Case study:Guadiamar Green Corridor Project: Difference between revisions
No edit summary |
No edit summary |
||
(5 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
|Location= | |Location=37.35487607348372, -6.233711242675781 | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Environmental flows and water resources, Fisheries, Habitat and biodiversity, Water quality | |||
|Country=Spain | |Country=Spain | ||
|Main contact forename=MARM | |Main contact forename=MARM | ||
Line 20: | Line 13: | ||
|Contact organisation=Junta de Andalucía | |Contact organisation=Junta de Andalucía | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=024 Rio Guadiamard.jpg | |||
|Project summary=In April 1998 there was a breach in a tailings pond in the Guadiamar River area, causing a spill of 6 million cubic hectometres of sludges with a high concentration of heavy metals (zinc, lead, arsenic, copper, antimony, thallium, cadmium). | |Project summary=In April 1998 there was a breach in a tailings pond in the Guadiamar River area, causing a spill of 6 million cubic hectometres of sludges with a high concentration of heavy metals (zinc, lead, arsenic, copper, antimony, thallium, cadmium). | ||
The objectives of this project were the Guadiamar River ecological restoration, removal of sludge and effluent pollutants, and creating a green corridor. In addition, we conducted a strategic planning for the different communities of macroinvertebrates, fish, reptiles, birds... The project included several monitoring programs and analysis, in particular, water quality, to see if the level of pollutants had decreased. | The objectives of this project were the Guadiamar River ecological restoration, removal of sludge and effluent pollutants, and creating a green corridor. In addition, we conducted a strategic planning for the different communities of macroinvertebrates, fish, reptiles, birds... The project included several monitoring programs and analysis, in particular, water quality, to see if the level of pollutants had decreased. | ||
This project of restoration and recovery of the area was carried out between 1998 and 2005. The total budget for carry out the rehabilitation and restoration of 62 Km of the Guadiamar River was 165.396.261€. The financing came from the MARM and the Consejería of Environment, Andalucía. | This project of restoration and recovery of the area was carried out between 1998 and 2005. The total budget for carry out the rehabilitation and restoration of 62 Km of the Guadiamar River was 165.396.261€. The financing came from the MARM and the Consejería of Environment, Andalucía. | ||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=025 Rio Guadiamar CHGUADALQUIVIR 010.jpg | |||
|Caption=Aerial view | |||
}} | |||
{{Case study image | |||
|File name=025 Rio Guadiamar CHGUADALQUIVIR 010 I.jpg | |||
|Caption=Map of the area affected by the flood | |||
}} | |||
{{Case study image | |||
|File name=025 Rio Guadiamar CHGUADALQUIVIR 010 II.jpg | |||
|Caption=Photo of the Agrio River and Guadiamar floodplain after flood of toxic sludges. | |||
}} | |||
{{Case study image | |||
|File name=025 Rio Guadiamar CHGUADALQUIVIR 010 III.jpg | |||
|Caption=Cleaning and conditioning of slopes | |||
}} | |||
{{Case study image | |||
|File name=025 Rio Guadiamar CHGUADALQUIVIR 010 IV.jpg | |||
|Caption=Mechanical removal of sludges from the riverbed | |||
}} | |||
{{Case study image | |||
|File name=025 Rio Guadiamar CHGUADALQUIVIR 010 V.jpg | |||
|Caption=Aerial view of Guadiamar river floodplain after works | |||
}} | |||
{{Case study image | |||
|File name=025 Rio Guadiamar CHGUADALQUIVIR 010 VI.jpg | |||
|Caption=Guadiamar riverside forest | |||
}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 168: | Line 193: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Recovering connectivity longitudinal and transversal | ||
|Floodplain / River corridor=Buffer strips,Recovery of dynamic river system, Restoring riparian vegetation, | |||
|Planform / Channel pattern=Remove drains and pipes | |||
|Other technical measure=Elimination of pollutants due to the discharge of toxic sludge,Recovering natural habitats,Recovering natural landscapes | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
|Other technical measure= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 292: | Line 305: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{ | {{Additional Documents}} | ||
{{Case study | {{Case study documents | ||
|File name=025 Rio Guadiamar | |File name=025 Rio Guadiamar.pdf | ||
| | |Description=Additional documentation (in Spanish) | ||
}} | }} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
{{Additional_links_and_references_header}} | {{Additional_links_and_references_header}} | ||
Line 342: | Line 329: | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 11:51, 1 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Fisheries, Habitat and biodiversity, Water quality |
Country | Spain |
Main contact forename | MARM |
Main contact surname | MARM |
Main contact user ID | |
Contact organisation | Junta de Andalucía |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
In April 1998 there was a breach in a tailings pond in the Guadiamar River area, causing a spill of 6 million cubic hectometres of sludges with a high concentration of heavy metals (zinc, lead, arsenic, copper, antimony, thallium, cadmium).
The objectives of this project were the Guadiamar River ecological restoration, removal of sludge and effluent pollutants, and creating a green corridor. In addition, we conducted a strategic planning for the different communities of macroinvertebrates, fish, reptiles, birds... The project included several monitoring programs and analysis, in particular, water quality, to see if the level of pollutants had decreased.
This project of restoration and recovery of the area was carried out between 1998 and 2005. The total budget for carry out the rehabilitation and restoration of 62 Km of the Guadiamar River was 165.396.261€. The financing came from the MARM and the Consejería of Environment, Andalucía.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros, Recovery "CañoTravieso", Recovery of the functionality of Brazo de la Torre, Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes, Restoration of the stream of the Partido
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|