Case study:Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(20 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
Line 12: Line 6:
}}
}}
{{Project overview
{{Project overview
|Status=Complete
|Status=Planned
|Themes=Habitat and biodiversity
|Themes=Habitat and biodiversity
|Country=Bulgaria
|Country=Bulgaria
Line 20: Line 14:
|Contact organisation url=www.dimitrovgrad.bg/
|Contact organisation url=www.dimitrovgrad.bg/
|Multi-site=No
|Multi-site=No
|Project picture=Before restoration 1.JPG
|Project summary=Project Objectives are the following:
1. Recovery and long-term conservation of habitats and species of European conservation importance in protected area "Reka Maritsa";
2. The restoration of habitat types 92A0, 91F0 and 92 D0; protected in protected area "Reka Maritsa;
3. Reducing the negative impact and spread of invasive and introduction species.
4. Improvement of habitats and populations of fish species protected in the protected area.
5. Improvement of the populations of hollow-nesting species of European and national conservation importance.
6. Raising public awareness and general environmental awareness related to the environment and species for protection.
}}
{{Image gallery}}
{{Case study image
|File name=Before restoration 1.JPG
|Caption=Before restoration
}}
{{Case study image
|File name=Black Stork.JPG
|Caption=Black stork
}}
{{Case study image
|File name=Before restoration 1.JPG
|Caption=Before restoration
}}
{{Case study image
|File name=Black Stork.JPG
|Caption=Black stork
}}
{{Image_gallery_end}}
{{Toggle button}}
{{Toggle content start}}
{{Case_study_subcatchment
|Subcatchment=
   
   
      Maritsa
}}
}}
{{Case study subcatchment}}
{{Site
{{Site
|Name=Protected area "Reka Maritsa"
|Name=
|WFD water body code=BG3MA350R039
   
|WFD (national) typology=TR20
   
|Pre-project morphology=Embanked
      protected area "Reka Maritsa"
|Reference morphology=Sinuous
|WFD water body code=
|Heavily modified water body=Yes
      BG3MA350R039
|Site designation=EU - Special Area of Conservation
|WFD (national) typology=
|Protected species present=No
      TR20
|Invasive species present=No
|WFD water body name=
|Dominant hydrology=Artificially regulated
     
|Dominant substrate=Sand
|Pre-project morphology=
|River corridor land use=Plantation forestry
      Embanked
|Average bankfull channel width category=more than 50 m
|Reference morphology=
|Average bankfull channel depth category=0.5 - 2 m
      Sinuous
|Mean discharge category=10 - 100 m³/s
|Heavily modified water body=
      true
|Local site designation=
     
|Site designation=
      EU - Special Area of Conservation
|Protected species present=
     
|Invasive species present=
     
|Species=
     
|Dominant hydrology=
     
|Dominant substrate=
      Sand
|River corridor land use=
      Plantation forestry
|Average bankfull channel width category=
      more than 50 m
|Avrg bankfull channel width=
     
|Average bankfull channel depth category=
      0.5 - 2 m
|Avrg1 bankfull channel depth=
     
|Mean discharge category=
     
|Mn discharge=
     
|Average channel gradient category=
     
|Avrg channel gradient=
     
}}
}}
{{Project background
{{Project_background
|Total cost category=500 - 1000 k€
|Reach length directly affected=
|Funding sources=Operative programme "Environment"2007-2013
   
   
     
|Project started=
      2009/02/01
|Works started=
     
|Works completed=
      2012/02/01
|Project completed=
     
|Total cost category=
      500 - 1000 k€
|Total1 cost=
      851 k€
|Funding sources=
      Operative programme "Environment"2007-2013
|Investigation and design cost category=
     
|Invst and design cost=
     
|Investigation and design Lead organisation=
     
|Investigation and design Other contact forename=
     
|Investigation and design Other contact surname=
     
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
     
|Stakeholder engagement Other contact forename=
     
|Stakeholder engagement Other contact surname=
     
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
     
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Motivations
Line 47: Line 186:
      
      
      
      
        
       Structure & condition of riparian/ lake shore zones
|Biological quality elements=
|Biological quality elements=
        
       Fish: Abundance
|Physico-chemical quality elements=
|Physico-chemical quality elements=
        
        
|Specific mitigation=
|Specific mitigation=
        
       Riparian development
|Other motivation=
|Other motivation=
        
        
Line 61: Line 200:
      
      
      
      
        
       Aforestation
|Floodplain / River corridor=
|Floodplain / River corridor=
        
        
Line 85: Line 224:
{{Monitoring_documents}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Image_gallery}}
{{Additional Documents}}
{{Image_gallery_end}}
{{Case study documents
{{Additional_Documents}}
|File name=Map 1.pdf
|Description=Map_1
}}
{{Case study documents
|File name=Map 2.pdf
|Description=Map_2
}}
{{Case study documents
|File name=Map 3.pdf
|Description=Map_3
}}
{{Case study documents
|File name=Map 4.pdf
|Description=Map_4
}}
{{Case study documents
|File name=Map 5.pdf
|Description=Map_5
}}
{{Case study documents
|File name=Map 6.pdf
|Description=Map_6
}}
{{Case study documents
|File name=Map 7.pdf
|Description=Map_7
}}
{{Additional_Documents_end}}
{{Additional_Documents_end}}
{{Additional_links_and_references_header}}
{{Additional links and references header}}
{{Additional links and references
|Link=www.greenbalkans.org/show.php?id=1872&language=bg_BG&cat_id=4
|Description=NGO Green Balkans
}}
{{Additional_links_and_references_footer}}
{{Additional_links_and_references_footer}}
{{Supplementary_Information
{{Supplementary_Information
Line 114: Line 283:
}}
}}
{{Case_study_upload}}
{{Case_study_upload}}
{{Toggle content end}}

Latest revision as of 22:16, 14 November 2013

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 42° 3' 52.36" N, 25° 38' 18.58" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Planned
Project web site
Themes Habitat and biodiversity
Country Bulgaria
Main contact forename Plamen
Main contact surname Mitkov
Main contact user ID
Contact organisation Dimitrovgrad municipality
Contact organisation web site http://www.dimitrovgrad.bg/
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


Project Objectives are the following:

1. Recovery and long-term conservation of habitats and species of European conservation importance in protected area "Reka Maritsa";

2. The restoration of habitat types 92A0, 91F0 and 92 D0; protected in protected area "Reka Maritsa;

3. Reducing the negative impact and spread of invasive and introduction species.

4. Improvement of habitats and populations of fish species protected in the protected area.

5. Improvement of the populations of hollow-nesting species of European and national conservation importance.

6. Raising public awareness and general environmental awareness related to the environment and species for protection.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Before restoration
Black stork



Before restoration
Black stork
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district East Aegean
River basin Maritsa

Subcatchment

River name Maritsa
Area category more than 10000 km²
Area (km2)
Maximum altitude category Less than 100 m
Maximum altitude (m)
Dominant geology Siliceous
Ecoregion Eastern Balkan
Dominant land cover Intensive agriculture (arable)
Waterbody ID



Other case studies in this subcatchment: Restoration and conservation of the protected site "Lozenski pat" - wetland, Restoration, protection and sustainable development of protected area "Zlato pole"


Site

Name protected area "Reka Maritsa"
WFD water body codes BG3MA350R039
WFD (national) typology TR20
WFD water body name
Pre-project morphology Embanked
Reference morphology Sinuous
Desired post project morphology
Heavily modified water body true
National/international site designation EU - Special Area of Conservation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate Sand
River corridor land use Plantation forestry
Average bankfull channel width category more than 50 m
Average bankfull channel width (m)
Average bankfull channel depth category 0.5 - 2 m
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2009/02/01
Works started
Works completed 2012/02/01
Project completed
Total cost category 500 - 1000 k€
Total cost (k€) 851 k€851,000 € <br />
Benefit to cost ratio
Funding sources Operative programme "Environment"2007-2013

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Riparian development
Hydromorphology Structure & condition of riparian/ lake shore zones
Biology Fish: Abundance
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Aforestation
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://www.greenbalkans.org/show.php?id=1872&language=bg BG&cat id=4 NGO Green Balkans

Supplementary Information

Edit Supplementary Information