectives of this project are: remove the set up gardens in the area of the project; restore the original profile of the channel prior to the installation of the orchards; minimize the impact caused by waste, trash and debris; eliminate the presence of alien species; recovery hydrological, landscape and ecology of the river; encourage the stabilization and protection of river banks against erosion; enhancing the role of River Biological Corridor; inform the public about the river area as well as the objectives and work involved in the project. | The main objectives of this project are: remove the set up gardens in the area of the project; restore the original profile of the channel prior to the installation of the orchards; minimize the impact caused by waste, trash and debris; eliminate the presence of alien species; recovery hydrological, landscape and ecology of the river; encourage the stabilization and protection of river banks against erosion; enhancing the role of River Biological Corridor; inform the public about the river area as well as the objectives and work involved in the project. | ||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=050 Rio Ripoll PIRORIENTAL 005.JPG | |||
|Caption=Photos of the area before and after works | |||
}} | |||
{{Case study image | |||
|File name=050 Rio Ripoll PIRORIENTAL 005 I.JPG | |||
|Caption=Photos of the area before and after works | |||
}} | |||
{{Case study image | |||
|File name=050 Rio Ripoll PIRORIENTAL 005 II.JPG | |||
|Caption=Photos of the area before and after works | |||
}} | |||
{{Case study image | |||
|File name=050 Rio Ripoll PIRORIENTAL 005 III.JPG | |||
|Caption=Photos of the area before and after works | |||
}} | |||
{{Case study image | |||
|File name=050 Rio Ripoll PIRORIENTAL 005 IV.JPG | |||
|Caption=Photos of the area before and after works | |||
}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 164: | Line 184: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=New bioengineering elements in order to stabilize slope banks,Bank stabilisation | ||
|Floodplain / River corridor=Removal of irrigation canals,Elimination of structural elements concreted,Removal of exotic plants | |||
|Floodplain / River corridor= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 191: | Line 197: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{ | {{Additional Documents}} | ||
{{ | {{Case study documents | ||
|File name=050 Rio Ripoll.pdf | |||
|Description=Additional documentation (in Spanish) | |||
}} | |||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
{{Additional_links_and_references_header}} | {{Additional_links_and_references_header}} | ||
Line 220: | Line 228: | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 12:22, 31 May 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Habitat and biodiversity, Social benefits, Urban |
Country | Spain |
Main contact forename | `Enginyeria, Estudios i Gestió Ambiental S.L. |
Main contact surname | Enginyeria, Estudios i Gestió Ambiental S.L. |
Main contact user ID | |
Contact organisation | Enginyeria, Estudios i Gestió Ambiental S.L. |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The stretch of the River Ripoll in which the project is located, is bounded longitudinally by longitudinal structures (walls and breakwaters) amending river morphology and determine the formation of river banks. The river also has transversal structures. The existing vegetation does not correspond to the potential vegetation due to the high population pressure on land that has suffered over time. There is an important agricultural pressure and few spaces are not occupied by gardens.
The main objectives of this project are: remove the set up gardens in the area of the project; restore the original profile of the channel prior to the installation of the orchards; minimize the impact caused by waste, trash and debris; eliminate the presence of alien species; recovery hydrological, landscape and ecology of the river; encourage the stabilization and protection of river banks against erosion; enhancing the role of River Biological Corridor; inform the public about the river area as well as the objectives and work involved in the project.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|