Case study:Ems floodplain: Difference between revisions
Jump to navigation
Jump to search
(XML import) |
No edit summary |
||
(8 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 13: | Line 8: | ||
52.3774,7.33646 | 52.3774,7.33646 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Themes=Habitat and biodiversity, Hydromorphology, Monitoring, Social benefits | |||
|Country=Germany | |||
|Main contact forename=H | |||
|Main contact surname=Loheide | |||
|Contact organisation=(FORECASTER) | |||
|Themes= | |Multi-site=No | ||
|Project picture=Ems LIFE.jpg | |||
|Country= | |Picture description=Renatured river section of the Ems | ||
|Main contact forename= | |||
|Main contact surname= | |||
|Contact organisation= | |||
|Multi-site= | |||
|Project picture= | |||
|Picture description= | |||
}} | }} | ||
{{Image_gallery}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 190: | Line 166: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Removal of bank reinforcements, | ||
|Floodplain / River corridor=Develop riparian forest, Protect/restore riparian zone, | |||
|Planform / Channel pattern=Lengthening of channel, Channel widening, | |||
|Social measures=Wildlife improvement | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
|Social measures= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 296: | Line 260: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
Line 318: | Line 280: | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 15:21, 1 June 2017
Location: 52° 22' 38.64" N, 7° 20' 11.26" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Hydromorphology, Monitoring, Social benefits |
Country | Germany |
Main contact forename | H |
Main contact surname | Loheide |
Main contact user ID | |
Contact organisation | (FORECASTER) |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|