Case study:Hurdalselva - River Hurdalselv: Difference between revisions
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=60.419276195989866, 11.06048583984375 }} {{Project overview |Project title=Hurdalselva - River Hurdalselv |S...") |
No edit summary |
||
(9 intermediate revisions by 3 users not shown) | |||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Fisheries, Habitat and biodiversity | |Themes=Fisheries, Habitat and biodiversity | ||
Line 12: | Line 11: | ||
|Main contact forename=Bjørn Otto | |Main contact forename=Bjørn Otto | ||
|Main contact surname=Dønnum | |Main contact surname=Dønnum | ||
|Main contact id=Arolam | |||
|Multi-site=No | |Multi-site=No | ||
}} | }} | ||
{{Case study subcatchment}} | {{Image gallery}} | ||
{{Site}} | {{Image gallery end}} | ||
{{Project background}} | {{Toggle button}} | ||
{{Motivations}} | {{Toggle content start}} | ||
{{Case study subcatchment | |||
|Subcatchment=002-1568-R | |||
}} | |||
{{Site | |||
|Name=Hurdalselva | |||
|WFD (national) typology=REM1221 | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|Invasive species present=No | |||
|Species=brown trout (Salmo trutta), | |||
|Dominant substrate=Cobble, Gravel, bedrock | |||
|River corridor land use=Mainly forest on the west side of the river and in the upper part of the watershed. Some agriculture (rye, barley) along part of the north-east bank of the project site. Forest is dominantly conifers, but deciduous trees and bushes constitutes apprx. 50% of riparian vegetation | |||
|Average bankfull channel width category=10 - 50 m | |||
|Average bankfull channel depth category=0.5 - 2 m | |||
|Mean discharge category=1 - 10 m³/s | |||
|Average channel gradient category=more than 0.1 | |||
}} | |||
{{Project background | |||
|Reach length directly affected=1100 | |||
|Total1 cost=32 | |||
|Funding sources=Norwegian Water Resources and Energy Directorate (NVE), private funding, Local fishing associations, | |||
|Invst and design cost=5 | |||
|Investigation and design Lead organisation=NJFF-Akershus | |||
|Investigation and design Other contact forename=Bjørn Otto | |||
|Investigation and design Other contact surname=Dønnum | |||
|stk engagement cost=1 | |||
|Stakeholder engagement Lead organisation=Hurdal JFF | |||
|Wrk and supervision cost=26 | |||
|Works and supervision Lead organisation=NVE | |||
|Supplementary funding information=This was..... | |||
}} | |||
{{Motivations | |||
|Specific mitigation=Flow channelization | |||
|Other motivation=Improving aestethics of the river and riverbank. | |||
}} | |||
{{Measures}} | {{Measures}} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
Line 29: | Line 64: | ||
{{Monitoring documents}} | {{Monitoring documents}} | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Additional Documents end}} | {{Additional Documents end}} | ||
{{Additional links and references header}} | {{Additional links and references header}} | ||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information | ||
|Information=The works in this particular river stretch was initiated to test different restoration techniques in a rather high gradient river (part of the river section has a gradient of 1,5%). Two days after completion of the in-river works, a large flood (estimated to be a 1:50-year return flood) destroyed part of the constructions. Not very encouraging for the local angling club, because the project was meant to be part of a larger project. Funding however stopped after the trial, and there has not been any attempt to restart the project. | |||
}} | |||
{{Toggle content end}} |
Latest revision as of 13:32, 1 November 2018
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Habitat and biodiversity |
Country | Norway |
Main contact forename | Bjørn Otto |
Main contact surname | Dønnum |
Main contact user ID | User:Arolam |
Contact organisation | |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Site
Project background
Cost for project phases
Supplementary funding informationThis was.....
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information The works in this particular river stretch was initiated to test different restoration techniques in a rather high gradient river (part of the river section has a gradient of 1,5%). Two days after completion of the in-river works, a large flood (estimated to be a 1:50-year return flood) destroyed part of the constructions. Not very encouraging for the local angling club, because the project was meant to be part of a larger project. Funding however stopped after the trial, and there has not been any attempt to restart the project.
|