Case study:Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz.: Difference between revisions
No edit summary |
No edit summary |
||
(4 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 19: | Line 14: | ||
|Name of parent multi-site project=Case_study:Environmental restoration of the river Zújar | |Name of parent multi-site project=Case_study:Environmental restoration of the river Zújar | ||
|Multi-site=No | |Multi-site=No | ||
|Project summary= | |Project summary=The Zújar project is part of the National Strategy for River Restoration (an initiative of the Ministry of Environment, developed in the Zújar River by the Confederación Hidrográfica del Guadiana) and the State Special Fund to Revitalize Economy and Jobs (Plan E). The full project covers 30 km of the river, and to facilitate the execution of the works it was divided into four sub-projects. | ||
The main objectives of the project were: restoration and conservation of riparian vegetation; restoration of the longitudinal and lateral connectivity of the fluvial ecosystem; preservation of the Public Hydraulic Domain from new pressures; environmental education and awareness through the development of outreach activities; enable wildlife mobility; monitoring the biological and physical factors of the reach. The total budget to carry out the rehabilitation and restoration of 30 Km of the Zújar river was 16.240.282 €. The extent of the project is limited to the Public Hydraulic Domain as the first stage of what could be -thanks to land acquisition- a more ambitious floodplain restoration project. | |||
}} | |||
{{Image gallery}} | |||
{{Case study image | |||
|File name=031 Rio Zujar Espolon CHGUADIANA 002.jpg | |||
|Caption=Aerial view of the restoration area | |||
}} | |||
{{Case study image | |||
|File name=031 Rio Zujar Espolon CHGUADIANA 002 I.jpg | |||
|Caption=Picture of the restoration area | |||
}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 194: | Line 200: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{ | {{Additional Documents}} | ||
{{ | {{Case study documents | ||
|File name=031 Rio Zujar Espolon.pdf | |||
|Description=Additional documentation (in Spanish) | |||
}} | |||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
{{Additional_links_and_references_header}} | {{Additional_links_and_references_header}} | ||
Line 202: | Line 210: | ||
{{Supplementary_Information | {{Supplementary_Information | ||
|Information= | |Information= | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 21:50, 16 January 2014
Project overview
Status | Complete |
---|---|
Project web site | http://www.mma.es/secciones/acm/aguas_continent_zonas_asoc/dominio_hidraulico/conserv_restaur/pdf/Rio_Zujar_Espolon.pdf |
Themes | |
Country | Spain |
Main contact forename | CHGuadiana |
Main contact surname | CHGuadiana |
Main contact user ID | |
Contact organisation | MARM |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Zújar project is part of the National Strategy for River Restoration (an initiative of the Ministry of Environment, developed in the Zújar River by the Confederación Hidrográfica del Guadiana) and the State Special Fund to Revitalize Economy and Jobs (Plan E). The full project covers 30 km of the river, and to facilitate the execution of the works it was divided into four sub-projects.
The main objectives of the project were: restoration and conservation of riparian vegetation; restoration of the longitudinal and lateral connectivity of the fluvial ecosystem; preservation of the Public Hydraulic Domain from new pressures; environmental education and awareness through the development of outreach activities; enable wildlife mobility; monitoring the biological and physical factors of the reach. The total budget to carry out the rehabilitation and restoration of 30 Km of the Zújar river was 16.240.282 €. The extent of the project is limited to the Public Hydraulic Domain as the first stage of what could be -thanks to land acquisition- a more ambitious floodplain restoration project.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Environmental restoration of the river Zújar, Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz., Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz., Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz., Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz.
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|