Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba): Difference between revisions
No edit summary |
No edit summary |
||
(4 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 12: | Line 7: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Environmental flows and water resources, Habitat and biodiversity, Hydromorphology | |||
|Country=Spain | |Country=Spain | ||
|Main contact forename=Antonio | |Main contact forename=Antonio | ||
Line 18: | Line 14: | ||
|Contact organisation url=www.mediodes.com/ | |Contact organisation url=www.mediodes.com/ | ||
|Multi-site=No | |Multi-site=No | ||
|Project summary= This reach of the Anzur River at Aldea de Nacimiento (Rute municipality, Cordoba, Spain) had flooding and incision problems. The riparian vegetation was altered by the presence of exotic species (Arundo donax) or the absence of coverage by native species. Other problem related to the urbanization was the presence of debris and waste at the channel. | |Project picture=011 Rio Anzur.jpg | ||
|Project summary=This reach of the Anzur River at Aldea de Nacimiento (Rute municipality, Cordoba, Spain) had flooding and incision problems. The riparian vegetation was altered by the presence of exotic species (Arundo donax) or the absence of coverage by native species. Other problem related to the urbanization was the presence of debris and waste at the channel. | |||
The project aimed to reduce the floods by increasing the width of the channel and its hydraulic capacity. Along with this intervention, there were other actions, based on bioengineering techniques or materials that allow their environmental integration, with the objective of improve the environmental condition of the reach and the landscape. | The project aimed to reduce the floods by increasing the width of the channel and its hydraulic capacity. Along with this intervention, there were other actions, based on bioengineering techniques or materials that allow their environmental integration, with the objective of improve the environmental condition of the reach and the landscape. | ||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=012 Rio Anzur CHGUADALQUIVIR 001.jpg | |||
|Caption=Map of the area of action | |||
}} | |||
{{Case study image | |||
|File name=012 Rio Anzur CHGUADALQUIVIR 001 I.jpg | |||
|Caption=Aerial view of Anzur River | |||
}} | |||
{{Case study image | |||
|File name=012 Rio Anzur CHGUADALQUIVIR 001 II.jpg | |||
|Caption=Image of the river upstream the village "Aldea del Nacimiento" before the works | |||
}} | |||
{{Case study image | |||
|File name=012 Rio Anzur CHGUADALQUIVIR 001 III.jpg | |||
|Caption=Image of the river upstream the village "Aldea del Nacimiento" after the works | |||
}} | |||
{{Case study image | |||
|File name=012 Rio Anzur CHGUADALQUIVIR 001 IV.jpg | |||
|Caption=Riverbed incision before the performance | |||
}} | |||
{{Case study image | |||
|File name=012 Rio Anzur CHGUADALQUIVIR 001 V.jpg | |||
|Caption=Riverbed incision after the performance | |||
}} | |||
{{Case study image | |||
|File name=012 Rio Anzur CHGUADALQUIVIR 001 VI.jpg | |||
|Caption=Anzur River before works | |||
}} | |||
{{Case study image | |||
|File name=012 Rio Anzur CHGUADALQUIVIR 001 VII.jpg | |||
|Caption=Anzur River during works | |||
}} | |||
{{Case study image | |||
|File name=012 Rio Anzur CHGUADALQUIVIR 001 VIII.jpg | |||
|Caption=Anzur River after works | |||
}} | |||
{{Case study image | |||
|File name=012 Rio Anzur CHGUADALQUIVIR 001 IX.jpg | |||
|Caption=Anzur River flood in a moment before the performance | |||
}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 165: | Line 205: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Bank stabilisation,Prevent and reduce bank erosion with live stakes | ||
|Floodplain / River corridor=Silvicultural treatments | |||
|Planform / Channel pattern=Protection and correction of incision problems,Improvement of channel morphology | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 192: | Line 219: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Case study documents | {{Case study documents | ||
Line 225: | Line 250: | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 12:22, 31 May 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Habitat and biodiversity, Hydromorphology |
Country | Spain |
Main contact forename | Antonio |
Main contact surname | Garrido |
Main contact user ID | |
Contact organisation | MEDIODÉS |
Contact organisation web site | http://www.mediodes.com/ |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This reach of the Anzur River at Aldea de Nacimiento (Rute municipality, Cordoba, Spain) had flooding and incision problems. The riparian vegetation was altered by the presence of exotic species (Arundo donax) or the absence of coverage by native species. Other problem related to the urbanization was the presence of debris and waste at the channel.
The project aimed to reduce the floods by increasing the width of the channel and its hydraulic capacity. Along with this intervention, there were other actions, based on bioengineering techniques or materials that allow their environmental integration, with the objective of improve the environmental condition of the reach and the landscape.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|