Case study:Isar-Plan: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(33 intermediate revisions by 6 users not shown) | |||
Line 7: | Line 7: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Hydromorphology, Monitoring, Spatial planning | |Project web site url=www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm | ||
|Themes=Fisheries, Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality, Urban | |||
|Country=Germany | |Country=Germany | ||
|Main contact forename= | |Main contact forename=Matthias | ||
|Main contact surname= | |Main contact surname=Junge | ||
| | |Contact organisation=State Office for Water Management Munich | ||
|Contact organisation= | |Contact organisation url=www.wwa-m.bayern.de/index.htm | ||
|Partner organisations=River Restoration Centre, | |||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Before-After Isar.png | |Project picture=Before-After Isar.png | ||
|Picture description=Straightened Isar (left) and restored diversified channel (Right) | |Picture description=Straightened Isar (left) and restored diversified channel (Right) | ||
|Project summary=The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were: | |||
1) Flood protection | |||
2) Enhancing Species diversity and ecological restoration | |||
3) Improving leisure and recreation | |||
|Monitoring surveys and results=The project is being currently monitored. | |||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=Isar river.JPG | |||
|Caption=Isar river in Munich 2013 | |||
}} | |||
{{Case study image | |||
|File name=IMG 6876.JPG | |||
|Caption=Isar River | |||
}} | |||
{{Case study image | |||
|File name=IMG 6889.JPG | |||
|Caption=Isar River Munich | |||
}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case_study_subcatchment | {{Case_study_subcatchment | ||
|Subcatchment= | |Subcatchment= | ||
Line 24: | Line 47: | ||
}} | }} | ||
{{Site | {{Site | ||
|Name= | |Name=Munich | ||
|WFD water body code=DE16_147237_173317 | |||
|WFD (national) typology=Type 4 "gravel and stone embossed flow of the Alpine foothills" | |||
|Pre-project morphology=Straight,Revetments,Embanked,Impounded | |||
|WFD water body code= | |Reference morphology=Braided,High width:depth | ||
|Heavily modified water body=No | |||
|WFD (national) typology= | |Site designation=Germany - Landschaftschutzgebiet | ||
|Local site designation=Landschaftsschutzgebiet/ Naturschutzgebiet | |||
|Protected species present=Yes | |||
|Invasive species present=Yes | |||
|Pre-project morphology= | |Species=European green toad (Bufo viridis), little ringed plover (Charadrius dubius), Fish: huchen (Hucho hucho), nase (Chondrostoma nasus), grayling (Thymallus thymallus), burbot (Lota lota), brown trout (Salmo trutta), barbel (Barbus barbus) and chub (Leuciscus cephalus). Flora.rock roses (Helianthemum spp.), broomrapes (Orobanche spp.), meadow clary (Salvia pratensis), quaking grass (Briza media) and the Carthusian pink crocus (Dianthus carthusianorum) Butterflies:Idas blue (Plebejus idas) and common blue (Polyommatus icarus) | ||
|Dominant hydrology=Quick and varying run-off | |||
|Reference morphology= | |Dominant substrate=Gravel- largely limestone | ||
|River corridor land use=Urban, Forest, Flood plains | |||
|Heavily modified water body= | |Average bankfull channel width category=more than 50 m | ||
|Average bankfull channel depth category=0.5 - 2 m | |||
| | |Mean discharge category=10 - 100 m³/s | ||
|Mn discharge=63.7 | |||
| | |||
|Protected species present= | |||
|Invasive species present= | |||
|Species= | |||
|Dominant hydrology= | |||
|Dominant substrate= | |||
|River corridor land use= | |||
|Average bankfull channel width category= | |||
|Average bankfull channel depth category= | |||
|Mean discharge category= | |||
|Mn discharge= | |||
}} | }} | ||
{{ | {{Project background | ||
|Reach length directly affected= | |Reach length directly affected=8000 m | ||
|Project started=1998/01/01 | |||
|Works completed=2011/08/31 | |||
|Total cost category=more than 10000 k€ | |||
|Project started= | |Total1 cost=35000€ | ||
|Funding sources=City of Munich,Free state of Bavaria | |||
|Investigation and design cost category=more than 10000 k€ | |||
|Investigation and design Lead organisation=State Office for Water Management Munich | |||
|Works completed= | |Investigation and design Other contact forename=Matthias | ||
|Investigation and design Other contact surname=Junge | |||
|Stakeholder1 engagement cost category=more than 10000 k€ | |||
|Stakeholder engagement Lead organisation=City of Munich | |||
|Total cost category= | |Stakeholder engagement Other contact forename=Peter | ||
|Stakeholder engagement Other contact surname=Schaller | |||
|Total1 cost= | |Works1 and supervision cost category=more than 10000 k€ | ||
|Works and supervision Lead organisation=State Office for Water Management Munich | |||
|Funding sources= | |Works and supervision Other contact forename=Stefan | ||
|Works and supervision Other contact surname=Kirner | |||
|Investigation and design cost category= | |Post-project1 management and maintenance cost category=more than 10000 k€ | ||
|Post-project management and maintenance Lead organisation=State Office for Water Management & City of Munich | |||
|Monitoring1 cost category=more than 10000 k€ | |||
|Monitoring Lead organisation=State Office for Water Management | |||
|Investigation and design Lead organisation= | |||
|Investigation and design Other contact forename= | |||
|Investigation and design Other contact surname= | |||
|Stakeholder1 engagement cost category= | |||
|Stakeholder engagement Lead organisation= | |||
|Stakeholder engagement Other contact forename= | |||
|Stakeholder engagement Other contact surname= | |||
|Works1 and supervision cost category= | |||
|Works and supervision Lead organisation= | |||
|Works and supervision Other contact forename= | |||
|Works and supervision Other contact surname= | |||
|Post-project1 management and maintenance cost category= | |||
|Post-project management and maintenance Lead organisation= | |||
|Monitoring1 cost category= | |||
|Monitoring Lead organisation= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Hydromorphological quality elements= | |Specific mitigation=Riparian development | ||
|Hydromorphological quality elements=Structure & condition of riparian zones,Continuity of sediment transport, Quantity & dynamics of flow, | |||
|Biological quality elements=Fish: Abundance, Habitats, Invertebrates: Disturbance-sensitive species, | |||
|Physico-chemical quality elements=Bathing water quality | |||
|Biological quality elements= | |Other motivation=Improvement of Flood Protection, Landscape enhancement,Recreation | ||
|Physico-chemical quality elements= | |||
|Other motivation= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Deepening of river floor, Removal of bank reinforcements, Creation of gravel banks, Bank reprofiling, | ||
|Floodplain / River corridor=Large scale planting of native species, Creation of a flood expansion area, | |||
|Planform / Channel pattern=Channel widening,Creation of willow island,Creation of braided channel, Channel naturalisation, | |||
|Other technical measure=embedding of rootballs and tree trunks, Creation of new bicycle path, natural seating stones places on banks | |||
|Floodplain / River corridor= | |Management interventions=Waste management, provision of temporary toilet facilities | ||
|Social measures=Information for the public | |||
|Planform / Channel pattern= | |||
|Other technical measure= | |||
|Management interventions= | |||
|Social measures= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 248: | Line 176: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
{{ | {{Additional links and references header}} | ||
{{Additional links and references | |||
|Link=www.restorerivers.eu/Portals/27/NiveditaMahida_session05_ECRR2013_Isar-Plan.pdf | |||
|Description=presentation by N. Mahida | |||
}} | |||
{{Additional links and references | |||
|Link=www.youtube.com/watch?v=JV4Yt9j-h_Y&feature=youtu.be | |||
|Description=N. Mahida talking on you Tube about the Isar | |||
}} | |||
{{Additional_links_and_references_footer}} | {{Additional_links_and_references_footer}} | ||
{{Supplementary_Information | {{Supplementary_Information | ||
Line 270: | Line 204: | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 16:01, 2 January 2019
Location: 48° 7' 40.09" N, 11° 34' 41.73" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | http://www.wwa-m.bayern.de/projekte_und_programme/isarplan/index.htm |
Themes | Fisheries, Flood risk management, Habitat and biodiversity, Hydropower, Hydromorphology, Land use management - forestry, Monitoring, Social benefits, Spatial planning, Water quality, Urban |
Country | Germany |
Main contact forename | Matthias |
Main contact surname | Junge |
Main contact user ID | |
Contact organisation | State Office for Water Management Munich |
Contact organisation web site | http://www.wwa-m.bayern.de/index.htm |
Partner organisations | River Restoration Centre |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
The Isar Plan Project is a river restoration project on a stretch of 8Km in the inner city of Munich. The Project was initiated in 2000 and the last site was completed by 2011. The three main goals of the project were:
1) Flood protection
2) Enhancing Species diversity and ecological restoration
3) Improving leisure and recreation
Monitoring surveys and results
Edit project overview to modify the Monitoring survey and results.
The project is being currently monitored.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|