{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
Line 18: Line 13:
|Name of parent multi-site project=Case_study:Recovery "CañoTravieso
|Name of parent multi-site project=Case_study:Recovery "CañoTravieso
|Multi-site=Yes
|Multi-site=Yes
|Project summary=The project "Doñana 2005" aims to restore and rehabilitate the complex hydraulics of the marsh, allowing the system to evolve with the highest degree of naturalness and freedom possible within the constraints of the environment of social, economic, administrative, technical, cultural, etc.
There are some actuations included in this project: Route water: environmental restoration project for tourist use; Restoration of the marsh "Gallega"; Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros; Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes; Restoration of the stream of the Partido; Recovery of the functionality of Brazo de la Torre; and Recovery Caño Travieso.
The main objectives are:
*Restore water inputs to the marsh, in quantity and quality needed to restore the water dynamics of the marsh itself Doñana.
*To maintain, without interruption, the permeability between the marsh of Doñana and the Guadalquivir River estuary ensuring the incorporation of flows.
*Establish a system for evaluation and monitoring to enable a critical assessment of compliance with the plan and promote a research agenda and a specific line of disclosure, dissemination and presentation of results.
*Temporarily prevent the incorporation into the marsh of contaminated water or sediments, whereas such a risk. It is also necessary to prevent such waters can be incorporated into water systems or made available to any user.
}}
}}
{{Image_gallery}}
{{Image_gallery_end}}
{{Toggle button}}
{{Toggle content start}}
{{Case_study_subcatchment
{{Case_study_subcatchment
|Subcatchment=
|Subcatchment=
Line 268: Line 275:
{{Monitoring_documents}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Image_gallery}}
{{Image_gallery_end}}
{{Additional_Documents}}
{{Additional_Documents}}
{{Additional_Documents_end}}
{{Additional_Documents_end}}
Line 290: Line 295:
}}
}}
{{Case_study_upload}}
{{Case_study_upload}}
{{Toggle content end}}

Latest revision as of 16:10, 18 November 2014

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 36° 57' 47.02" N, 6° 25' 7.54" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes
Country Spain
Main contact forename to be filled
Main contact surname to be filled
Main contact user ID
Contact organisation MARM
Contact organisation web site
Partner organisations
This is a parent project
encompassing the following
projects
Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros, Recovery "CañoTravieso", Recovery of the functionality of Brazo de la Torre, Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes, Restoration of the marsh "Gallega", Restoration of the stream of the Partido
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The project "Doñana 2005" aims to restore and rehabilitate the complex hydraulics of the marsh, allowing the system to evolve with the highest degree of naturalness and freedom possible within the constraints of the environment of social, economic, administrative, technical, cultural, etc. There are some actuations included in this project: Route water: environmental restoration project for tourist use; Restoration of the marsh "Gallega"; Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros; Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes; Restoration of the stream of the Partido; Recovery of the functionality of Brazo de la Torre; and Recovery Caño Travieso.

The main objectives are:

  • Restore water inputs to the marsh, in quantity and quality needed to restore the water dynamics of the marsh itself Doñana.
  • To maintain, without interruption, the permeability between the marsh of Doñana and the Guadalquivir River estuary ensuring the incorporation of flows.
  • Establish a system for evaluation and monitoring to enable a critical assessment of compliance with the plan and promote a research agenda and a specific line of disclosure, dissemination and presentation of results.
  • Temporarily prevent the incorporation into the marsh of contaminated water or sediments, whereas such a risk. It is also necessary to prevent such waters can be incorporated into water systems or made available to any user.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology Sinuous
WFD water body name
Pre-project morphology Tidal, Sinuous
Reference morphology Tidal
Desired post project morphology
Heavily modified water body false
National/international site designation
Local/regional site designations National Park, Tidal
Protected species present
Invasive species present
Species of interest
Dominant hydrology Silt, Clay, Sand
Dominant substrate Extensive agriculture, Wetland
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient April"April" is not a number.
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started November/01/01
Works completed
Project completed
Total cost category
Total cost (k€) FEDER k€"FEDER k€" is not a number.
Benefit to cost ratio
Funding sources C.H.Guadalquivir, Tragsatec

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring Structure & condition of riparian zones



Reasons for river restoration

Mitigation of a pressure Landscape enhancement
Hydromorphology
Biology
Physico-chemical Pollution incident, Flood defence
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Removal of contaminated material, Restoring function of wetlands
Floodplain / River corridor
Planform / Channel pattern Landscape improvement of the area of the spill
Other Creating the post of Coordinator to drive the project "Doñana 2005"
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other Quantity & dynamics of flow, Continuity of sediment transport, Structure & condition of riparian zones


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]] Before measures implemented After measures implemented Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]]

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]] Pollution incident"Pollution incident" is not in the list (Improvement, Inconclusive, Awaiting results, Deterioration, No change) of allowed values for the "Physico-chemical monitoring result" property.

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Before measures implemented After measures implemented Qualitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information